# US 2021/0255655 A1 · Boundary separation scheme for faults in power systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0255655 A1
- Document ID: US20210255655A1
- Status: Published application
- Kind: A1
- Application number: 16/790,244
- Filed: 2020-02-13
- Published: 2021-08-19
- Earliest claimed: 2020-02-13
- Assignees: Schweitzer Engineering Laboratories, Inc.
- Applicants: Schweitzer Engineering Laboratories, Inc.
- Inventors: Krishnanjan Gubba Ravikumar; Bharath Nayak; Christopher P. Knox; Ceeman B. Vellaithurai
- Web page: https://patentgrep.com/patent/US20210255655A1

## CPC

- G05F 1/66: Regulating electric power
- G01R 31/08: Locating faults in cables, transmission lines, or networks
- G01R 31/086: {in power transmission or distribution networks, i.e. with interconnected conductors}
- H02H 3/265: {responsive to phase angle between voltages or between currents}
- H02H 3/286: {involving comparison of similar homopolar quantities}
- H02H 7/263: {involving transmissions of measured values (comparison of currents or voltages using pilot wires H02H3/30)}
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- G01R 19/2513: {Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging}
- H02J 13/1311: {using the power network as support for the transmission}
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/18: using switches, relays or circuit breakers, e.g. intelligent electronic devices [IED]
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- Y04S 10/52: Outage or fault management, e.g. fault detection or location
- Y04S 40/121: using the power network as support for the transmission
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Systems and methods to disconnect a faulted region of a power grid are described. For example, a control system may obtain a set of regions of a power grid. The control system may obtain a current magnitude and a voltage magnitude of the power grid. The control system may detect a fault in the power grid based at least in part on the current magnitude. The control system may, from the set of regions, determine a faulted region that the fault is located within based on a voltage magnitude of one or more buses in the power grid, a net change in power with respect to time of one or more regions in the set of regions, or both. The control system may send one or more signals to electrically disconnect the faulted region from the power grid.

## Claims

### Claim 1

A non-transitory, tangible, computer-readable medium, comprising instructions configured to be executed by a computer processor to cause the computer processor to:
obtain a set of regions of a power grid;
obtain a current magnitude from one or more generators of the power grid;
obtain a voltage magnitude of one or more buses of the power grid;
detect a fault in the power grid based at least in part on the current magnitude;
from the set of regions, determine a faulted region within which the fault is located based on the voltage magnitude, a net change in power with respect to time of one or more regions in the set of regions, or both; and
send one or more signals to electrically disconnect the faulted region from the power grid.

### Claim 2 (depends on 1)

The non-transitory, tangible, computer-readable medium of claim 1, wherein the instructions are configured to be executed by the computer processor to cause the computer processor to:
determine a current output in per unit based on an associated generator megavolt-ampere (MVA) rating of one or more generators of the power grid;
based on the current output, determine a positive sequence current magnitude as the current magnitude; and
compare the positive sequence current magnitude to a positive sequence current threshold to determine that the fault is present in the power grid.

### Claim 3 (depends on 2)

The non-transitory, tangible, computer-readable medium of claim 2, wherein the instructions are configured to be executed by the computer processor to cause the computer processor to receive a user setting of the positive sequence current threshold.

### Claim 4 (depends on 1)

The non-transitory, tangible, computer-readable medium of claim 1, wherein the instructions are configured to be executed by the computer processor to cause the computer processor to:
determine a current output in per unit based on an associated generator megavolt-ampere (MVA) rating of one or more generators of the power grid;
based on the current output, determine a negative sequence current magnitude as the current magnitude; and
compare the negative sequence current magnitude to a negative sequence current threshold to determine that the fault is present in the power grid.

### Claim 5 (depends on 4)

The non-transitory, tangible, computer-readable medium of claim 4, wherein the instructions are configured to be executed by the computer processor to cause the computer processor to receive a user setting of the negative sequence current threshold.

### Claim 6 (depends on 1)

The non-transitory, tangible, computer-readable medium of claim 1, wherein the instructions are configured to be executed by the computer processor to cause the computer processor to:
determine a current output in per unit based on an associated generator megavolt-ampere (MVA) rating of one or more generators of the power grid;
based on the current output, determine a zero sequence current magnitude as the current magnitude; and
compare the zero sequence current magnitude to a zero sequence current threshold to determine that the fault is present in the power grid.

