# US 2021/0199560 A1 · Method and system for predicting corrosion fatigue life of prestressed concrete bridges

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0199560 A1
- Document ID: US20210199560A1
- Status: Published application
- Kind: A1
- Application number: 16/758,868
- Filed: 2019-07-16
- Published: 2021-07-01
- Earliest claimed: 2018-08-27
- Assignees: Changsha University of Science and Technology
- Applicants: Changsha University of Science & Technology
- Inventors: Yafei MA; Xiaochao SU; Lei WANG; Jianren ZHANG; Zhongzhao GUO
- Web page: https://patentgrep.com/patent/US20210199560A1

## CPC

- E01D 22/00: Methods or apparatus for repairing or strengthening existing bridges {(electrochemical desalination or re-alkalisation C04B41/00); Methods or apparatus for dismantling bridges}
- G01N 17/006: {of metals}
- E01D 1/00: Bridges in general (characterised by their structural type E01D4/00 - E01D15/00)
- G01M 5/0008: {of bridges}
- G01M 5/0041: {by determining deflection or stress}
- G01N 3/32: by applying repeated or pulsating forces
- E01D 2101/26: reinforced
- E01D 2101/28: prestressed
- G01N 2203/0005: Repeated or cyclic
- G01N 2203/0073: Fatigue
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR

## Abstract

The invention discloses a method and a system for predicting the corrosion fatigue life of prestressed concrete bridges. A corrosion level of the strand is predicted to obtain the residual tension force of a structure. A stress concentration factor is integrated to consider the stress concentration effect caused by pitting corrosion, and a growth model of the elastic stress of the strand under the coupled effect of corrosion and fatigue is proposed. A growth model of the plastic stress of the strand is established using a cross-section loss of the strand as a fatigue damage parameter based on a degenerated elastic modulus of the concrete after fatigue. Failure criteria for the concrete, the strand, and a longitudinal tension bar are defined, so that a set of methods for analyzing the life of a prestressed concrete bridge subjected to corrosive environment and fatigue load are formed.

## Claims

### Claim 1

A method for predicting a corrosion fatigue life of prestressed concrete bridges, comprising the following steps:
1): calculating a continuously degenerating elastic strain εcen and an irrecoverable plastic strain αEPn at a edge of the concrete in a compression zone under a fatigue load, and a degenerated elastic modulus of the concrete;
2): predicting a corrosion level of a strand to obtain a residual tension force of a structure, and calculating a continuously-increasing strand stress σp,maxn and a longitudinal tension bar stress σs,maxn in a tensile region under a coupled action of corrosion and fatigue using the elastic strain εcen, the irrecoverable plastic strain εcpn, and a degenerated elastic modulus of the concrete and using a cross-section loss of a corroded strand as a fatigue damage parameter; and
3): performing a real time stress-strain calculation on the concrete, the longitudinal tension bar, and the strand in response to an increased quantity of times of the fatigue load, and determining a failure mode of the structure based on a stress-strain growth relationship model and the failure criteria of the concrete, a longitudinal tension bar, and a strand, to evaluate a fatigue life of the structure.

### Claim 2 (depends on 1)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 1, wherein in step 1), the elastic strain at an edge of the compression zone under the fatigue load is
ɛ
ce
n
=
(
M
p
n
-
M
0
n
-
1
)

x
n
E
e
n
-
1

I
cr
n
,
Ecn-1 and M0n-1 are an elastic modulus of the concrete and a bending moment effect caused by an effective tension force of the strand after (n−1) times of the fatigue load, respectively, and Mpn, xn and Icrn are a cross-section bending moment, a height of the compression zone, and an inertia moment of a cracked cross-section caused by a vehicle load after n times of fatigue cycles, respectively; and
the irrecoverable plastic strain εcpn at the edge of the compression zone is
ɛ
cp
n
=
f
c
0
E
c
0

{
∑
i
=
1
n

n
i

[
1

g
-
1

(
4
.
0

9

3

5

α
r
,
i
-
8
.
5

5

7

6
)
]
}
0
.
8

3

8

2
,
fc0 is an initial compressive strength of the concrete; Ec0 is an initial elastic modulus of the concrete; ni is the number of the ith fatigue load, and αr,i is a stress correlation coefficient at the edge of the compression zone after ith-level fatigue.

