# US 2021/0261386 A1 · Split crane for installation of wind turbines and other tall structures

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0261386 A1
- Document ID: US20210261386A1
- Status: Published application
- Kind: A1
- Application number: 17/251,612
- Filed: 2019-06-14
- Published: 2021-08-26
- Earliest claimed: 2018-06-14
- Assignees: Heerema Marine Contractors Nederland B.V.
- Applicants: Heerema Marine Contractors Nederland SE
- Inventors: Jan VAN EGMOND
- Web page: https://patentgrep.com/patent/US20210261386A1

## CPC

- B66C 1/108: {for lifting parts of wind turbines}
- B63B 27/08: of winches
- B63B 27/10: of cranes
- B63B 35/003: {for transporting very large loads, e.g. offshore structure modules (construction methods for artificial islands mounted on piles E02B17/00; for transporting marine vessels B63B35/40; docks B63C1/00)}
- B66C 23/185: {for use erecting wind turbines (B66C23/207 takes precedence)}
- B66C 23/52: Floating cranes (floating dredgers E02F)
- B66C 23/64: Jibs
- B63B 35/00: Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B66C 2700/0321: Travelling cranes
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/727: Offshore wind turbines
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The present invention relates to a method for installing a wind turbine or other tall structure at a target location at sea, the method comprising: providing an installation vessel comprising at least one crane, wherein the crane comprises a lower boom part, a right boom part, and a left boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, lifting a tall structure part, in particular the nacelle assembly, with the crane, wherein in top view the tall structure part is supported at least partially between the right and left boom part by one or more hoist lines extending from the right and left boom part to the tall structure part.

## Claims

### Claim 1

Method for installing a wind turbine or other tall structure at a target location at sea, the method comprising:
providing an installation vessel comprising at least one crane, wherein the crane comprises a lower boom part, a right boom part, and a left boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part,
lifting a tall structure part, in particular the nacelle assembly, with the crane, wherein in top view the tall structure part is supported at least partially between the right and left boom part by one or more hoist lines extending from the right and left boom part to the tall structure part.

### Claim 2

Method according to preceding claim, wherein the tall structure part is a nacelle assembly comprising a nacelle, a hub, and a mast or part thereof extending downward from the nacelle, with or without one or more blades or parts thereof connected to the hub, the blades extending over a vertical distance upwardly or downwardly from the nacelle, wherein when seen in top view the nacelle, the mast or part thereof is held between the right and left boom part.

### Claim 3

Method according to any of the preceding claims, wherein a lifting frame is connected to the tall structure part at a position below the right and left boom part, and wherein one or more hoist lines extend from the right and left boom part to the lifting frame, and wherein the tall structure part extends upwards from the lifting frame to a location between the right and left boom part or above the right and left boom part.

### Claim 4

Method according to the preceding claim, wherein the tall structure part is a nacelle assembly comprising the nacelle and the mast or a part of the mast of the wind turbine, the mast or part thereof extending downward from the nacelle, and wherein the lifting frame is connected to the mast or part thereof below the nacelle.

### Claim 5

Method according to any of the two preceding claims, wherein a stabilizing device is provided between the right and/or left boom part and the stabilized part of the tall structure part which is located above the lifting frame, wherein the one or more hoist lines carry the weight of the tall structure part, in particular the nacelle assembly, and wherein the stabilizing device holds the tall structure part upright.

### Claim 6

Method according to the preceding claim, wherein the stabilizing device comprises:
one or more stabilizing lines which extend from the right and left boom part to the stabilized part above the lifting frame, and/or
a clamp which is connected to the right and/or left boom part and which is positioned between the right and left boom part, wherein the clamp holds the stabilized part of the tall structure part above the lifting frame, and/or
one or more cylinders which extend from the right and left boom part to the stabilized part of the tall structure part above the lifting frame, wherein the one or more cylinders are extended or shortened to stabilize the tall structure part.

### Claim 7

Method according to the preceding claim, wherein the clamp comprises a through opening which extends vertically, and wherein a part of the tall structure part extends through the through opening, and wherein in particular the clamp comprises:
a first and second clamp part which are moveable relative to one another and enable the clamp to be opened in order to release the tall structure part after it has been positioned on the target location or
an opening on one side allowing the tall structure part to be released from the clamp.

