# US 2021/0231694 A1 · Fluid remaining amount management device, analysis system, fluid remaining amount management method and non-transitory readable medium storing fluid remaining amount management program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0231694 A1
- Document ID: US20210231694A1
- Status: Published application
- Kind: A1
- Application number: 17/264,154
- Filed: 2018-08-07
- Published: 2021-07-29
- Earliest claimed: 2018-08-07
- Assignees: Shimadzu Corporation
- Applicants: Shimadzu Corporation
- Inventors: Shingo MASUDA
- Web page: https://patentgrep.com/patent/US20210231694A1

## CPC

- G01N 35/00712: {Automatic status testing, e.g. at start-up or periodic}
- G01N 35/00663: {of consumables}
- G01N 35/00871: {Communications between instruments or with remote terminals}
- G01N 35/0092: {Scheduling}
- G01N 30/86: Signal analysis
- G01N 2030/8804: {automated systems}
- G01N 2035/009: {alarms, e.g. audible}
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)

## Abstract

An analysis system includes one or a plurality of analysis devices and a fluid remaining amount management device. The one or plurality of analysis devices perform an analysis using fluid supplied from a gas cylinder that is used as a fluid source. The fluid remaining amount management device includes a scheduled usage amount estimator and a remaining amount shortage time determiner. The scheduled usage amount estimator estimates transition of a scheduled usage amount of fluid to be used later than a current point in time in the one or plurality of analysis devices. A remaining amount shortage time determiner determines a remaining amount shortage time when a shortage of a remaining amount of fluid in each gas cylinder occurs based on the estimated transition of the scheduled usage amount.

## Claims

### Claim 1

A fluid remaining amount management device that manages a remaining amount of fluid in a fluid source that supplies fluid to one or a plurality of analysis devices, comprising:
an estimator that estimates transition of a scheduled usage amount of fluid to be used later than a current point in time in the one or plurality of analysis devices; and
a determiner that determines a remaining amount shortage time when a shortage of the remaining amount of fluid in the fluid source occurs, based on the transition of the scheduled usage amount that is estimated by the estimator.

### Claim 2 (depends on 1)

The fluid remaining amount management device according to claim 1, further comprising a reporter that reports a warning indicating that the fluid source is to be replaced, at a time earlier than the remaining amount shortage time determined by the determiner.

### Claim 3 (depends on 1)

The fluid remaining amount management device according to claim 1, wherein
the estimator estimates the transition of the scheduled usage amount based on a change in usage amount of fluid in the past in regard to the one or plurality of analysis devices.

### Claim 4 (depends on 1)

The fluid remaining amount management device according to claim 1, wherein
the estimator estimates the transition of the scheduled usage amount based on an analysis schedule in each of the one or plurality of analysis devices.

### Claim 5 (depends on 2)

The fluid remaining amount management device according to claim 2, wherein
the reporter reports the warning at the time earlier than a specific time in a case where the remaining amount shortage time determined by the determiner falls on a specific time.

### Claim 6 (depends on 1)

The fluid remaining amount management device according to claim 1, further comprising:
a first setter that sets priority levels for a plurality of analysis schedules in the one or plurality of analysis devices; and
a first changer that changes an execution time of at least part of the analysis schedules based on the priority levels set by the first setter such that the remaining amount shortage time does not fall on a specific time.

### Claim 7 (depends on 1)

The fluid remaining amount management device according to claim 1, further comprising:
a second setter that sets a priority level for each of the plurality of analysis devices; and
a second changer that changes an operation time of at least part of the analysis devices based on the priority levels set by the second setter such that the remaining amount shortage time does not fall on a specific time.

### Claim 8 (depends on 1)

An analysis system comprising:
one or a plurality of analysis devices that perform an analysis using fluid supplied from a fluid source; and
the fluid remaining amount management device according to claim 1 that manages a remaining amount of fluid in the fluid source.

### Claim 9

A fluid remaining amount management method for managing a remaining amount of fluid in a fluid source that supplies fluid to one or a plurality of analysis devices, including:
estimating transition of a scheduled usage amount of fluid to be used later than a current point in time in the one or plurality of analysis devices; and
determining a remaining amount shortage time when a shortage of the remaining amount of fluid in the fluid source occurs, based on the estimated transition of the scheduled usage amount.

### Claim 10 (depends on 9)

The fluid remaining amount management method according to claim 9, further including reporting a warning indicating that the fluid source is to be replaced, at a time earlier than the remaining amount shortage time determined.

### Claim 11 (depends on 10)

The fluid remaining amount management method according to claim 10, wherein
the reporting includes reporting the warning at the time earlier than a specific time in a case where the determined remaining amount shortage time falls on the specific time.

### Claim 12

A non-transitory readable medium storing a fluid remaining amount management program that manages a remaining amount of fluid in a fluid source that supplies fluid to one or a plurality of analysis devices,
the fluid remaining amount management program causing a computer to execute:
estimating transition of a scheduled usage amount of fluid to be used later than a current point in time in the one or plurality of analysis devices; and
determining a remaining amount shortage time when a shortage of the remaining amount of fluid in the fluid source occurs, based on the estimated transition of the scheduled usage amount.