# US 2021/0240492 A1 · Method and apparatus for improving data management in an information handling system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0240492 A1
- Document ID: US20210240492A1
- Status: Published application
- Kind: A1
- Application number: 16/780,558
- Filed: 2020-02-03
- Published: 2021-08-05
- Earliest claimed: 2020-02-03
- Assignees: Dell Products L.P.
- Applicants: Dell Products, LP
- Inventors: Christopher Griffin; Maheshwar Dattatri
- Web page: https://patentgrep.com/patent/US20210240492A1

## CPC

- G06F 8/61: Installation
- G06F 9/4416: {Network booting; Remote initial program loading [RIPL]}
- G06F 8/60: Software deployment
- G06F 9/4406: {Loading of operating system}
- G06F 9/44505: {Configuring for program initiating, e.g. using registry, configuration files}
- G06F 9/542: {Event management; Broadcasting; Multicasting; Notifications}
- G06F 11/3006: {where the computing system is distributed, e.g. networked systems, clusters, multiprocessor systems (multiprogramming arrangements G06F9/46; allocation of resources G06F9/50)}
- G06F 11/302: {where the computing system component is a software system}
- G06F 11/3075: {the data filtering being achieved in order to maintain consistency among the monitored data, e.g. ensuring that the monitored data belong to the same timeframe, to the same system or component}
- G06F 11/321: {Display for diagnostics, e.g. diagnostic result display, self-test user interface}
- G06F 11/3409: {for performance assessment}
- G06F 11/3419: {by assessing time}
- G06F 11/3495: {for systems}
- G06F 11/1433: {during software upgrading}
- G06F 11/3476: {Data logging (G06F11/14, G06F11/2205 take precedence)}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

An information handling system includes a delay controller having an analytics engine configured to analyze telemetry data associated with an installation of a program, to calculate a confidence index based upon the analyzed telemetry data, and to generate a recommendation corresponding to the calculated confidence index. A download controller receives an end-user recommendation selection, and delays the installation of the program based upon a delay time in the received end-user recommendation selection.

## Claims

### Claim 1

An information handling system having improved data management, comprising:
a processor; and
a delay controller coupled to the processor, the delay controller including:
an analytics engine configured to analyze telemetry data associated with an installation of a program, to calculate a confidence index based upon the analyzed telemetry data, and to generate a recommendation corresponding to the calculated confidence index; and
a download controller configured to receive an end-user recommendation selection, and to delay the installation of the program based upon a delay time in the received end-user recommendation selection.

### Claim 2 (depends on 1)

The information handling system of claim 1, wherein the installation of the program includes reinstallation of an operating system.

### Claim 3 (depends on 2)

The information handling system of claim 2, wherein the telemetry data include measured real-time events that that are monitored from a remote site.

### Claim 4 (depends on 1)

The information handling system of claim 1, wherein the telemetry data include measurements based upon local time zone, geography, and system configuration of the information handling system.

### Claim 5 (depends on 1)

The information handling system of claim 1, wherein different recommendations are generated for different confidence indices, wherein each one of the recommendations includes a particular amount of the delay time for the installation of the program.

### Claim 6 (depends on 1)

The information handling system of claim 1, wherein the recommendation includes automated installation of the program at a particular period of time.

### Claim 7 (depends on 1)

The information handling system of claim 1, wherein the analytics engine receives measured real-time events through a baseband management controller.

### Claim 8 (depends on 1)

The information handling system of claim 1, wherein the confidence index includes a metric indicating duration and speed of the installation of the program.

### Claim 9 (depends on 1)

The information handling system of claim 1 further comprising a telemetry data storage that stores the telemetry data, historical data, and real-time measured events that are received through a baseband management controller.

### Claim 10 (depends on 1)

The information handling system of claim 1, wherein the delaying the installation of the program includes changing a configuration of the information handling system.

### Claim 11

An information handling system, comprising:
a processor; and
a delay controller coupled to the processor, the delay controller including:
an analytics engine configured to analyze telemetry data associated with data downloading, to calculate a confidence index based upon the analyzed telemetry data, and to generate a recommendation based upon the calculated confidence index; and
a download controller configured to receive an end-user recommendation selection and to control the data downloading based upon the received end-user recommendation selection.

### Claim 12 (depends on 11)

The information handling system of claim 11, wherein the data downloading is used to install a program or to perform a process in the information handling system.

### Claim 13 (depends on 11)

The information handling system of claim 11, wherein the telemetry data are measured based upon local time zone and geography of the information handling system, system configuration of the information handling system, or a combination thereof.

### Claim 14 (depends on 11)

The information handling system of claim 11, wherein the generated recommendation includes a delay time for the data downloading.

### Claim 15 (depends on 14)

The information handling system of claim 14, wherein the generated recommendation includes system reconfiguration of the information handling system.

### Claim 16 (depends on 11)

The information handling system of claim 11, wherein the analytics engine receives the telemetry data through a baseband management controller.

### Claim 17 (depends on 16)

The information handling system of claim 16, wherein the confidence index includes a metric indicating duration time for completion of the data downloading.

### Claim 18

A method, comprising:
initiating, by a hardware processor, an installation of a program;
monitoring, by an analytics engine, telemetry data associated with the installation of the program;
calculating a confidence index based upon the monitored telemetry data;
generating recommendations based upon the calculated confidence index;
receiving an end-user entered recommendation selection; and
controlling the installation of the program based upon the received end-user entered recommendation selection.

### Claim 19 (depends on 18)

The method of claim 18, wherein the confidence index includes a metric indicating a duration time for a completion of the installation of the program.

### Claim 20 (depends on 18)

The information handling system of claim 18, wherein different recommendations are generated for different calculated confidence indices.