### Claim 8

Method according to any of the two preceding claims, wherein the nacelle of the nacelle assembly is supported at a horizontal level of the right and left boom part or above the right and left boom part.

### Claim 9

Method according to any of the preceding claims, wherein the tall structure part is a nacelle assembly comprising a nacelle, a hub and blades, and wherein when seen in top view the hub and the blades protrude over a horizontal distance forward of the right and left boom part and stay clear of the right and left boom part.

### Claim 10

Method according to any of the preceding claims, wherein the nacelle assembly is transferred from a support position on board the installation vessel to the foundation, to the mast, or to a lower part of the mast at the target location.

### Claim 11

Method according to any of the preceding claims, wherein the crane comprises at least a right hoisting system for hoisting the portion of the load suspended from the right boom part and a left hoisting system for hoisting the portion of the load suspended from the left boom part and wherein the right and left hoisting system cooperate in the lifting operation.

### Claim 12

Method according to any of the preceding claims, wherein the crane initially comprises a single upper boom part, wherein the single upper boom part is removed and replaced by the right and left boom part prior to the lifting operation.

### Claim 13

Method according to any of the preceding claims, wherein the left and right boom part are connected to the base of the crane via a hinge, either directly or indirectly via another crane part, in particular the lower boom part, which is connected to the base of the crane by said hinge, allowing the left and right boom part to pivot upward and downward.

### Claim 14

Method according to the preceding claim, wherein the left and right boom part extend upwards and/or outwards from the point where they are mounted to the crane.

### Claim 15

Method according to any of the preceding claims, wherein the crane comprises a junction at an upper end of the lower boom part wherein the right and left boom part extend from the junction.

### Claim 16

Method according to the preceding claim, wherein the junction is located at 50 to 95 percent of a total height of the crane, preferably at 70 to 95 percent of the total height of the crane.

### Claim 17 (depends on 15, 16)

Method according to claim 15 or 16, wherein the left and right boom part are pivotable up and down together with the lower boom part.

### Claim 18 (depends on 15, 16, 17)

Method according to any of claims 15-17, wherein the crane comprises a tower which supports cables which extend to the boom, in particular to the lower boom part.

### Claim 19 (depends on 15, 16)

Method according to claim 15 or 16, wherein the right boom part and the left boom part are pivotably mounted to the junction via a right and left hinge, and wherein the angle enclosed between the right and left boom part is adjusted by pivoting the right and/or left boom part.

### Claim 20 (depends on 15, 16, 17, 18, 19)

Method according to any of claims 15-19, wherein cables extend from a part of the crane to the left and right boom part.

### Claim 21

Method to any of the preceding claims where the two hoists are used in combination with more hoists, more specifically three hoists, two hoists in front and one aft of the nacelle assembly or four hoists, two in front and two aft of the nacelle assembly, or more hoists if required.

### Claim 22

Method according to any of the preceding claims, wherein in side view the tall structure part extends partly above and partly below a left boom part free end and a right boom part free end of the respective left and right boom parts, and at least partly between boom part free ends and the junction.

### Claim 23

Method according to any of the preceding claims, wherein the left boom part and the right boom part are identical and mirrored with respect to each other.

### Claim 24

Installation vessel configured for lifting a tall structure part, in particular a nacelle assembly, of a tall structure, in particular a wind turbine, which is to be installed at a target location at sea, the installation vessel comprising at least one crane, wherein an upper part of the crane comprises two boom parts, a right boom part and a left boom part, wherein the crane further comprises a lower boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, and wherein the space is configured for accommodating the tall structure part, in particular a nacelle assembly of a wind turbine.

### Claim 25

Installation vessel according to the preceding claim, comprising a lifting frame configured to be connected to a lower portion of the tall structure part.

### Claim 26 (depends on 24, 25)

Installation vessel according to any of the preceding claims 24-25, comprising a stabilizing device provided between the right and left boom part and a stabilized part of the tall structure part which is located above the lifting frame, wherein the stabilizing device is configured to hold the tall structure part upright.

### Claim 27

Installation vessel according to the preceding claim, wherein the lifting frame has a right side and a left side, wherein a hoist line extend from the right boom part to the right side and wherein a hoist line extends from the left boom part to the left side of the frame.

