# US 2021/0262689 A1 · Cost savings from fault prediction and diagnosis

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0262689 A1
- Document ID: US20210262689A1
- Status: Published application
- Kind: A1
- Application number: 17/318,877
- Filed: 2021-05-12
- Published: 2021-08-26
- Earliest claimed: 2018-06-15
- Assignees: Johnson Controls Tyco IP Holdings LLP
- Applicants: Johnson Controls Technology Company
- Inventors: Priti SHINDE; Kathiresan RAJAGOPAL; Abu Bakr KHAN; Young M. Lee
- Web page: https://patentgrep.com/patent/US20210262689A1

## CPC

- F24F 11/38: Failure diagnosis
- F24F 11/63: Electronic processing
- F24F 11/64: using pre-stored data
- G05B 15/02: electric
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G05B 23/0283: {Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL] (preventive maintenance, i.e. planning maintenance according to the available resources without monitoring the system G06Q10/06)}
- G06N 5/01: Dynamic search techniques; Heuristics; Dynamic trees; Branch-and-bound
- G06N 20/00: Machine learning
- G06N 20/10: using kernel methods, e.g. support vector machines [SVM]
- G06Q 50/06: Energy or water supply
- F24F 2140/50: Load
- G05B 2219/2614: HVAC, heating, ventillation, climate control
- G06N 3/082: modifying the architecture, e.g. adding, deleting or silencing nodes or connections
- G06N 7/01: Probabilistic graphical models, e.g. probabilistic networks
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A heating, ventilation, and air conditioning (HVAC) fault prediction system for a building including a processing circuit including a processor and memory, the memory having instructions stored thereon that, when executed by the processor, cause the processing circuit to receive HVAC data relating to a plurality of HVAC components, the HVAC data indicating performance of the plurality of HVAC components, generate, based on the received HVAC data, a univariate prediction model and a multivariate prediction model, generate, using the received HVAC data, one or more predicted operational parameters for the plurality of HVAC components corresponding to a future time period, and execute at least one of the univariate prediction model or the multivariate prediction model on the one or more predicted operational parameters to predict a HVAC fault associated with at least one of the plurality of HVAC components to occur during the future time period.

## Claims

### Claim 1

A heating, ventilation, and air conditioning (HVAC) fault prediction system for a building, comprising a processing circuit including a processor and memory, the memory having instructions stored thereon that, when executed by the processor, cause the processing circuit to:
receive HVAC data relating to a plurality of HVAC components, the HVAC data indicating performance of the plurality of HVAC components;
generate, based on the received HVAC data, a univariate prediction model and a multivariate prediction model;
generate, using the received HVAC data, one or more predicted operational parameters for the plurality of HVAC components corresponding to a future time period; and
execute at least one of the univariate prediction model or the multivariate prediction model on the one or more predicted operational parameters to predict a HVAC fault associated with at least one of the plurality of HVAC components to occur during the future time period.

### Claim 2 (depends on 1)

The HVAC fault prediction system of claim 1, wherein the instructions further cause the processing circuit to calculate an amount of energy consumption associated with the predicted HVAC fault based at least in part on the one or more predicted operational parameters.

### Claim 3 (depends on 2)

The HVAC fault prediction system of claim 2, wherein the instructions further cause the processing circuit to calculate a cost savings associated with the predicted HVAC fault based on the amount of energy consumption calculated.

### Claim 4 (depends on 3)

The HVAC fault prediction system of claim 3, wherein the instructions further cause the processing circuit to display the predicted HVAC fault to a user based on the calculated cost savings associated with the predicted HVAC fault, where predicted HVAC faults with high cost savings are emphasized over predicted HVAC faults with low cost savings.

### Claim 5 (depends on 1)

The HVAC fault prediction system of claim 1, wherein the instructions further cause the processing circuit to perform an action comprising at least one of (i) generate a suggestion for a user regarding how to prevent the predicted HVAC fault, the suggestion including a cause of the predicted HVAC fault or (ii) automatically generate a work order ticket including an indication of a piece of equipment associated with the predicted HVAC fault.

### Claim 6 (depends on 5)

The HVAC fault prediction system of claim 5, wherein the instructions further cause the processing circuit to compare a cost associated with the action to a cost associated with the predicted HVAC fault to determine whether to generate the suggestion or automatically generate the work order ticket.

### Claim 7 (depends on 1)

The HVAC fault prediction system of claim 1, wherein the instructions further cause the processing circuit to populate a fault diagnosis matrix using the univariate prediction model and the multivariate prediction model and map one or more entries of the fault diagnosis matrix to a fault diagnosis to determine a cause of the predicted HVAC fault.

### Claim 8 (depends on 1)

The HVAC fault prediction system of claim 1, wherein the instructions further cause the processing circuit to compare a predicted setpoint of the one or more predicted operational parameters to a predicted operational parameter associated with the predicted setpoint of the one or more predicted operational parameters to classify the predicted HVAC fault as at least one of a high zone temperature fault or a low zone temperature fault.

