# US 2021/0198908 A1 · Construction building equipment and construction method thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0198908 A1
- Document ID: US20210198908A1
- Status: Published application
- Kind: A1
- Application number: 17/035,702
- Filed: 2020-09-29
- Published: 2021-07-01
- Earliest claimed: 2019-12-29
- Assignees: The Third Construction Co., Ltd of China Construction Third Engneering Bureau; China Construction Third Engineering Bureau Group Co., Ltd; China State Construction Engineering Corporation Limited
- Applicants: The Third Construction Co., Ltd of China Construction Third Engneering Bureau; China Construction Third Engineering Bureau Group Co., Ltd; China State Construction Engineering Corporation
- Inventors: Xiaoqing Liu; Huayong Lu; Weixiang Ding; Wei Wang; Shiqing Qian; Jin Li; Guowei Xu; Buyue Zhang; Liai Xu; Zhihua Zhang; Dong Chen; Hanwen Liu; Heng Liu; Lei Wang; Di Li; Leilei Zhu; Jun Wang; Yanhua Zhao; Huiwen Deng; Haonan Wang; Shilong Wen; Xisheng Tian
- Web page: https://patentgrep.com/patent/US20210198908A1

## CPC

- E04G 11/28: Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer {and which are anchored in the hardened concrete}
- E04G 3/243: {following the outside contour of a building (E04G3/26 takes precedence)}
- E04G 3/28: Mobile scaffolds; Scaffolds with mobile platforms {(movable inspection or maintenance platforms for bridges E01D19/106, lifting devices for movable platforms, e.g. on vehicles B66F11/04)}
- E04G 2003/286: {mobile vertically}
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are clamped on the hanging pedestals. The sleeve frames are clamped on outer sides of the track columns. The lower reversing boxes are fixed at upper ends of the sleeve frames. The hydraulic cylinders are connected with the upper reversing boxes and the lower reversing boxes. Side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes. Upper ends of the track columns are fixedly connected with a top platform. Hangers and formworks are suspended on the top platform through booms.

## Claims

### Claim 1

A construction building equipment, comprising hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns,
wherein the multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall, the sleeve frames and the track columns are clamped on the hanging pedestals, the sleeve frames are clamped on outer sides of the track columns, the lower reversing boxes are fixed at upper ends of the sleeve frames, the hydraulic cylinders are connected to the upper reversing boxes and the lower reversing boxes, side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes, upper ends of the track columns are fixedly connected with a top platform, and hangers and formworks are suspended on the top platform through booms.

### Claim 2 (depends on 1)

The construction building equipment according to claim 1, wherein the hanging pedestals are provided with rotatable central hooks, the track columns are provided with multiple stoppers which are matched with the central hooks, and the central hooks are clamped under the stoppers to prevent the track columns from falling; and when the track columns are lifted, the stoppers located above the central hooks are separated from the central hooks, when the stoppers located under the central hooks move upwards to be in contact with the central hooks, the central hooks rotate under an acting force of the stoppers, and when the stoppers move upwards to positions above the central hooks, the central hooks return to initial positions, and the central hooks block the stoppers thereabove.

### Claim 3 (depends on 1)

The construction building equipment according to claim 1, wherein the hanging pedestals are provided with connecting bases, the top portions and the bottom portions of the sleeve frames are provided with lug plates used for cooperative fixing with the connecting bases, the lug plates are provided with short shafts, the short shafts are clamped in grooves of the connecting bases, the lug plates are rotatably disposed on the sleeve frames through rotating shafts, and the lug plates are further connected with the sleeve frames through tension springs.

### Claim 4 (depends on 3)

The construction building equipment according to claim 3, wherein guide bases are further disposed below the connecting bases, first guide wheels and second guide wheels are disposed on the guide bases, the first guide wheels are in contact with the sleeve frames, and the second guide wheels are in contact with the track columns.

### Claim 5 (depends on 1)

The construction building equipment according to claim 1, wherein the formworks are connected with lifting rings, the lifting rings are connected with the booms, and adjustable turnbuckles are disposed in middle portions of the booms.

### Claim 6 (depends on 1)

The construction building equipment according to claim 1, wherein the hangers are provided with walkway plates and flaps.

### Claim 7 (depends on 1)

The construction building equipment according to claim 1, wherein an awning device is disposed on the top platform, the awning device comprises slides, supporting keels and awning cloth, and the awning cloth is movable along the slides to be opened and closed.

### Claim 8 (depends on 1)

The construction building equipment according to claim 1, wherein the top platform is provided with hoisting equipment.

### Claim 9 (depends on 1)

The construction building equipment according to claim 1, wherein a material distributor is disposed on the top platform.

### Claim 10 (depends on 1)

A construction method adopting the construction building equipment according to claim 1, the construction method comprising the steps:
separating formworks from a wall body before an integrated platform is lifted, wherein the formworks include vertical formworks and horizontal formworks;
carrying the formworks through hydraulic cylinders to go up for one floor height;
binding vertical rebars of an upper floor;
assembling the vertical formworks after the vertical rebars of the upper floor are bound;
erecting the horizontal formworks; and
pouring concrete to complete construction of one floor.