### Claim 28 (depends on 24, 25, 26, 27)

Installation vessel according to any of the preceding claims 24-27, wherein the stabilizing device comprises:
one or more stabilizing lines which extend from the right and left boom part to the stabilized part of the tall structure part, and/or
a clamp which is configured to be connected to the right and/or left boom part and which is positioned between the right and left boom part, and/or
one or more cylinders are connected to the right and/or left boom part and are configured to extend to the stabilized part of the nacelle assembly above the lifting frame.

### Claim 29

Installation vessel according to the preceding claim, wherein the clamp comprises a through opening which extends vertically, and wherein a part of the tall structure part extends through the through opening, and wherein in particular the clamp comprises:
a first and second clamp part which are moveable relative to one another and enable the clamp to be opened in order to release the tall structure part after it has been positioned on the target location or
an opening on one side allowing the tall structure part to be released from the clamp,
and wherein the clamp is in particular configured to allow sliding of the tall structure part in a vertical direction relative to the clamp.

### Claim 30 (depends on 24, 25, 26, 27, 28, 29)

Installation vessel according to any of the preceding claims 24-29, wherein the left and right boom part are connected to the base of the crane via a hinge, either directly or indirectly via another crane part, in particular the lower boom part, which is connected to the base of the crane by said hinge, allowing the left and right boom part to pivot upward and downward.

### Claim 31

Installation vessel according to the preceding claim, wherein the left and right boom part extend upwards and outwards from the point where they are mounted to the crane.

### Claim 32 (depends on 24, 25, 26, 27, 28, 29, 30, 31)

Installation vessel according to any of the preceding claims 24-31, wherein the crane comprises a junction at an upper end of the lower boom part wherein the right and left boom part extend from the junction.

### Claim 33 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32)

Installation vessel according to any of the preceding claims 24-32, wherein the right and left boom part extend over a vertical distance and over a horizontal distance from the junction.

### Claim 34 (depends on 32, 33)

Installation vessel according to claim 32 or 33, wherein the junction is located at 50 to 95 percent of a total height of the crane, preferably at 70 to 95 percent of the total height of the crane.

### Claim 35 (depends on 32, 33, 34)

Installation vessel according to any of claims 32-34, wherein the left and right boom part are pivotable up and down together with the lower boom part.

### Claim 36 (depends on 32, 33, 34, 35)

Installation vessel according to any of claims 32-35, wherein the crane comprises a tower which supports cables which extend to the boom, in particular to the lower boom part, and wherein said cables are connected to a winch for pivoting the combination of lower boom part and left and right boom part about a horizontal pivot axis (79).

### Claim 37

Installation vessel according to the preceding claim, wherein cables extend from a part of the crane to the left and right boom part.

### Claim 38 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37)

Installation vessel according to any of the preceding claims 24-37, wherein the crane comprises at least a right hoisting system for hoisting the portion of the load suspended from the right boom part and a left hoisting system for hoisting the portion of the load suspended from the left boom part.

### Claim 39

Installation vessel according to the preceding claim, wherein the right and left hoisting system are independently operable.

### Claim 40

Installation vessel according to the preceding claim, wherein the right and left hoisting system comprise a load balancing device for balancing the load between the right and left hoisting system.

### Claim 41 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40)

Installation vessel according to any of the preceding claims 24-40, wherein the crane comprises a turret base, and wherein the turret base is mounted for rotation about a vertical axis on the deck or hull of the installation vessel.

### Claim 42 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41)

Installation vessel according to any of the preceding claims 24-41, wherein the right and left boom part define a V-shape.

### Claim 43 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42)

Installation vessel according to any of the preceding claims 24-42, wherein the right and left boom part comprise respective right and left free ends which are not interconnected by any beam.

### Claim 44

Installation vessel according to the preceding claim, wherein an open space is provided between the right and left free ends of the respective right and left boom parts.

### Claim 45 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44)

Installation vessel according to any of the preceding claims 24-44, wherein a distance between right and left free ends of respective right and left boom parts is between 1.5 and 12 meters, preferably between 4 and 11 meters, more preferably between 5 and 10 meters.

### Claim 46 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45)

Installation vessel according to any of the preceding claims 24-45, wherein the lower boom part is pivotably connected to the turret base via a lower boom hinge and is pivotable about a horizontal lower boom pivot axis about the turret base.

### Claim 47 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46)

Installation vessel according to any of the preceding claims 24-46, wherein the junction is pivotably connected to the lower boom part via a junction hinge and pivotable relative to the lower boom part about a horizontal pivot axis.

