# US 2021/0200125 A1 · Fixing device and method for controlling fixing device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0200125 A1
- Document ID: US20210200125A1
- Status: Published application
- Kind: A1
- Application number: 17/114,632
- Filed: 2020-12-08
- Published: 2021-07-01
- Earliest claimed: 2019-12-27
- Assignees: Brother Kogyo Kabushiki Kaisha
- Applicants: Brother Kogyo Kabushiki Kaisha
- Inventors: Yuya HARADA
- Web page: https://patentgrep.com/patent/US20210200125A1

## CPC

- G03G 15/2039: {with means for controlling the fixing temperature}
- G03G 15/2042: {specially for the axial heat partition}
- G03G: ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY

## Abstract

An fixing device comprises a heating member, a first heater, a second heater, and the heating member, a first temperature detector, a second temperature detector, and a controller configured to control energization to the first heater and the second heater based on an energization pattern for each control period. In a case where a length of the control period is T, a length of a period during which a first continuous energization control is T1, and a length of a period during which a second continuous energization control is T2, when a first condition represented by T1+T2<T is satisfied, the controller starts the second continuous energization control just after an end of the first continuous energization control.

## Claims

### Claim 1

A fixing device, comprising:
a heating member configured to heat a sheet;
a first heater having an output peak in a first area of the heating member and configured to heat the heating member;
a second heater having an output peak in a second area different from the first area of the heating member and configured to heat the heating member;
a first temperature detector configured to detect a temperature of the first area;
a second temperature detector configured to detect a temperature of the second area; and
a controller configured to control energization to the first heater and the second heater based on an energization pattern determined, for each control period, based on a first detected temperature detected by the first temperature detector and a second detected temperature detected by the second temperature detector,
wherein, in a case where a length of the control period is T, a length of a period during which a first continuous energization control in which first AC current is continuously applied to the first heater is executed is T1, and a length of a period during which a second continuous energization control in which second AC current is continuously applied to the second heater is executed is T2, when a first condition represented by T1+T2<T is satisfied, the controller is configured to starts the second continuous energization control just after an end of the first continuous energization control.

### Claim 2 (depends on 1)

The fixing device according to claim 1,
wherein the controller is configured to execute a second start-time phase control in the middle of execution of the first continuous energization control, the second start-time phase control being a control executed before the second continuous energization control and energizing the second heater in parts of sine waves of the second AC current.

### Claim 3 (depends on 2)

The fixing device according to claim 2,
wherein the controller is configured to start the second start-time phase control at the same time as a start of the first continuous energization control when the first condition is satisfied.

### Claim 4 (depends on 2)

The fixing device according to claim 2,
wherein the controller is configured to stop, after the first continuous energization control is completed, energization to the first heater without executing a first end-time phase control when the first condition is satisfied, the first end-time phase control being a control executable after the first continuous energization control and energizing the first heater in parts of sine waves of the first AC current.

### Claim 5 (depends on 4)

The fixing device according to claim 4,
wherein a peak current in energization of the second continuous energization control is greater than a peak current in energization of the first continuous energization control.

### Claim 6 (depends on 2)

The fixing device according to claim 2,
wherein the first condition does not include a condition relating to a period of execution of the second start-time phase control.

### Claim 7 (depends on 2)

The fixing device according to claim 2,
wherein the controller is configured to execute energization to the first heater and the second heater so that a composite value of the first AC current and the second AC current is equal to or less than a peak current of the second AC current in the second start-time phase control.

### Claim 8 (depends on 2)

The fixing device according to claim 2,
wherein the controller is configured to gradually increase an energization amount of the second AC current per a half wave by changing a phase angle in the second start-time phase control.

### Claim 9 (depends on 1)

The fixing device according to claim 1,
wherein the controller is configured to fix a phase angle to be constant in a first start-time phase control, the first start-time phase control being a control executed before the first continuous energization control and energizing the first heater in parts of sine waves of the first AC current.

### Claim 10 (depends on 1)

The fixing device according to claim 1,
wherein the controller is configured to gradually decrease an energization amount of AC current per a half wave by changing the phase angle in (i) a first end-time phase control, (ii) a second end-time phase control, or (iii) both of the first-end-time phase control and the second end-time phase control, the first end-time phase control being a control executable after the first continuous energization control and energizing the first heater in parts of sine waves of the first AC current, the second end-time phase control being a control executable after the second continuous energization control and energizing the second heater in parts of sine waves of the second AC current.