### Claim 3 (depends on 1)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 1, wherein in step 1), the elastic modulus of the concrete after n times of the fatigue is
E
c
n
=
σ
c
,
max
,
n
f
σ
c
,
max
,
n
f
β

E
c
0
+
f
c
0
E
c
0

{
∑
i
=
1
n


n
i

[
1

g
-
1

(
4.0935
·
α
r
,
i
-
8.5576
)
]
}
0
.
5

3

8

2
,
β is a correction coefficient, fc0 is an initial compressive strength of the concrete, Ec0 is an initial elastic modulus of the concrete, and ni is a number of the ith fatigue load, wherein σc,max,nf=Ecn-1εce,maxn, εce,maxn is a maximum value of the elastic strain; and Ecn-1 is a elastic modulus of the concrete after (n−1) times of the fatigue load.

### Claim 4 (depends on 2)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 2, wherein an inertia moment Icrn of the cracked cross-section is expressed as Icrn=⅓byn3+αEPnAp,en(hp−yn)2+αESnAs,en(hs−yn)2+αESnAs,en(yn−as′)2, b is a width of the cross-section, yn is a distance between a neutral axis of the cracked cross-section and the edge of the compression zone of the concrete after n times of fatigue, hs, hp, and αs′ are respectively distances from a center of the longitudinal tension bar, a center of the strand, and a center of longitudinal compression bars to the edge of the compression zone of the concrete (if the longitudinal tension bar and the strands have a same cross-section loss in a diameter direction, hs, hp, and αs′ are constant values in a fatigue period); αEPn and αESn are respectively a ratio of an elastic modulus of the strand to the elastic modulus Ecn-1 of the concrete and a ratio of an elastic modulus of the longitudinal tension bar to the elastic modulus Ecn-1 of the concrete after n times of fatigue; Ap,en, As,en, and As,e′n are respectively residual cross-sectional area of the strand, the longitudinal tension bar, and the longitudinal tension bar in the compression zone.

### Claim 5 (depends on 1)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 1, wherein in step 2), the stress of the strand under the combined action of the corrosion and the fatigue is σp,maxn=σp0n+σp1n+σp2n, σp0n is a tensile stress of the strand caused by a residual effective tension force Tρm,p,t at the time t, σp1n is an elastic stress of the strand caused by the fatigue load, and σp2n is a plastic stress of the strand caused by a plastic deformation of the concrete in the compression zone.

### Claim 6 (depends on 5)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 5, wherein the residual effective tension force at the time t is Tρm,p,t=EPεP(1−ρm,p,t)AP≈(1−ρm,p,t)·T0, EP and εP spare an elastic modulus and a strain of an uncorroded strand, and T0 is an initial tension force, respectively;
ρ
m
,
t
=
1
.
1

6

9
×
1

0
-
5
L
·
R

∫
0
t

i
ccor

(
t
)

dt
,
R is a corrosion variation coefficient for different types of steel bars in the structure, iccor is a corrosion current density, L is a corrosion length, and Ap is an initial cross-section area of the strand.