### Claim 48 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47)

Installation vessel according to any of the preceding claims 24-47, wherein the right boom part and the left boom part are pivotably mounted to the junction via a right and left hinge, and wherein the angle enclosed between the right and left boom part is adjustable by pivoting the right and/or left boom part.

### Claim 49 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48)

Installation vessel according to any of the preceding claims 24-48, wherein the right boom part and the left boom part are removably mounted on the crane and replaceable with a single upper boom part, allowing the crane to be converted from a regular crane to the crane with right and left boom part or vice versa.

### Claim 50 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49)

Installation vessel according to any of the preceding claims 24-49, wherein:
e) the crane is positioned on a bow of the vessel, in particular at a port side or starboard side thereof, and wherein a pickup area where the nacelle assembly is picked up is located aft or to the side of the crane, or
f) wherein the crane is positioned on a stern of the installation vessel, in particular at a port side or starboard side thereof, and wherein a pickup area where the nacelle assembly is picked up is located forward or to the side of the crane, or
g) the crane is positioned somewhere along the length to the vessel and wherein a pickup area is located on any side of the crane, or
h) Any of the preceding options a)-c) wherein the pick-up area is located on an extension platform of the vessel which cantilevers outboard of the hull of the vessel.

### Claim 51 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50)

Installation vessel according to any of the preceding claims 24-50, wherein the left boom part and the right boom part diverge with respect to each other.

### Claim 52

Installation vessel according to the preceding claim, wherein an angle of divergence (α) between the left boom part and the right boom part during lifting is between 10 and 100 degrees, preferably between 45 and 100 degrees.

### Claim 53 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52)

Installation vessel according to any of the preceding claims 24-52, wherein the left boom part and the right boom part are identical and mirrored with respect to each other.

### Claim 54 (depends on 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53)

Combination of the installation vessel according to any of the preceding claims 24-53 and a tall structure part, in particular a nacelle assembly.

### Claim 55

Combination according to the preceding claim, wherein when seen in side view the nacelle of the nacelle assembly is supported at the horizontal level of the right and left boom part or above the right and left boom part.

### Claim 56

Crane configured for lifting a tall structure part, in particular a nacelle assembly, of a tall structure, in particular a wind turbine, which is to be installed at a target location at sea, wherein an upper part of the crane comprises two boom parts, a right boom part and a left boom part, wherein the crane further comprises a lower boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, and wherein the space is configured for accommodating the tall structure part, in particular a nacelle assembly of a wind turbine.

### Claim 57

Crane according to the preceding claim, comprising a lifting frame configured to be connected to a lower portion of the tall structure part.

### Claim 58 (depends on 56, 57)

Crane according to any of the preceding claims 56-57, comprising a stabilizing device provided between the right and left boom part and a stabilized part of the tall structure part which is located above the lifting frame, wherein the stabilizing device is configured to hold the tall structure part upright.

### Claim 59 (depends on 56, 57, 58)

Crane according to any of the preceding claims 56-58, wherein the lifting frame has a right side and a left side, wherein a hoist line extend from the right boom part to the right side and wherein a hoist line extends from the left boom part to the left side of the frame.

### Claim 60 (depends on 56, 57, 58, 59)

Crane according to any of the preceding claims 56-59, wherein the stabilizing device comprises:
one or more stabilizing lines which extend from the right and left boom part to the stabilized part of the tall structure part, and/or
a clamp which is configured to be connected to the right and/or left boom part and which is positioned between the right and left boom part, and/or
one or more cylinders are connected to the right and/or left boom part and are configured to extend to the stabilized part of the nacelle assembly above the lifting frame.

### Claim 61 (depends on 56, 57, 58, 59, 60)

Crane according to any of the preceding claims 56-60, wherein the clamp comprises a through opening which extends vertically, and wherein a part of the tall structure part extends through the through opening, and wherein in particular the clamp comprises:
a first and second clamp part which are moveable relative to one another and enable the clamp to be opened in order to release the tall structure part after it has been positioned on the target location or
an opening on one side allowing the tall structure part to be released from the clamp,
an wherein the clamp is in particular configured to allow sliding of the tall structure part in a vertical direction relative to the clamp.

### Claim 62 (depends on 56, 57, 58, 59, 60, 61)

Crane according to any of the preceding claims 56-61, wherein the left and right boom part are connected to the base of the crane via a hinge, either directly or indirectly via another crane part, in particular the lower boom part, which is connected to the base of the crane by said hinge, allowing the left and right boom part to pivot upward and downward.

