# US 2021/0198899 A1 · Decking anchor, decking system utilizing the decking anchor, and method of installing the decking anchor

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0198899 A1
- Document ID: US20210198899A1
- Status: Published application
- Kind: A1
- Application number: 17/132,074
- Filed: 2020-12-23
- Published: 2021-07-01
- Earliest claimed: 2019-12-27
- Assignees: Verco Decking, Inc.
- Applicants: Verco Decking, Inc.
- Inventors: Christopher Lawrence Brown
- Web page: https://patentgrep.com/patent/US20210198899A1

## CPC

- E04F 15/02044: {Separate elements for fastening to an underlayer (E04F15/02133, E04F15/0215 take precedence)}
- E04B 5/17: Floor structures partly formed in situ
- E04B 9/18: Means for suspending the supporting construction
- E04F 15/06: of metal, whether or not in combination with other material (gratings as building elements E04C2/42 {; of elements with a metal upper layer; E04F15/02405 takes precedence; metal treads E04F11/112})
- E04F 15/08: only of stone or stone-like material, e.g. {ceramics}, concrete; of glass {or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass (E04F15/02005 takes precedence)}
- E04B 5/40: with metal form-slabs
- E04B 2005/176: {with peripheral anchors or supports}
- E04F 2015/02105: {without load-supporting elongated furring elements between the flooring elements and the underlayer}
- E04F: FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS (windows, doors E06B)
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})

## Abstract

The decking anchors may have a primary portion and a secondary portion that are operatively coupled together, such as through a fastener. The primary portion may comprise one or more primary projections (e.g., first and second primary projections) and/or the secondary portion may comprise one or more secondary projections (e.g., first and second secondary projections). In a first position adjacent projections may be retracted towards each other. In the first position the anchor may be installed into a cavity of the decking panel. The anchor may be rotated into a pre-installed position, and a force is exerted on the anchor such that the projections contact the webs of the decking. In response to continued force the projections move with respect to each other such that the anchor is moved into an installed position (e.g., the adjacent projections extend with respect to each other).

## Claims

### Claim 1

A decking anchor, the anchor comprising:
an anchor head comprising:
a primary anchor portion with one or more primary anchor projections; and
a secondary anchor portion with one or more secondary anchor projections, wherein the secondary anchor portion is operatively coupled to the primary anchor portion; and
a fastener operatively coupled to the primary anchor portion or the secondary anchor portion of the anchor head;
wherein in an assembly position the primary anchor portion and secondary anchor portion are configured to pass through an opening into a cavity of a flute of decking;
wherein the one or more primary anchor projections rotate with respect to the one or more secondary anchor projections to move from the assembly position to an installed position; and
wherein the one or more primary anchor projections and the one or more secondary anchor projections contact webs of the decking.

### Claim 2 (depends on 1)

The anchor of claim 1, wherein the one or more primary anchor projections rotate with respect to the one or more secondary anchor projections in response to the one or more primary anchor projections and the one or more secondary anchor projections being biased against the webs in the cavity of the decking.

### Claim 3 (depends on 1)

The anchor of claim 1, further comprises a biasing member, wherein the biasing member biases the primary anchor portion and the secondary anchor portion together.

### Claim 4 (depends on 3)

The anchor of claim 3, wherein the biasing member comprises a compression spring.

### Claim 5 (depends on 1)

The anchor of claim 1, wherein the primary anchor portion comprises a primary anchor aperture and wherein the secondary anchor portion comprises a secondary anchor aperture, and wherein the primary anchor aperture and the secondary anchor aperture are operatively coupled through the fastener.

### Claim 6 (depends on 5)

The anchor of claim 5, wherein the fastener comprises a fastener threaded portion and wherein the primary anchor aperture comprises a primary aperture threaded portion, and wherein the fastener threaded portion is operatively coupled to the primary aperture threaded portion.

### Claim 7 (depends on 1)

The anchor of claim 1, wherein the anchor head comprises a locking mechanism.

### Claim 8 (depends on 7)

The anchor of claim 7, wherein the locking mechanism comprises a tongue and groove connection operatively coupled to the primary anchor portion or the secondary anchor portion, wherein in the assembly position the tongue and groove connection is unlocked and in the installed position the tongue and groove connection is locked.