### Claim 7 (depends on 6)

The non-transitory, tangible, computer-readable medium of claim 6, wherein the instructions are configured to be executed by the computer processor to cause the computer processor to receive a user setting of the zero sequence current threshold.

### Claim 8 (depends on 1)

The non-transitory, tangible, computer-readable medium of claim 1, wherein the instructions are configured to be executed by the computer processor to cause the computer processor to, upon electrically disconnecting the faulted region from the power grid, implement a remedial action scheme to balance remaining power generation of the power grid with remaining load of the power grid.

### Claim 9 (depends on 1)

The non-transitory, tangible, computer-readable medium of claim 1, wherein each region in the set of regions comprises a set of equipment in a geographical area, wherein each region in the set of regions comprises one or more intelligent electronic devices (IEDs) at a boundary of the region, and wherein the instructions are configured to be executed by the computer processor to cause the computer processor to send the one or more signals to the one or more IEDs at the boundary of the faulted region to electrically disconnect the set of the equipment in the faulted region from the power grid.

### Claim 10

A method, comprising:
obtaining a set of regions of a power grid;
obtaining a current measurement from one or more generators of the power grid;
obtaining a voltage measurement of one or more buses of the power grid;
detecting a fault in the power grid based at least in part on the current measurement;
from the set of regions, determining a faulted region within which the fault is located based on the voltage magnitude, a net change in power with respect to time of one or more regions in the set of regions, or both; and
sending one or more signals to electrically disconnect the faulted region from the power grid.

### Claim 11 (depends on 10)

The method of claim 10, comprising waiting for a predetermined amount of time to allow the primary protection to isolate the fault, thereby limiting the amount of equipment disconnected from the power grid when primary protection operates.

### Claim 12 (depends on 11)

The method of claim 11, comprising, sending one or more signals to electrically disconnect the faulted region from the power grid when no blocking signal is received after a period of time and allowing the faulted region to remain on the power grid when a blocking signal is received.

### Claim 13 (depends on 10)

The method of claim 10, comprising, prior to disconnecting the faulted region, confirming that the fault remains on the power line by waiting a predetermined number of cycles to allow for transient faults to clear.

### Claim 14 (depends on 10)

The method of claim 10, comprising receiving, via user input, the set of regions.

### Claim 15 (depends on 14)

The method of claim 14, wherein the one or more current measurements comprise a combination of generator output currents from a plurality of generators.

### Claim 16

A control system, comprising:
a memory; and
a processor operatively coupled to the memory device, wherein the processor is configured to execute instructions stored on the memory to cause operations comprising:
obtaining a set of regions of a power grid;
obtaining one or more current measurements of one or more generators of the power grid;
obtaining one or more voltage measurements of one or more buses of the power grid;
detecting a fault in the power grid based at least in part on the one or more current measurements;
from the set of regions, determining a faulted region within which the fault is located based on the one or more voltage measurements, a net change in power with respect to time of one or more regions in the set of regions, or both; and
sending one or more signals to electrically disconnect the faulted region from the power grid.

### Claim 17 (depends on 16)

The control system of claim 16, wherein the processor is configured to execute instructions stored on the memory to cause operations comprising:
determining power delivered to or from each region in the set of regions;
calculating a derivative of the power delivered to or from each region as the net change in power with respect to time for the respective region;
determining that a region of the set of regions is importing more power than previously being imported from a decrease in the net change in power being delivered; and
selecting the region that is consuming more power as the faulted region.

### Claim 18 (depends on 17)

The control system of claim 17, wherein the processor is configured to execute instructions stored on the memory to cause operations comprising:
determine a first positive sequence voltage at a first end of a power line;
determining a second positive sequence voltage at a second end of the power line;
using a higher value of the first positive sequence voltage and the second positive sequence voltage in calculating the net change in power delivered between a first region at the first end of the power line and a second region at a second end of the power line.

### Claim 19 (depends on 16)

The control system of claim 16, wherein the processor is configured to execute instructions stored on the memory to cause operations comprising:
determining that the faulted region comprises a plurality of regions from the set of regions; and
disconnecting the plurality of regions.

### Claim 20 (depends on 16)

The control system of claim 16, wherein the processor is configured to execute instructions stored on the memory to cause operations comprising sending one or more signals to electrically disconnect the faulted region from the power grid when no blocking signal is received after a period of time and allowing the faulted region to remain on the power grid when a blocking signal is received.