# US 2021/0233185 A1 · Energy management system and energy management method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0233185 A1
- Document ID: US20210233185A1
- Status: Published application
- Kind: A1
- Application number: 17/123,302
- Filed: 2020-12-16
- Published: 2021-07-29
- Earliest claimed: 2020-01-29
- Assignees: Hitachi, Ltd.
- Applicants: Hitachi, Ltd.
- Inventors: Naoki Yoshimoto
- Web page: https://patentgrep.com/patent/US20210233185A1

## CPC

- G06Q 50/06: Energy or water supply
- G01R 11/56: Special tariff meters
- G05B 13/026: {using a predictor}
- G06Q 10/063: Operations research, analysis or management
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 2101/20: Dispersed power generation using renewable energy sources
- H02J 2105/12: supplying households or buildings
- H02J 2105/57: {according to a pre-established time schedule}
- Y02A 30/00: Adapting or protecting infrastructure or their operation
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Cooperation in supply and demand balance of renewable energy in a region is implemented by operation of infrastructures of an infrastructure service such as water supply. In an energy management system including: a processor; and a storage device, the processor predicts an electric power supply amount utilizing renewable energy in a predetermined region, predicts an electric power demand amount in the region, predicts a demand amount of an infrastructure service different from an electric power service in the region, predicts an electric power demand amount corresponding to the infrastructure service on the basis of the predicted demand amount of the infrastructure service in the region, and determines use time of electric power corresponding to the infrastructure service such that the electric power demand amount in the region approaches the electric power supply amount.

## Claims

### Claim 1

An energy management system comprising:
a processor; and
a storage device,
the processor
predicting an electric power supply amount utilizing renewable energy in a predetermined region,
predicting an electric power demand amount in the region,
predicting a demand amount of an infrastructure service different from an electric power service in the region,
predicting an electric power demand amount corresponding to the infrastructure service on a basis of the predicted demand amount of the infrastructure service in the region, and
determining use time of electric power corresponding to the infrastructure service such that the electric power demand amount in the region approaches the electric power supply amount.

### Claim 2 (depends on 1)

The energy management system according to claim 1, wherein
the infrastructure service is a water supply service,
the demand amount of the infrastructure service in the region is a water supply demand amount in the region,
the electric power demand amount corresponding to the infrastructure service is an electric power demand amount for operation of a distribution pump for the water supply service, and
the processor
changes time at which electric power demand for water distribution utilizing potential energy from among electric power demand for operation of the water distribution pump in a direction earlier than time at which demand of the infrastructure service in the region occurs to determine use time of electric power corresponding to the infrastructure service such that the electric power demand amount in the region approaches the electric power supply amount, and
outputs information indicating that the water distribution pump is operated at the determined use time to a water supply company by which the water supply service is provided.

### Claim 3 (depends on 1)

The energy management system according to claim 1, wherein
the infrastructure service is a water supply service,
the demand amount of the infrastructure service in the region is a hot water supply demand amount in the region,
the electric power demand amount corresponding to the infrastructure service is an electric power demand amount for hot water boiling, and
the processor
changes time of occurrence of electric power demand for the hot water boiling in a direction earlier than time at which hot water supply demand in the region occurs to determine use time of electric power corresponding to the infrastructure service such that the electric power demand amount in the region approaches the electric power supply amount, and
outputs information indicating that hot water boiling is performed at the determined use time to a consumer of the electric power that performs hot water boiling.

### Claim 4 (depends on 3)

The energy management system according to claim 3, wherein
the storage device retains meteorological performance information of the region in a past, meteorological forecast information of the region in future and operation schedule information of facilities in the region, and
the processor predicts the hot water supply demand amount in the region on a basis of the meteorological performance information, the meteorological forecast information, and the operation schedule information of the facilities.

### Claim 5 (depends on 1)

The energy management system according to claim 1, wherein
the infrastructure service is a water supply service,
the demand amount of the infrastructure service in the region is a water supply demand amount in the region, and
the processor predicts the water supply demand amount in the region on a basis of information from water supply smart meters of consumers of the water supply service.

### Claim 6 (depends on 1)

The energy management system according to claim 1, wherein
the storage device retains performance information of electric power demand in the region in a past, meteorological performance information in the region in the past, meteorological forecast information in the region in future, and operation schedule information of facilities in the region, and
the processor predicts the electric power demand amount in the region on a basis of the performance information of the electric power demand, the meteorological performance information, the meteorological forecast information, and the operation schedule information of the facilities.

