# US 2021/0197480 A1 · Forming layers of build material

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0197480 A1
- Document ID: US20210197480A1
- Status: Published application
- Kind: A1
- Application number: 16/074,851
- Filed: 2017-04-04
- Published: 2021-07-01
- Earliest claimed: 2017-04-04
- Assignees: Hewlett-Packard Development Company, L.P.
- Applicants: Hewlett-Packard Development Company, L.P.
- Inventors: William E. HERTLING; Benjiman WHITE; Mike WHITMARSH
- Web page: https://patentgrep.com/patent/US20210197480A1

## CPC

- B29C 64/314: Preparation
- B22F 10/20: Direct sintering or melting
- B22F 10/30: Process control
- B29C 64/218: Rollers
- B29C 64/232: for motion along the axis orthogonal to the plane of a layer
- B29C 64/236: for motion in a direction within the plane of a layer
- B29C 64/245: Platforms or substrates (support structures intended to be sacrificed after manufacture B29C64/40)
- B29C 64/393: for controlling or regulating additive manufacturing processes
- B33Y 10/00: Processes of additive manufacturing
- B33Y 30/00: Apparatus for additive manufacturing; Details thereof or accessories therefor
- B33Y 40/10: Pre-treatment
- B33Y 50/02: for controlling or regulating additive manufacturing processes
- B22F 12/52: Hoppers
- B22F 12/63: Rollers
- B22F 2999/00: Aspects linked to processes or compositions used in powder metallurgy
- B33Y 40/00: Auxiliary operations or equipment, e.g. for material handling
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- B22F: WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER (making alloys by powder metallurgy C22C); APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B33Y: ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING

## Abstract

According to one aspect, there is provided a method of forming a layer of build material on a build platform of a three-dimensional printing system. The method comprises obtaining characteristics of a build volume to be processed, determining characteristics of a volume of build material to be used to form the layer, forming an intermediate volume of build material having the determined characteristics, and spreading the intermediate volume of build material over the build platform to form the layer.

## Claims

### Claim 1

A build material distribution system to form a layer of build material on a build platform of a three-dimensional printer, comprising:
a build material preparation module to form an intermediate volume of build material on a build material support;
a build material distributor to spread the intermediate volume of build material over the build platform; and
a controller to:
obtain dimensions of a build volume to be processed;
control the build material preparation module to form an intermediate volume of build material on the build material support, the intermediate volume having dimensions based on the obtained build volume dimensions; and
control the build material distributor to spread the intermediate volume of build material over the build platform to form a layer of build material having at least one dimension associated with a dimension of the build volume.

### Claim 2 (depends on 1)

The system of claim 1, further comprising a build material distributor to form an initial volume of build material of the build material support, and wherein the build material preparation module is controlled to modify the initial volume of build material for a given layer based on the obtained build volume dimensions.

### Claim 3 (depends on 2)

The system of claim 2, wherein the build material distributor is to form an initial volume of build material along, or substantially along, the whole length of the build material support.

### Claim 4 (depends on 2)

The system of claim 2, wherein the build material preparation module is controlled to spread the initial volume of build material longitudinally along the build material support.

### Claim 5 (depends on 4)

The system of claim 4, wherein the build material preparation module is to spread the initial volume of build material in an axis orthogonal to the spreading axis of the build material distributor.

### Claim 6 (depends on 2)

The system of claim 2, wherein the build material preparation module is height adjustable to enable the length over which the initial volume of build material is spread to be varied in accordance with the build volume dimensions.

### Claim 7 (depends on 5)

The system of claim 5, wherein the build material preparation module comprises any one of: a roller; a wiper; and a shaping member.

### Claim 8 (depends on 1)

The system of claim 1, wherein the system is to form a layer of build material that has at least one of an x-axis and a y-axis dimension associated with a corresponding dimension of the build volume.

### Claim 9 (depends on 1)

The system of claim 1, wherein the system is to form a layer of build material that has both an x-axis and a y-axis dimensions associated with corresponding dimensions of the build volume.

### Claim 10 (depends on 1)

The system of claim 1, wherein the system is to, when the dimensions of the build volume are less than the dimensions of the build platform, form a layer of build material that has one or both of: an x-axis dimension less than a corresponding dimension of the build platform; a y-axis dimension less than a corresponding dimension of the build platform.

### Claim 11

A method of forming a layer of build material on a build platform of a three-dimensional printing system comprising:
obtaining characteristics of a build volume to be processed;
determining characteristics of a volume of build material to be used to form the layer;
forming an intermediate volume of build material having the determined characteristics; and
spreading the intermediate volume of build material over the build platform to form the layer.

### Claim 12 (depends on 11)

The method of claim 11, wherein forming an intermediate volume of build material comprises modifying an initial volume of build material formed on a build material support.

### Claim 13 (depends on 11)

The method of claim 11, wherein forming an intermediate volume of build material comprises forming a volume of build material having a length corresponding to a length of the build volume.

### Claim 14 (depends on 12)

The method of claim 12, wherein forming an intermediate volume of build material further comprises reducing the quantity of build material in the initial volume such that the formed layer of build material has a width corresponding to the width of the build volume.

### Claim 15 (depends on 1)

A three-dimensional printer comprising a build material distribution system according to claim 1.
