# US 2021/0232444 A1 · Switch event ordering

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0232444 A1
- Document ID: US20210232444A1
- Status: Published application
- Kind: A1
- Application number: 16/751,077
- Filed: 2020-01-23
- Published: 2021-07-29
- Earliest claimed: 2020-01-23
- Assignees: Hewlett Packard Enterprise Development LP
- Applicants: Hewlett Packard Enterprise Development LP
- Inventors: Rajeev Grover; Duane Mentze
- Web page: https://patentgrep.com/patent/US20210232444A1

## CPC

- H04L 67/10: in which an application is distributed across nodes in the network (software deployment G06F8/60; multiprogramming arrangements G06F9/46)
- G06F 16/2365: {Ensuring data consistency and integrity}
- G06F 16/24568: {Data stream processing; Continuous queries}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Examples disclosed herein relate to a method comprising detecting a plurality of changes in a database, wherein the database is used to configure a switch operating traffic on a network. The method may include determining that a subset of the plurality of changes are to be deferred before being used to configure the switch, wherein each change in the subset has a potential dependency with at least one other change in the subset. The method may also include iterating through each change in the subset. The iteration may include confirming that a target change has a dependency with another change in the subset, resolving the dependency and transmitting the target change to an object manager for configuration of the switch.

## Claims

### Claim 1

A method comprising:
detecting a plurality of changes in a database, wherein the database is used to configure a switch operating traffic on a network;
determining that a subset of the plurality of changes are to be deferred before being used to configure the switch, wherein each change in the subset has a potential dependency with at least one other change in the subset;
iterating through each change in the subset, wherein the iteration includes:
confirming that a target change has a dependency with another change in the subset;
resolving the dependency and:
transmitting the target change to an object manager for configuration of the switch.

### Claim 2 (depends on 1)

The method of claim 1 comprising:
converting each change in the plurality of changes into a data structure that can be used to configure the switch.

### Claim 3 (depends on 1)

The method of claim 1 comprising:
transferring, each change in the subset into a deferred queue.

### Claim 4 (depends on 1)

The method of claim 1 comprising:
transmitting each change in the plurality of changes that is not to be deferred to the object manager for configuration of the switch.

### Claim 5 (depends on 1)

The method of claim 1 comprising:
determining that a subset of the plurality of changes are to be deferred without knowing each potential dependency in the plurality of changes.

### Claim 6 (depends on 1)

The method of claim 1 comprising:
iterating through each change in the subset with knowledge of each potential dependency in the plurality of changes.

### Claim 8 (depends on 1)

The method of claim 1 comprising:
identifying if there are any deadlocks in the subset; and
resolving the deadlocks after each other change in the subset has been resolved.

### Claim 9 (depends on 1)

The method of claim 1 wherein each change in the subset of the plurality of changes is to be deferred because of an action associated with that change.

### Claim 10 (depends on 1)

The method of claim 1 wherein the plurality of changes occur during a temporal period, the method comprising.
creating a snapshot of the database at the end of the temporal period;
determining the potential dependency based on the snapshot of the database;
and confirming the dependency based on the snapshot of the database.

### Claim 11

A system comprising:
a change detector to detect a plurality of changes in a database, wherein the database is used to configure a switch operating traffic on a network;
a sequencer to determine that a subset of the plurality of changes are to be deferred before being used to configure the switch, wherein each change in the subset has a potential dependency with at least one other change in the subset;
a sequence iterator to iterate through each change in the subset, including:
confirming that a target change has a dependency with another change in the subset;
resolving the dependency and:
transmitting the target change to an object manager for configuration of the switch.

### Claim 12 (depends on 10)

The system of claim 10 comprising:
an event generator to convert each change in the plurality of changes into a data structure that can be used to configure the switch.

### Claim 13 (depends on 10)

The system of claim 10 comprising:
the sequencer to transfer each change in the subset into a deferred queue.

### Claim 14 (depends on 10)

The system of claim 10 comprising:
the sequencer to transmit each change in the plurality of changes that is not to be deferred to the object manager for configuration of the switch.

### Claim 15 (depends on 10)

The system of claim 10 comprising:
the sequencer to determine that a subset of the plurality of changes are to be deferred without knowing each potential dependency in the plurality of changes.

### Claim 16

A non-transitory machine-readable storage medium encoded with instructions, the instructions executable by a processor of a system to cause the system to:
detect a plurality of changes in a database, wherein the database is used to configure a switch operating traffic on a network;
determine that a subset of the plurality of changes are to be deferred before being used to configure the switch, wherein each change in the subset has a potential dependency with at least one other change in the subset;
iterate through each change in the subset, wherein the iteration includes:
confirming that a target change has a dependency with another change in the subset;
resolving the dependency and:
transmitting the target change to an object manager for configuration of the switch.

### Claim 17 (depends on 16)

The non-transitory machine-readable storage medium of claim 16, the instructions executable by a processor of a system to cause the system to:
iterate through each change in the subset with knowledge of each potential dependency in the plurality of changes.

### Claim 18 (depends on 16)

The non-transitory machine-readable storage medium of claim 16, the instructions executable by a processor of a system to cause the system to:
identify if there are any deadlocks in the subset; and
resolve the deadlocks after each other change in the subset has been resolved.

### Claim 19 (depends on 16)

The non-transitory machine-readable storage medium of claim 16, wherein each change in the subset of the plurality of changes is to be deferred because of an action associated with that change.

### Claim 20 (depends on 16)

The non-transitory machine-readable storage medium of claim 16, the instructions executable by a processor of a system to cause the system to:
create a snapshot of the database at the end of the temporal period;
determine the potential dependency based on the snapshot of the database; and
confirm the dependency based on the snapshot of the database.