### Claim 7 (depends on 1)

The energy management system according to claim 1, wherein
the storage device retains performance information of the electric power demand in the region in a past, meteorological performance information in the region in the past, meteorological forecast information in the region in future and terrain information relating to the region,
the electric power supply amount utilizing renewable energy is at least either the electric power supply amount by solar power generation or the electric power supply amount by wind-power generation, and
the processor
predicts the electric power supply amount by solar power generation on a basis of the meteorological performance information in the region in the past and the meteorological forecast information in the region in the past, and
predicts the electric power supply amount by wind-power generation on a basis of the meteorological performance information in the region in the past, the meteorological forecast information in the region in the future and the terrain information relating to the region.

### Claim 8

An energy management method executed by an energy management system that includes a processor and a storage device, the energy management method comprising:
a first procedure, by the processor, of predicting an electric power supply amount utilizing renewable energy in a predetermined region;
a second procedure, by the processer, of predicting an electric power demand amount in the region;
a third procedure, by the processor, of predicting a demand amount of an infrastructure service different from an electric power service in the region;
a fourth procedure, by the processor, of predicting an electric power demand amount corresponding to the infrastructure service on a basis of the predicted demand amount of the infrastructure service in the region; and
a fifth procedure, by the processor, of determining use time of electric power corresponding to the infrastructure service such that the electric power demand amount in the region approaches the electric power supply amount.

### Claim 9 (depends on 8)

The energy management method according to claim 8, wherein
the infrastructure service is a water supply service,
the demand mount of the infrastructure service in the region is a water supply demand amount in the region,
the electric power demand amount corresponding to the infrastructure service is an electric power demand amount for operation of a distribution pump for the water supply service, and
in the fifth procedure, the processor
changes time at which electric power demand for water distribution utilizing potential energy from among electric power demand for operation of the water distribution pump in a direction earlier than time at which demand of the infrastructure service in the region occurs to determine the use time of electric power corresponding to the infrastructure service such that the electric power demand amount in the region approaches the electric power supply amount, and
outputs information indicating that the water distribution pump is operated at the determined use time to a water supply company by which the water supply service is provided.

### Claim 10 (depends on 8)

The energy management method according to claim 8, wherein
the infrastructure service is a water supply service,
the demand amount of the infrastructure service in the region is a hot water supply demand amount in the region,
the electric power demand amount corresponding to the infrastructure service is an electric power demand amount for hot water boiling, and
in the fifth procedure, the processor
changes the time at which electric power demand for the hot water boiling occurs in a direction earlier than the time at which hot water supply demand in the region occurs to determine the use time of electric power corresponding to the infrastructure service such that the electric power demand amount in the region approaches the electric power supply amount, and
outputs information indicating that hot water boiling is performed at the determined use time to a consumer of the electric power that performs hot water boiling.

### Claim 11 (depends on 10)

The energy management method according to claim 10, wherein
the storage device retains meteorological performance information of the region in a past, meteorological forecast information of the region in future and operation schedule information of facilities in the region, and
in the third procedure, the processor predicts the hot water supply demand amount in the region on a basis of the meteorological performance information, the meteorological forecast information, and the operation schedule information of the facilities.

### Claim 12 (depends on 8)

The energy management method according to claim 8, wherein
the infrastructure service is a water supply service,
the demand amount of the infrastructure service in the region is a water supply demand amount in the region, and
in the third procedure, the processor predicts a water supply demand amount in the region on a basis of information from water supply smart meters of consumers of the water supply service.

### Claim 13 (depends on 8)

The energy management method according to claim 8, wherein
the storage device retains performance information of the electric power demand in the region in a past, meteorological performance information in the region in the past, meteorological forecast information in the region in future, and operation schedule information of facilities in the region, and
in the second procedure, the processor predicts the electric power demand amount in the region on a basis of the performance information of the electric power demand, the meteorological performance information, the meteorological forecast information, and the operation schedule information of the facilities.

### Claim 14 (depends on 8)

The energy management method according to claim 8, wherein
the storage device retains performance information of the electric power demand in the region in a past, meteorological performance information in the region in the past, meteorological forecast information in the region in future, and terrain information relating to the region,
the electric power supply amount utilizing renewable energy is at least either the electric power supply amount by solar power generation or the electric power supply amount by wind-power generation, and
in the first procedure, the processor
predicts the electric power supply amount by solar power generation on a basis of the meteorological performance information in the region in the past and the meteorological forecast information in the region in the past, and
predicts the electric power supply amount by wind-power generation on a basis of the meteorological performance information in the region in the past, the meteorological forecast information in the region in the future, and the terrain information relating to the region.