### Claim 7 (depends on 5)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 5, wherein σp0n=Tρm,p,t/Ap,en; the residual cross-sectional area of the strand after n times of the fatigue is
A
p
,
e
n
=
A
p
-
∑
k
=
1
n


1
N
k
-
1

(
A
p
-
A
p
,
e
k
-
1
)
,
Nk-1 is a life value corresponding to the S-N curve of the strand under a stress amplitude after (k−1)th time of the fatigue load;
σ
p

1
n
=
E
p

ɛ
ce
n

(
h
p
-
x
n
)
x
n
·
k
t
,
kt is a stress concentration coefficient caused by a pitting corrosion, Ep is an elastic modulus of the uncorroded strand, Ap is the initial cross-section area of the strand, Ap,ek-1 is a remaining effective cross-section area of the strand after (k−1)th times of the fatigue load, hp is a distance from a center of the cross-section of the strand to the edge of the compression zone of the concrete, εcpn is an irrecoverable plastic strain of the concrete at the edge of the compression zone after n times of the fatigue load;
ɛ
cp
n
=
f
c
0
E
c
0

{
∑
i
=
1
n

n
i

[
1

g
-
1

(
4
.
0

9

3

5

α
r
,
i
-
8
.
5

5

7

6
)
]
}
0
.
8

3

8

2
,
fc0 is an initial compressive strength of the concrete, Ec0 is an initial elastic modulus of the concrete, ni is the number of the ith fatigue load, and xn is the height of the compression zone after n times of the fatigue load; and σp2n=Ep·εppn, and
ɛ
sp
n
=
ɛ
cp
n
·
h
s
-
x
n
x
n
,
εppn is the plastic strain of the strand.

### Claim 8 (depends on 1)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 1, wherein a total stress of the longitudinal tension bar is σs,maxn=−σs0n+σs1n+σs2n, σs0n is 0,
σ
s

1
n
=
E
s

ɛ
ce
n

(
h
s
-
x
n
)
x
n
·
k
i
,
and σs2n=ES·εspn, εspn is a plastic strain of the longitudinal tension bar,
ɛ
sp
n
=
ɛ
cp
n
·
h
s
-
x
n
x
n
,
hs is a distance from a center of a cross-section of the longitudinal tension bar to the edge of the compression zone of the concrete, Es is the elastic modulus of the longitudinal tension bar, kt is the stress concentration coefficient caused by the pitting corrosion, and xn is a height of the compression zone height after n times of the fatigue load.

### Claim 9 (depends on 1)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 1, wherein a specific implementation process of step 4) comprises:
a): under a typical fatigue load, when n=1, calculating the irrecoverable plastic strain εcpn of the concrete, a total stress value σp,maxn of the strand, and a total stress value σs,maxn of the longitudinal tension bar, wherein n is the number of fatigue cycles;
b): determining whether a beam encounters a fatigue failure according to the fatigue failure criteria for the component materials in the following formulas, wherein the failure criterion for the concrete in the compression zone is εcpn≥0.4εc0n, εc0 is an ultimate compressive strain of the concrete under a static load; the failure criterion for the stand is σp,maxn>fu; and fu is the ultimate tensile strength of a strand; and the failure criterion for the longitudinal tension bar is σs,maxn≥fy, and fy is the yield strength of the longitudinal tension bar; and
c): if the beam does not fail, increasing n, and repeating steps a) and b) until a material fails, wherein the current fatigue cycles n is the fatigue life of the structure.

