- Number: US 2021/0200594 A1
- Document ID: US20210200594A1
- Status: Published application
- Kind: A1
- Application number: 17/058,022
- Filed: 2019-05-24
- Published: 2021-07-01
- Earliest claimed: 2018-06-01
- Assignees: Nippon Telegraph and Telephone Corporation
- Applicants: Nippon Telegraph and Telephone Corporation
- Inventors: Hiroaki Kobayashi; Naoki Takada
- Web page: https://patentgrep.com/patent/US20210200594A1

## CPC

- G06F 9/5027: {the resource being a machine, e.g. CPUs, Servers, Terminals}
- G06F 9/5072: {Grid computing}
- G06F 9/5022: {Mechanisms to release resources}
- G06F 9/542: {Event management; Broadcasting; Multicasting; Notifications}
- G06Q 10/02: Reservations, e.g. for tickets, services or events
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06F 2209/5014: Reservation
- G06F 2209/504: Resource capping
- G06F 2209/508: Monitor
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

[Problem] When resource reserved in a resource sharing system become unavailable, the reservation is efficiently transferred. [Solution] In a resource sharing system 10, a plurality of users 20 (user terminals) share a plurality of resources 30. A resource reservation management device 42 includes: a reservation setting unit 402 that accepts a reservation request including a usage condition of the plurality of resources 30 from the user 20 and sets a usage reservation according to the usage condition to a first resource predetermined 30 in the resource sharing system 10; and a reservation changing unit 404 that re-sets the usage reservation to a second resource 30 being different from the first resource 30 in the resource sharing system 10 when a reserved resource 30 becomes unavailable. When a resource capacity of the second resource 30 is insufficient for the usage reservation to be re-set, the reservation changing unit 404 changes the usage condition and re-sets the usage reservation to the second resource 30.

## Claims

### Claim 1

A resource reservation management device in a resource sharing system in which a plurality of resources are shared by a plurality of user terminals, the resource reservation management device comprising:
a reservation setting unit, including one or more processors, configured to accept a reservation request including a usage condition of the plurality of resources from a user terminal and set a usage reservation according to the usage condition to a first resource predetermined in the resource sharing system; and
a reservation changing unit, including one or more processors, configured to re-set the usage reservation to a second resource being different from the first resource in the resource sharing system when the first resource predetermined becomes unavailable,
wherein when a resource capacity of the second resource is insufficient for the usage reservation to be re-set, the reservation changing unit changes the usage condition and then re-sets the usage reservation to the second resource.

### Claim 2 (depends on 1)

The resource reservation management device according to claim 1,
wherein the reservation changing unit makes a notification including a proposed change of the usage condition to the user terminal, changes the usage condition according to the proposed change when obtaining information of an approval of the proposed change from the user terminal, and then re-sets the usage reservation to the second resource.

### Claim 3 (depends on 1)

The resource reservation management device according to claim 1,
wherein the reservation request includes a lower limit usage condition applied when the usage reservation according to the usage condition cannot be set, and the reservation changing unit changes the usage condition based on the lower limit usage condition and then re-sets the usage reservation to the second resource.

### Claim 4 (depends on 3)

The resource reservation management device according to claim 3,
wherein the usage condition includes a plurality of items,
the reservation request includes priorities for the plurality of items, and
the reservation changing unit changes the usage condition such that an item of the plurality of items with a higher priority has a less change from the usage condition included in the reservation request.

### Claim 5 (depends on 3)

The resource reservation management device according to claim 3,
wherein the reservation changing unit uses an algorithm that resolves Bin Packing problem to change the usage condition so as to maximize a number of a plurality of usage reservations which are executable.

### Claim 6 (depends on 1)

The resource reservation management device according to claim 1,
wherein the reservation request includes a lower limit usage condition applied when the usage reservation according to the usage condition cannot be set, and
the reservation changing unit makes a notification including a proposed change of the usage condition to the user terminal, changes the usage condition according to the proposed change when obtaining information of an approval of the proposed change from the user terminal, and then re-sets the usage reservation to the second resource, and changes the usage condition based on the lower limit usage condition when obtaining no information of the approval of the proposed change from the user terminal, and then re-sets the usage reservation to the second resource.

### Claim 7 (depends on 1)

The resource reservation management device according to claim 1,
wherein the reservation setting unit suspends accepting a new instance of the reservation request while the reservation changing unit re-sets the usage reservation.

### Claim 8

A resource reservation management method in a resource sharing system in which a plurality of resources are shared by a plurality of user terminals, the method comprising:
accepting a reservation request including a usage condition of the plurality of resources from a user terminal and setting a usage reservation according to the usage condition to a first resource predetermined; and
re-setting the usage reservation to a second resource being different from the first resource in the resource sharing system when the first resource predetermined becomes unavailable,
wherein in the re-setting step, when a resource capacity of the second resource is insufficient for the usage reservation to be re-set, the usage condition is changed and then the usage reservation to the second resource is re-set.

### Claim 9 (depends on 8)

The resource reservation management method according to claim 8, further comprising:
making a notification including a proposed change of the usage condition to the user terminal, changing the usage condition according to the proposed change when obtaining information of an approval of the proposed change from the user terminal, and then re-setting the usage reservation to the second resource.

### Claim 10 (depends on 8)

The resource reservation management method according to claim 8,
wherein the reservation request includes a lower limit usage condition applied when the usage reservation according to the usage condition cannot be set, and the method further comprising:
changing the usage condition based on the lower limit usage condition and then re-setting the usage reservation to the second resource.

### Claim 11 (depends on 10)

The resource reservation management method according to claim 10,
wherein the usage condition includes a plurality of items,
the reservation request includes priorities for the plurality of items, and the method further comprising:
changing the usage condition such that an item of the plurality of items with a higher priority has a less change from the usage condition included in the reservation request.

### Claim 12 (depends on 10)

The resource reservation management method according to claim 10, further comprising:
using an algorithm that resolves Bin Packing problem to change the usage condition so as to maximize a number of a plurality of usage reservations which are executable.

### Claim 13 (depends on 8)

The resource reservation management method according to claim 8,
wherein the reservation request includes a lower limit usage condition applied when the usage reservation according to the usage condition cannot be set, and the method further comprising:
making a notification including a proposed change of the usage condition to the user terminal, changing the usage condition according to the proposed change when obtaining information of an approval of the proposed change from the user terminal, and then re-setting the usage reservation to the second resource, and changing the usage condition based on the lower limit usage condition when obtaining no information of the approval of the proposed change from the user terminal, and then re-setting the usage reservation to the second resource.

### Claim 14 (depends on 8)

The resource reservation management method according to claim 8, further comprising:
suspending accepting a new instance of the reservation request while the re-setting the usage reservation.