### Claim 11

A method for controlling a fixing device which comprises a heating member configured to heat a sheet, a first heater having an output peak in a first area of the heating member and configured to heat the heating member, a second heater having an output peak in a second area different from the first area of the heating member and configured to heat the heating member, the method comprising the steps of:
controlling energization to the first heater and the second heater based on an energization pattern determined, for each control period, based on a temperature of the first area and a temperature of the second area; and
in a case where a length of the control period is T, a length of a period during which a first continuous energization control in which first AC current is continuously applied to the first heater is executed is T1, and a length of a period during which a second continuous energization control in which second AC current is continuously applied to the second heater is executed is T2, when a first condition represented by T1+T2<T is satisfied, starting a second continuous energization control just after an end of a first continuous energization control.

### Claim 12

An fixing device, comprising:
a heating member configured to heat a sheet;
a first heater having an output peak in a first area of the heating member and configured to heat the heating member;
a second heater having an output peak in a second area different from the first area of the heating member and configured to heat the heating member;
a first temperature detector configured to detect a temperature of the first area;
a second temperature detector configured to detect a temperature of the second area; and
a controller configured to control energization to the first heater and the second heater based on an energization pattern determined, for each control period, based on a first detected temperature detected by the first temperature detector and a second detected temperature detected by the second temperature detector,
wherein the energization pattern includes a prescribed energization pattern in which (i) a first start-time phase control performed is started at a start of the control period and a second end-time phase control is ended at an end of the control period and (ii) a peak current that is a first peak current value in the first start-time phase control agrees with a last peak current value as a composite value of first AC current and second AC current at an end of the second end-time phase control, the first start-time phase control being a control executed before a first continuous energization control in which the first AC current is continuously applied to the first heater is executed and energizing the first heater in parts of sine waves of the first AC current, the second end-time phase control being a control executable after a second continuous energization control in which the second AC current is continuously applied to the second heater is executed and energizing the second heater in parts of sine waves of the second AC current.

### Claim 13 (depends on 12)

The fixing device according to claim 12,
wherein the controller is configured to execute (i) a first end-time phase control that is a control executed after the first continuous energization control and energizing the first heater in parts of sine waves of the first AC current, and (ii) a second start-time phase control that is a control executed before the second continuous energization control and energizing the second heater in parts of sine waves of the second AC current.

### Claim 14 (depends on 12)

The fixing device according to claim 12,
wherein the controller is configured to gradually decrease an energization amount of the second AC current per a half wave by changing a phase angle in the second end-time phase control.

### Claim 15 (depends on 12)

The fixing device according to claim 12,
wherein, in a case where a length of the control period is T, a length of a period during which the first continuous energization control is T1, and a length of a period during which the second continuous energization control is T2, when a first condition represented by T1+T2<T is satisfied, the controller is configured to start the second continuous energization control just after an end of the first continuous energization control.

### Claim 16 (depends on 15)

The fixing device according to claim 15,
wherein the controller is configured to stop, after the first continuous energization control is completed, energization to the first heater without executing a first end-time phase control when the first condition is satisfied, the first end-time phase control being a control executable after the first continuous energization control and energizing the first heater in parts of sine waves of the first AC current.

### Claim 17 (depends on 12)

The fixing device according to claim 12,
wherein a peak current in energization of the second continuous energization control is greater than a peak current in energization of the first continuous energization control, and
wherein, in a case where a length of the control period is T, a length of a period during which the first continuous energization control is T1, and a length of a period during which the second continuous energization control is T2, when a second condition represented by T1+T2≥T and T1>T2 is satisfied, the controller is configured to start the second continuous energization control in the middle of the first continuous energization control.

### Claim 18 (depends on 17)

The fixing device according to claim 17,
wherein, when the second condition is satisfied and T1<T is satisfied, the controller is configured to execute a first end-time phase control after the first continuous energization control, the first end-time phase control being a control executed after the first continuous energization control and energizing the first heater in parts of sine waves of the first AC current.