### Claim 9

One or more non-transitory computer-readable storage mediums having instructions stored thereon that, when executed by a processor, cause the processor to:
receive data relating to a plurality of heating, ventilation, and air conditioning (HVAC) components, the data indicating performance of the plurality of HVAC components;
generate, based on the received data, a univariate prediction model and a multivariate prediction model;
generate, using the received data, one or more predicted operational parameters for the plurality of HVAC components corresponding to a future time period; and
execute at least one of the univariate prediction model or the multivariate prediction model on the one or more predicted operational parameters to predict a HVAC fault associated with at least one of the plurality of HVAC components to occur during the future time period.

### Claim 10 (depends on 9)

The one or more non-transitory computer-readable storage mediums of claim 9, wherein the instructions further cause the processor to calculate an amount of energy consumption associated with the predicted HVAC fault based at least in part on the one or more predicted operational parameters.

### Claim 11 (depends on 10)

The one or more non-transitory computer-readable storage mediums of claim 10, wherein the instructions further cause the processor to calculate a cost savings associated with the predicted HVAC fault based on the amount of energy consumption calculated.

### Claim 12 (depends on 11)

The one or more non-transitory computer-readable storage mediums of claim 11, wherein the instructions further cause the processor to display the predicted HVAC fault to a user based on the calculated cost savings associated with the predicted HVAC fault, where predicted HVAC faults with high cost savings are emphasized over predicted HVAC faults with low cost savings.

### Claim 13 (depends on 9)

The one or more non-transitory computer-readable storage mediums of claim 9, wherein the instructions further cause the processor to perform an action comprising at least one of (i) generate a suggestion for a user regarding how to prevent the predicted HVAC fault, the suggestion including a cause of the predicted HVAC fault or (ii) automatically generate a work order ticket including an indication of a piece of equipment associated with the predicted HVAC fault.

### Claim 14 (depends on 13)

The one or more non-transitory computer-readable storage mediums of claim 13, wherein the instructions further cause the processor to compare a cost associated with the action to a cost associated with the predicted HVAC fault to determine whether to generate the suggestion or automatically generate the work order ticket.

### Claim 15 (depends on 9)

The one or more non-transitory computer-readable storage mediums of claim 9, wherein the instructions further cause the processor to populate a fault diagnosis matrix using the univariate prediction model and the multivariate prediction model and map one or more entries of the fault diagnosis matrix to a fault diagnosis to determine a cause of the predicted HVAC fault.

### Claim 16 (depends on 9)

The one or more non-transitory computer-readable storage mediums of claim 9, wherein the instructions further cause the processor to compare a predicted setpoint of the one or more predicted operational parameters to a predicted operational parameter associated with the predicted setpoint of the one or more predicted operational parameters to classify the predicted HVAC fault as at least one of a high zone temperature fault or a low zone temperature fault.

### Claim 17

A building management system (BMS), comprising a processing circuit including a processor and memory, the memory having instructions stored thereon that, when executed by the processor, cause the processing circuit to:
receive data relating to a plurality of heating, ventilation, and air conditioning (HVAC) components, the data indicating performance of the plurality of HVAC components;
generate, based on the received data, a univariate prediction model and a multivariate prediction model;
generate, using the received data, one or more predicted operational parameters for the plurality of HVAC components corresponding to a future time period;
execute at least one of the univariate prediction model or the multivariate prediction model on the one or more predicted operational parameters to predict a HVAC fault associated with at least one of the plurality of HVAC components to occur during the future time period;
calculate an amount of energy consumption associated with the predicted HVAC fault based at least in part on the one or more predicted operational parameters; and
perform an action comprising at least one of (i) generate a suggestion for a user regarding how to prevent the predicted HVAC fault, the suggestion including a cause of the predicted HVAC fault or (ii) automatically generate a work order ticket including an indication of a piece of equipment associated with the predicted HVAC fault.

### Claim 18 (depends on 17)

The building management system (BMS) of claim 17, wherein the instructions further cause the processing circuit to calculate a cost savings associated with the predicted HVAC fault based on the amount of energy consumption calculated.

### Claim 19 (depends on 18)

The building management system (BMS) of claim 18, wherein the instructions further cause the processing circuit to display the predicted HVAC fault to a user based on the calculated cost savings associated with the predicted HVAC fault, where predicted HVAC faults with high cost savings are emphasized over predicted HVAC faults with low cost savings.

### Claim 20 (depends on 17)

The building management system (BMS) of claim 17, wherein the data includes chiller data indicating performance of a plurality of chillers, wherein the univariate prediction model and the multivariate prediction model include a single chiller prediction model and a cluster chiller prediction model, and wherein predicting the HVAC fault includes predicting a chiller fault with at least one of the single chiller prediction model or the cluster chiller prediction model.