### Claim 10

A system for predicting the corrosion fatigue life of prestressed concrete bridges, comprising:
a calculating unit configured to: calculate a continuously degenerating elastic strain εcen, and irrecoverable plastic strain εcpn at the edge of the concrete in the compression zone under a fatigue load and a degenerated elastic modulus of the concrete;
a predicting unit configured to: predict a corrosion level of a strand to obtain a residual tension force of structure, and calculate continuously-increasing strand stress σp,maxn and longitudinal tension bar stress σs,maxn in a tensile region under a coupled action of corrosion and fatigue using the elastic strain εcen, the irrecoverable plastic strain εcpn, and the degenerated elastic modulus of the concrete and using a cross-section loss of a corroded strand as a fatigue damage parameter; and
an evaluating unit configured to: perform real time stress-strain calculation on the concrete, the longitudinal tension bar, and the strand in response to an increased number of fatigue load cycles, and determine a failure mode of the structure based on a stress-strain growth relationship model and the failure criteria of the concrete, a longitudinal tension bar, and a strand, to evaluate a fatigue life of the structure, where the evaluating unit specifically implements the following operations:
a): under a typical fatigue load, when n=1, calculating the irrecoverable plastic strain εcpn of the concrete, a total stress value σp,maxn of the strand, and a total stress value σs,maxn of the longitudinal tension bar, where n is the number of fatigue cycles;
b): determining whether a beam encounters a fatigue failure according to a fatigue failure criteria for the component materials in following formulas, where a failure criteria for the concrete in the compression zone is σp,maxn≥0.4εc0n, and εc0 is an ultimate compressive strain of the concrete under the static load; a failure criteria for the stand is σp,maxn>fu, and fu is an ultimate tensile strength of a strand; and a failure criteria for the longitudinal tension bar is σs,maxn≥fy, and fy is a yield strength of the longitudinal tension bar; and
c): if the beam does not fail, increasing n, and repeating steps a) and b) until a material fails, where the current fatigue cycles n is the fatigue life of the structure.

### Claim 11 (depends on 2)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 2, wherein in step 1), the elastic modulus of the concrete after n times of the fatigue is
E
c
n
=
σ
c
,
max
,
n
f
σ
c
,
max
,
n
f
β

E
c
0
+
f
C
0
E
c
0

{
∑
i
=
1
n

n
i

[
1

g
-
1

(
4

.0935
·
α
r
,
i
-
8
.
5

5

7

6
)
]
}
0

5

3

8

2
,
β is a correction coefficient, fc0 is an initial compressive strength of the concrete, Ec0 is an initial elastic modulus of the concrete, and ni is a number of the ith fatigue load, wherein σc,max,nf=Ecn-1εce,maxn, εce,maxn is a maximum value of the elastic strain; and Ecn-1 is a elastic modulus of the concrete after (n−1) times of the fatigue load.

### Claim 12 (depends on 2)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 2, wherein in step 2), the stress of the strand under the combined action of the corrosion and the fatigue is σp,maxn=σp0n+σp1n+σp2n, σp0n is a tensile stress of the strand caused by a residual effective tension force Tρm,p,t at a time t, σp1n is an elastic stress of the strand caused by the fatigue load, and σp2n is a plastic stress of the strand caused by a plastic deformation of the concrete in the compression zone.

### Claim 13 (depends on 3)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 3, wherein in step 2), the stress of the strand under the combined action of the corrosion and the fatigue is σp,maxn=σp0n+σp1n+σp2n, σp0n is a tensile stress of the strand caused by a residual effective tension force Tρm,p,t at a time t, σp1n is an elastic stress of the strand caused by the fatigue load, and σp2n is a plastic stress of the strand caused by a plastic deformation of the concrete in the compression zone.

### Claim 14 (depends on 4)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 4, wherein in step 2), the stress of the strand under the combined action of the corrosion and the fatigue is σp,maxn=σp0n+σp1n+σp2n, σp0n is a tensile stress of the strand caused by a residual effective tension force Tρm,p,t at a time t, σp1n is an elastic stress of the strand caused by the fatigue load, and σp2n is a plastic stress of the strand caused by a plastic deformation of the concrete in the compression zone.

### Claim 15 (depends on 5)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 5, wherein in step 2), the stress of the strand under the combined action of the corrosion and the fatigue is σp,maxn=σp0n+σp1n+σp2n, σp0n is a tensile stress of the strand caused by a residual effective tension force Tρm,p,t at a time t, σp1n is an elastic stress of the strand caused by the fatigue load, and σp2n is a plastic stress of the strand caused by a plastic deformation of the concrete in the compression zone.