### Claim 63

Crane according to the preceding claim, wherein the left and right boom part extend upwards and/or outwards from the point where they are mounted to the crane.

### Claim 64 (depends on 56, 57, 58, 59, 60, 61)

Crane according to any of the preceding claims 56-61, wherein the crane comprises a junction at an upper end of the lower boom part wherein the right and left boom part extend from the junction.

### Claim 65 (depends on 46, 47, 48, 49, 50, 51, 52)

Crane according to any of the preceding claims 46-52, wherein the right and left boom part extend over a vertical distance and over a horizontal distance from the junction.

### Claim 66 (depends on 52, 53)

Crane according to claim 52 or 53, wherein the junction is located at 50 to 95 percent of a total height of the crane, preferably at 70 to 95 percent of the total height of the crane.

### Claim 67 (depends on 64, 65, 66)

Crane according to any of claims 64-66, wherein the left and right boom part are pivotable up and down together with the lower boom part.

### Claim 68 (depends on 64, 65, 66, 67)

Crane vessel according to any of claims 64-67, wherein the crane comprises a tower which supports cables which extend to the boom, in particular to the lower boom part, and wherein said cables are connected to a winch for pivoting the combination of lower boom part and left and right boom part about a horizontal pivot axis (79).

### Claim 69

Crane vessel according to the preceding claim, wherein cables extend from a part of the crane to the left and right boom part.

### Claim 70 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69)

Crane according to any of the preceding claims 56-69, wherein the left boom part and the right boom part diverge with respect to each other.

### Claim 71

Crane according to the preceding claim, wherein an angle of divergence between the left boom part and the right boom part during lifting is between 10 and 100 degrees, preferably between 45 and 100 degrees.

### Claim 72 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71)

Crane according to any of the preceding claims 56-71, wherein the crane comprises at least a right hoisting system for hoisting the portion of the load suspended from the right boom part and a left hoisting system for hoisting the portion of the load suspended from the left boom part.

### Claim 73 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72)

Crane according to any of the preceding claims 56-72, wherein the right and left hoisting system are independently operable.

### Claim 74 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73)

Crane according to any of the preceding claims 56-73, wherein the right and left hoisting system comprise a load balancing device for balancing the load between the right and left hoisting system.

### Claim 75 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74)

Crane according to any of the preceding claims 56-74, wherein the crane comprises a turret base, and wherein the turret base is mounted for rotation about a vertical axis on the deck or hull of the installation vessel.

### Claim 76 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75)

Crane according to any of the preceding claims 56-75, wherein the right and left boom part define a V-shape.

### Claim 77 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76)

Crane according to any of the preceding claims 56-76, wherein the right and left boom part comprise respective right and left free ends which are not interconnected by any beam.

### Claim 78

Crane according to the preceding claim, wherein an open space is provided between the right and left free ends of the respective right and left boom parts.

### Claim 79 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78)

Crane according to any of the preceding claims 56-78, wherein a distance between right and left free ends of respective right and left boom parts is between 1.5 and 12 meters, preferably between 4 and 11 meters, more preferably between 5 and 10 meters.

### Claim 80 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79)

Crane according to any of the preceding claims 56-79, wherein the lower boom part is pivotably connected to the turret base via a lower boom hinge and is pivotable about a horizontal lower boom pivot axis about the turret base.

### Claim 81 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80)

Crane according to any of the preceding claims 56-80, wherein the junction is pivotably connected to the lower boom part via a junction hinge and pivotable relative to the lower boom part about a horizontal pivot axis.

### Claim 82 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81)

Crane according to any of the preceding claims 56-81, wherein the right boom part and the left boom part are pivotably mounted to the junction via a right and left hinge, and wherein the angle enclosed between the right and left boom part is adjustable by pivoting the right and/or left boom part.

### Claim 83 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82)

Crane according to any of the preceding claims 56-82, wherein the right boom part and the left boom part are removably mounted on the crane and replaceable with a single upper boom part, allowing the crane to be converted from a regular crane to the crane with right and left boom part or vice versa.

### Claim 84 (depends on 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83)

Crane according to any of the preceding claims 56-83, wherein the left boom part and the right boom part are identical and mirrored with respect to each other.
