# US 2021/0231533 A1 · Load estimation apparatus, load estimation method, and program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0231533 A1
- Document ID: US20210231533A1
- Status: Published application
- Kind: A1
- Application number: 17/268,696
- Filed: 2019-09-05
- Published: 2021-07-29
- Earliest claimed: 2018-09-14
- Assignees: Mitsubishi Heavy Industries Engineering, Ltd.
- Applicants: Mitsubishi Heavy Industries Engineering, Ltd.
- Inventors: Akihisa KAWAUCHI; Hiroyuki KONO; Koji UCHIDA; Teruo YAMASHITA
- Web page: https://patentgrep.com/patent/US20210231533A1

## CPC

- G01M 17/10: Suspensions, axles or wheels
- B61F 5/24: Means for damping or minimising the canting, skewing, pitching, or plunging movements of the underframes
- B61F 99/00: Subject matter not provided for in other groups of this subclass
- B61K 9/02: Profile gauges, e.g. loading gauges
- B61K 13/00: Other auxiliaries or accessories for railways
- B61L 15/0081: {On-board diagnosis or maintenance}
- B61L 25/021: {Measuring and recording of train speed}
- G01G 19/08: for incorporation in vehicles
- G01H 17/00: Measuring mechanical vibrations or ultrasonic, sonic or infrasonic waves, not provided for in the other groups of this subclass
- G01L 1/005: {by electrical means and not provided for in G01L1/06 - G01L1/22}
- G01P 15/00: Measuring acceleration; Measuring deceleration; Measuring shock, i.e. sudden change of acceleration
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- B61F: RAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES (for vehicles in general B60; axles or wheels B60B; vehicle tyres B60C)
- B61K: AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)
- G01G: WEIGHING (sorting by weighing B07C5/16)
- G01H: MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G01L: MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE (weighing G01G)
- G01P: MEASURING LINEAR OR ANGULAR SPEED, ACCELERATION, DECELERATION, OR SHOCK; INDICATING PRESENCE, ABSENCE, OR DIRECTION, OF MOVEMENT (measuring or recording blood flow A61B5/02, A61B8/06; monitoring speed or deceleration of electrically-propelled vehicles B60L3/00; vehicle lighting systems adapted to indicate speed B60Q1/54; determining position or course in navigation, measuring ground distance in geodesy or surveying G01C; combined measuring devices for measuring two or more variables of movement G01C23/00; measuring velocity of sound G01H; measuring velocity of light G01J7/00; measuring direction or velocity of solid objects by reception or emission of radiowaves or other waves and based on propagation effects, e.g. Doppler effect, propagation time, direction of propagation, G01S; measuring speed of nuclear radiation G01T; measuring acceleration of gravity G01V; {measuring or recording the speed of trains B61L23/00; speed indicators incorporated in motor vehicles B60K35/00; measuring frequency or phase G01R; traffic control G08G})

## Abstract

A load estimation apparatus includes: an acceleration sensor attached to at least one of a bogie body supporting wheels or a vehicle body attached to the bogie body and configured to measure a first acceleration; and a control unit configured to estimate a load which is applied to the bogie body on the basis of load information which is acquired in advance and in which an acceleration and a load are correlated and the first acceleration.

## Claims

### Claim 1

A load estimation apparatus comprising:
an acceleration sensor attached to at least one of a bogie body supporting wheels or a vehicle body attached to the bogie body and configured to measure a first acceleration; and
a control unit configured to estimate a load which is applied to the bogie body on the basis of load information which is acquired in advance and in which an acceleration and a load are correlated and the first acceleration,
wherein a frequency of an acceleration which is determined on the basis of a change of the acceleration with time is further correlated in the load information, and
wherein the control unit is configured to further estimate the load which is applied to the bogie body on the basis of the load information and the first acceleration

### Claim 2

(canceled)

### Claim 3 (depends on 1)

The load estimation apparatus according to claim 1, wherein information corresponding to a position of the acceleration sensor is further correlated in the load information, and
wherein the control unit is configured to further estimate the load which is applied to the bogie body on the basis of the load information and the first acceleration.