### Claim 16 (depends on 12)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 12, wherein the residual effective tension force at the time t is Tρm,p,t=EPεP(1−ρm,p,t)AP≈(1−ρm,p,t)·T0, Ep and εp are an elastic modulus and a strain of an uncorroded strand, and T0 is an initial tension force, respectively;
ρ
m
,
t
=
1.169
×
10
-
5
L
·
R

∫
0
t

i
ccor

(
t
)

dt
,
R is a corrosion variation coefficient for different types of steel bars in the structure, iccor is a corrosion current density, L is a corrosion length, and Ap is an initial cross-section area of the strand.

### Claim 17 (depends on 13)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 13, wherein the residual effective tension force at the time t is Tρm,p,t=EPεP(1−ρm,p,t)AP≈(1−ρm,p,t)·T0, Ep and εp are an elastic modulus and a strain of an uncorroded strand, and T0 is an initial tension force, respectively;
ρ
m
,
t
=
1.169
×
10
-
5
L
·
R

∫
0
t

i
ccor

(
t
)

dt
,
R is a corrosion variation coefficient for different types of steel bars in the structure, iccor is a corrosion current density, L is a corrosion length, and Ap is an initial cross-section area of the strand.

### Claim 18 (depends on 14)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 14, wherein the residual effective tension force at the time t is Tρm,p,t=EPεP(1−ρm,p,t)AP≈(1−ρm,p,t)·T0, Ep and εp are an elastic modulus and a strain of an uncorroded strand, and T0 is an initial tension force, respectively;
ρ
m
,
t
=
1.169
×
10
-
5
L
·
R

∫
0
t

i
ccor

(
t
)

dt
,
R is a corrosion variation coefficient for different types of steel bars in the structure, iccor is a corrosion current density, L is a corrosion length, and Ap is an initial cross-section area of the strand.

### Claim 19 (depends on 15)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 15, wherein the residual effective tension force at the time t is Tρm,p,t=EPεP(1−ρm,p,t)AP≈(1−ρm,p,t)·T0, Ep and εp are an elastic modulus and a strain of an uncorroded strand, and T0 is an initial tension force, respectively;
ρ
m
,
t
=
1.169
×
10
-
5
L
·
R

∫
0
t

i
ccor

(
t
)

dt
,
R is a corrosion variation coefficient for different types of steel bars in the structure, iccor is a corrosion current density, L is a corrosion length, and Ap is an initial cross-section area of the strand.

### Claim 20 (depends on 12)

The method for predicting the corrosion fatigue life of the prestressed concrete bridges according to claim 12, wherein σp0n=Tρm,p,t/Ap,en; the residual cross-sectional area of the strand after n times of the fatigue is
A
p
,
e
n
=
A
p
-
∑
k
=
1
n


1
N
k
-
1

(
A
p
-
A
p
,
e
k
-
1
)
,
Nk-1 is a life value corresponding to the S-N curve of the strand under a stress amplitude after (k−1)th time of the fatigue load;
σ
p

1
n
=
E
p

ɛ
ce
n

(
h
p
-
x
n
)
x
n
·
k
t
,
kt is a stress concentration coefficient caused by a pitting corrosion, Ep is an elastic modulus of the uncorroded strand, Ap is the initial cross-section area of the strand, Ap,ek-1 is a remaining effective cross-section area of the strand after (k−1)th times of the fatigue load, hp is a distance from a center of the cross-section of the strand to the edge of the compression zone of the concrete, εcpn is an irrecoverable plastic strain of the concrete at the edge of the compression zone after n times of the fatigue load;
ɛ
cp
n
=
f
c
0
E
c
0

{
∑
i
=
1
n

n
i

[
1

g
-
1

(
4
.
0

9

3

5

α
r
,
i
-
8
.
5

5

7

6
)
]
}
0
.
8

3

8

2
,
fc0 is an initial compressive strength of the concrete, Ec0 is an initial elastic modulus of the concrete, ni is the number of the ith fatigue load, and xn is the height of the compression zone after n times of the fatigue load; and σp2n=Ep·εppn, and
ɛ
pp
n
=
ɛ
cp
n
·
h
p
-
x
n
x
n
,
εppn is the plastic strain of the strand.