# US 2021/0263477 A1 · Method and system for estimating the drift of a clock for dating seismic data samples

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0263477 A1
- Document ID: US20210263477A1
- Status: Published application
- Kind: A1
- Application number: 17/255,373
- Filed: 2019-06-19
- Published: 2021-08-26
- Earliest claimed: 2018-06-29
- Assignees: Sercel
- Applicants: Sercel
- Inventors: Christophe L'HER
- Web page: https://patentgrep.com/patent/US20210263477A1

## CPC

- G04G 3/02: Circuits for deriving low frequency timing pulses from pulses of higher frequency (pulse frequency dividers in general H03K23/00 - H03K29/00)
- G01V 1/38: specially adapted for water-covered areas (G01V1/28 takes precedence)
- G01V 2200/12: Clock synchronization-related issues
- G04G: ELECTRONIC TIME-PIECES
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

The method for estimating the drift over time of a physical operating parameter of a clock for dating seismic data samples associated with a seismic data collection node involves measuring (10) at least one quantity associated with the clock, at predetermined instants or during predetermined time periods, and applying (12), to this quantity, a predetermined non-linear law of variation of this quantity that depends on the values collected during the measurement step (10), so as to obtain an estimation of the drift over time of the physical operating parameter.

## Claims

### Claim at position 1

1-15. (canceled)

### Claim 16

A method for estimating a drift over time of a physical operating parameter of a clock for dating samples of seismic data, associated with a seismic data collection node, wherein:
at least one variable associated with said clock is measured in a measurement step at predetermined instants in time or for predetermined periods of time; and
a predetermined non-linear law of variation of said variable, which depends on values of said at least one variable collected in said measurement step, is applied to said variable so as to obtain an estimate of said drift over time of said physical operating parameter,
and wherein, in said measurement step:
before deploying said node for a seismic data collection mission, an initial instantaneous frequency of said clock is measured and an internal time information signal of said node is synchronized with respect to a reference time information signal;
at a predetermined instant in time during said data collection mission, a final instantaneous frequency of said clock and a phase offset between said internal time information signal of said node and said reference time information signal are measured;
and wherein, in said step of applying said predetermined non-linear law of variation of said variable, an instantaneous frequency error of said clock is estimated based on said initial instantaneous frequency, said instantaneous frequency at said predetermined instant in time and said phase offset,
and wherein, according to said predetermined non-linear law of variation of said variable, said instantaneous frequency varies according to a polynomial equation of order greater than or equal to 2, such that a phase of said clock varies according to a polynomial equation of order greater than or equal to 3.

### Claim 17 (depends on 16)

The method as claimed in claim 16, wherein, in a preliminary step, an output frequency of said clock is adjusted so as to reduce said instantaneous frequency error of said clock.

### Claim 18 (depends on 17)

The method as claimed in claim 17, wherein said preliminary step is performed during a phase of manufacturing said clock.

### Claim 19 (depends on 17)

The method as claimed in claim 17, wherein said preliminary step is performed during a phase of maintaining said clock.

### Claim 20 (depends on 16)

The method as claimed in claim 16, wherein said reference time information signal is provided by a GPS location system.

### Claim 21 (depends on 16)

The method as claimed in claim 16, wherein:
before deploying said node for a seismic data collection mission, an evolution of said variable is furthermore measured as a function of a temperature of said clock;
during said mission, said temperature of said clock is measured; and
said predetermined non-linear law of variation of said variable takes into account said temperature.

### Claim 22 (depends on 16)

The method as claimed in claim 16, wherein said predetermined instant in time during said mission corresponds to an end of said mission.

### Claim 23 (depends on 16)

The method as claimed in claim 16, wherein, according to said predetermined non-linear law of variation of said variable, said instantaneous frequency varies according to a 2nd-order polynomial equation, such that said phase of said clock varies according to a 3rd-order polynomial equation.

### Claim 24

A method for estimating a drift over time of a physical operating parameter of a clock for dating samples of seismic data, associated with a seismic data collection node, wherein:
at least one variable associated with said clock is measured in a measurement step at predetermined instants in time or for predetermined periods of time; and
a predetermined non-linear law of variation of said variable, which depends on values of said at least one variable collected in said measurement step, is applied to said variable so as to obtain an estimate of said drift over time of said physical operating parameter,
and wherein, in said measurement step, a phase of said clock is measured for a first predetermined period of time before deploying said node for a seismic data collection mission and for a second predetermined period of time at an end of said mission and, in said step of applying said law, an interpolation method is used so as to obtain an estimate of an accumulated phase error of said clock, and wherein, according to said predetermined non-linear law of variation of said variable, a phase of said clock varies according to a polynomial equation of order greater than or equal to 3.

### Claim 25 (depends on 24)

The method as claimed in claim 24, wherein, in said measurement step, said accumulated phase error of said clock is measured for a period of time corresponding to a simulated seismic data collection mission.

### Claim 26 (depends on 24)

The method as claimed in claim 24, wherein said phase of said clock varies according to a 3rd-order polynomial equation.

### Claim 27 (depends on 25)

The method as claimed in claim 25, wherein:
before deploying said node for a seismic data collection mission, an evolution of said variable is furthermore measured as a function of a temperature of said clock;
during said mission, said temperature of said clock is measured.

### Claim 28 (depends on 16)

The method as claimed in claim 16, wherein said node is designed for use on a seabed.

### Claim 29 (depends on 24)

The method as claimed in claim 24, wherein said node is designed for use on a seabed.

### Claim 30 (depends on 16)

A system for estimating a drift over time of a physical operating parameter of a clock for dating samples of seismic data, associated with a seismic data collection node, wherein it comprises a module designed to implement steps of a method as claimed in claim 16.