### Claim 9 (depends on 1)

The anchor of claim 1, wherein the primary anchor portion comprises a first primary anchor projection and a second primary anchor projection, and the secondary anchor portion comprises a first secondary anchor projection and a secondary primary anchor projection.

### Claim 10 (depends on 9)

The anchor of claim 9, wherein the first primary anchor projection and the first secondary anchor projection contact a first web, and the second primary anchor projection and the second secondary anchor projection contact a second web.

### Claim 11 (depends on 1)

The anchor of claim 1, wherein at least a portion of the one or more primary anchor projections or the one or more secondary anchor projections comprise a curved surface.

### Claim 12 (depends on 1)

The anchor of claim 1, further comprises:
a removal mechanism operatively coupled to the primary anchor portion or the secondary anchor portion, wherein the removal mechanism allows movement of the primary anchor portion with respect to the secondary anchor portion.

### Claim 13 (depends on 12)

The anchor of claim 12, wherein the removal mechanism comprises one or more removal apertures in the primary anchor portion or the secondary anchor portion, wherein the one or more removal apertures receives a tool for moving the primary anchor portion with respect to the secondary anchor portion.

### Claim 14 (depends on 1)

The anchor of claim 1, further comprising:
a stop operatively coupled to the fastener, wherein the stop impedes movement of the anchor within the decking when the stop is operatively coupled to the decking.

### Claim 15

A decking system, the system comprising:
decking having a plurality of flutes, wherein the flutes comprise an upper flange, a portion of a first lower flange and a portion of second lower flange, and webs operatively coupling the upper flange to the first lower flange and the second lower flange; and
one or more anchors, wherein each of the one or more anchors comprise:
an anchor head comprising:
a primary anchor portion with one or more primary anchor projections; and
a secondary anchor portion with one or more secondary anchor projections, wherein the secondary anchor portion is operatively coupled to the primary anchor portion; and
a fastener operatively coupled to the primary anchor portion or the secondary anchor portion of the anchor head;
wherein in an assembly position the primary anchor portion and the secondary anchor portion are configured to pass through an opening into a cavity of a flute of the decking;
wherein the one or more primary anchor projections rotate with respect to the one or more secondary anchor projections to move from the assembly position to an installed position; and
wherein the one or more primary anchor projections and the one or more secondary anchor projections contact webs of the decking.

### Claim 16 (depends on 15)

The decking system of claim 15, wherein the one or more primary anchor projections rotate with respect to the one or more secondary anchor projections in response to the one or more primary anchor projections and the one or more secondary anchor projections being biased against the webs in the cavity of the decking.

### Claim 17 (depends on 15)

The decking system of claim 15, wherein the one or more anchors further comprise:
a biasing member, wherein the biasing member biases the primary anchor portion and the secondary anchor portion together.

### Claim 18 (depends on 15)

The decking system of claim 15, wherein the primary anchor portion comprises a primary anchor aperture and wherein the secondary anchor portion comprises a secondary anchor aperture, and wherein the primary anchor aperture and the secondary anchor aperture are operatively coupled through the fastener.

### Claim 19 (depends on 15)

The decking system of claim 15, wherein the anchor head comprises a locking mechanism.

### Claim 20

A method of installing an anchor in decking, the method comprising:
installing an anchor head into a cavity of a flute within the decking with the anchor head in an assembly position;
wherein the decking comprises a plurality of flutes, wherein the plurality of flutes comprise an upper flange, a portion of a first lower flange and a portion of second lower flange, and webs operatively coupling the upper flange to the first lower flange and the second lower flange; and
wherein the anchor comprises:
the anchor head comprising:
a primary anchor portion with one or more primary anchor projections; and
a secondary anchor portion with one or more secondary anchor projections, wherein the secondary anchor portion is operatively coupled to the primary anchor portion; and
a fastener operatively coupled to the primary anchor portion or the secondary anchor portion of the anchor head;
wherein in the assembly position the primary anchor portion and the secondary anchor portion are configured to pass through an opening into the cavity of the flute of the decking;
installing the anchor into an installed position;
wherein during installation the one or more primary anchor projections rotate with respect to the one or more secondary anchor projections to move from the assembly position to the installed position; and
wherein the one or more primary anchor projections and the one or more secondary anchor projections contact the webs of the decking.