# US 2021/0264344 A1 · Project assistance system, project assistance device, and project assistance method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0264344 A1
- Document ID: US20210264344A1
- Status: Published application
- Kind: A1
- Application number: 17/253,686
- Filed: 2019-05-27
- Published: 2021-08-26
- Earliest claimed: 2018-07-13
- Assignees: Hitachi, Ltd.
- Applicants: Hitachi, Ltd.
- Inventors: Masumi KAWAKAMI
- Web page: https://patentgrep.com/patent/US20210264344A1

## CPC

- G06Q 10/063: Operations research, analysis or management
- G06Q 10/063114: {Status monitoring or status determination for a person or group}
- G06Q 10/063118: {Staff planning in a project environment}
- G06Q 10/06316: {Sequencing of tasks or work}
- G06Q 10/0633: Workflow analysis
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

There is provided a project assistance system capable of improving the efficiency of project management. A correspondence estimation processing unit calculates correspondence information between project plan information and project execution information along with a reliability, based on a comparison result between the project plan information in which a plan of a project is described, and the project execution information in which execution of the project is described. An information consistency check unit checks the consistency based on the reliability of the correspondence relation estimated by the correspondence estimation processing unit. A user interface displays information for specifying a task associated with a process along with process information, displays information regarding a task associated with an architecture along with architecture information, and displays person-in-charge information of the architecture along with the architecture information.

## Claims

### Claim 1

A project assistance system that calculates a state of a project by using a plurality of pieces of management information, the system comprising:
a processor; and
a storage device,
wherein the storage device stores
project plan information in which a plan of the project is described, and
project execution information in which execution of the project is described, and
the processor
calculates correspondence information between the project plan information and the project execution information along with a reliability of a correspondence relation, and
outputs information of the project along with the reliability of the correspondence relation, based on the correspondence information.

### Claim 2 (depends on 1)

The project assistance system according to claim 1, wherein
the plurality of pieces of management information include process information and task information,
the project plan information is the process information including information on a work planned date and an actual work date for each process,
the project execution information is the task information including information on the work planned date and an actual work date for each task, and
the processor associates the process and the task with each other based on the work planned date and the actual work date to create the correspondence information.

### Claim 3 (depends on 2)

The project assistance system according to claim 2, wherein the reliability is calculated based on a coincidence degree of the dates and whether or not the actual date is written.

### Claim 4 (depends on 1)

The project assistance system according to claim 1, wherein
the project plan information is architecture information including an architecture and directory information for storing the architecture,
the project execution information is source change information including information on a directory in which a source is changed and person-in-charge information of a charged person who changes the source, and
the processor associates the architecture and the source change with each other based on the directory information of the architecture information and the directory information of the source change information, so as to create the correspondence information.

### Claim 5 (depends on 4)

The project assistance system according to claim 4, wherein
the architecture information includes a description of the architecture,
the source change information includes a comment of the charged person who changes the source, and
the processor creates the correspondence information further by using the description of the architecture and the comment of the charged person.

### Claim 6 (depends on 1)

The project assistance system according to claim 1, wherein
the project plan information stores
architecture information including information on an architecture and person-in-charge information, and
task information including information on a task, a work record, and person-in-charge information, and
the processor
calculates a relation between the architecture and the task based on the architecture information and the task information, and
creates the correspondence information based on the person-in-charge information of the architecture information and the person-in-charge information of the task information.

### Claim 7 (depends on 6)

The project assistance system according to claim 6, wherein
the architecture information includes a description of the architecture,
the task information includes a comment of a charged person who performs the task, and
the processor creates the correspondence information further by using the description of the architecture and the comment of the charged person.

### Claim 8 (depends on 1)

The project assistance system according to claim 1, wherein
the project plan information stores
architecture information in which information on an architecture is described, and
task information including information on a task and a work record, and
the processor
calculates a relation between the architecture and the task based on the architecture information and the task information, and
creates a progress status of a work related to the architecture, based on the architecture information and the work record of the task information.

### Claim 9 (depends on 5)

The project assistance system according to claim 5, wherein
the processor
checks consistency between the project plan information and the correspondence information, and
outputs the person-in-charge information and a check result of the consistency along with the architecture information.

### Claim 10 (depends on 2)

The project assistance system according to claim 2, wherein the processor outputs information for specifying a task associated with the process, along with the process information.

### Claim 11 (depends on 8)

The project assistance system according to claim 8, wherein the processor causes information regarding a task associated with the architecture to be displayed, along with the architecture information.

### Claim 12

A project assistance device that compares project plan information in which a plan of a project is described with project execution information in which execution of the project is described, and calculates correspondence information between the project plan information and the project execution information based on a result of the comparison.

### Claim 13 (depends on 12)

The project assistance device according to claim 12, wherein
the correspondence information includes
a correspondence relation between a process included in the project plan information and a task included in the project execution information,
a correspondence relation between an architecture included in the project plan information and a charged person who changes an architecture included in the project execution information, and
a correspondence relation between the architecture included in the project plan information and the task included in the project execution information.

### Claim 14

A project assistance method of calculating a state of a project by using a plurality of pieces of management information, wherein
a processor and a storage device are provided,
the storage device stores
project plan information in which a plan of the project is described, and
project execution information in which a work of the project is described, and
the processor
calculates correspondence information between the project plan information and the project execution information along with a reliability of a correspondence relation, and
outputs information of the project along with the reliability of the correspondence relation, based on the correspondence information.