### Claim 4 (depends on 1)

The load estimation apparatus according to claim 1, wherein a frequency of an acceleration which is determined on the basis of a change of the acceleration with time is further correlated in the load information,
wherein information corresponding to a position of the acceleration sensor is further correlated in the load information,
wherein, when the position of the acceleration sensor indicates a position on the bogie body, the frequency is less than a natural frequency fch×√2 where fch is a value which is determined on the basis of a spring constant of an air suspension connecting the vehicle body and the bogie body and a vehicle body mass, and
wherein, when the position of the acceleration sensor indicates a position on the vehicle body, the frequency is equal to or greater than fch×√2.

### Claim 5 (depends on 1)

The load estimation apparatus according to claim 1, wherein a plurality of vehicle body masses are further correlated in the load information, and
wherein the control unit is configured to further acquire the vehicle body mass and is configured to further estimate the load which is applied to the bogie body on the basis of the load information, the first acceleration, and the vehicle body mass.

### Claim 6 (depends on 1)

The load estimation apparatus according to claim 1, wherein a plurality of positions at which a plurality of acceleration sensors are attached to at least one of the bogie body and the vehicle body are further correlated in the load information, and
wherein the control unit is configured to estimate the load which is applied to the bogie body on the basis of a plurality of accelerations which are measured by the plurality of acceleration sensors and the load information.

### Claim 7 (depends on 1)

The load estimation apparatus according to claim 1, further comprising a warning device,
wherein the control unit is configured to determine whether a lifespan of the bogie body is over on the basis of a sum of a preset limit load and the load which is applied to the bogie body, and
wherein the control unit is configured to transmit a signal for causing the warning device to generate a warning when it is determined that the lifespan of the bogie body is over.

### Claim 8 (depends on 1)

The load estimation apparatus according to claim 1, wherein the control unit is configured to estimate the load on the basis of at least an acceleration sensor that is able to measure a lateral acceleration with respect to a longitudinal direction of the vehicle body when a load which is applied from a guide rail to the bogie body is estimated, and
wherein the control unit is configured to estimate the load on the basis of at least an acceleration sensor that is able to measure a vertical acceleration with respect to the longitudinal direction of the vehicle body when a load which is applied from a road to the bogie body is estimated.

### Claim 9 (depends on 1)

The load estimation apparatus according to claim 1, further comprising a load detecting device that is further attached to at least one of the bogie body and the vehicle body,
wherein the load detecting device includes a load sensor that is configured to measure a second load which is applied to the bogie body and an acceleration sensor that is configured to measure a second acceleration, and
wherein the control unit adds the second load and the second acceleration to the load information.

### Claim 10 (depends on 1)

The load estimation apparatus according to claim 1, wherein the acceleration sensor is attached to only the vehicle body,
wherein the control unit is configured to correct the first acceleration when a frequency of the first acceleration which is acquired on the basis of a change with time of an acceleration acquired from the first acceleration is equal to or greater than fch×√2 where a frequency fch is a value which is determined on the basis of a spring constant of an air suspension connected between the bogie body and the vehicle body and a mass of the vehicle body, and
wherein the control unit is configured to estimate the load which is applied to the bogie body on the basis of the corrected first acceleration.

### Claim 11

A load estimation method comprising:
a step of measuring a first acceleration using an acceleration sensor attached to at least one of a bogie body supporting wheels or a vehicle body attached to the bogie body; and
a step of estimating a load which is applied to the bogie body on the basis of load information which is acquired in advance and in which an acceleration and a load are correlated and the first acceleration,
wherein a frequency of an acceleration which is determined on the basis of a change of the acceleration with time is further correlated in the load information, and
wherein, in the step of estimating the load, further estimating the load which is applied to the bogie body on the basis of the load information and the first acceleration.

### Claim 12

A program causing a computer of a load estimation apparatus to perform:
a step of measuring a first acceleration using an acceleration sensor attached to at least one of a bogie body supporting wheels or a vehicle body attached to the bogie body; and
a step of estimating a load which is applied to the bogie body on the basis of load information which is acquired in advance and in which an acceleration and a load are correlated and the first acceleration,
wherein a frequency of an acceleration which is determined on the basis of a change of the acceleration with time is further correlated in the load information, and
wherein, in the step of estimating the load, further estimating the load which is applied to the bogie body on the basis of the load information and the first acceleration.
