# US 2021/0179279 A1 · Parachute compound pulley ripcord pull force reducer and methods for utilizing same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0179279 A1
- Document ID: US20210179279A1
- Status: Published application
- Kind: A1
- Application number: 17/115,798
- Filed: 2020-12-09
- Published: 2021-06-17
- Earliest claimed: 2019-12-13
- Assignees: Uninsured United Parachute Technologies, LLC
- Applicants: Uninsured United Parachute Technologies, LLC.
- Inventors: Ty Philip Bowen
- Web page: https://patentgrep.com/patent/US20210179279A1

## CPC

- B64D 17/52: Opening, e.g. manual
- B64D 17/46: Closing means
- B64D 17/64: by extractor parachute
- B64D: EQUIPMENT FOR FITTING IN OR TO AIRCRAFT; FLIGHT SUITS; PARACHUTES; ARRANGEMENT OR MOUNTING OF POWER PLANTS OR PROPULSION TRANSMISSIONS IN AIRCRAFT

## Abstract

An apparatus and an article of manufacture providing a parachute ripcord pull force reducer device, method and system offering mechanical gain such that the pull force required to pull the main parachute closing pin is reduced. Further disclosed is a parachute container using the novel parachute ripcord pull force reducer, and methods for manufacturing and/or modifying a parachute to operate with various embodiments of the ripcord pull force reducer in accordance with the instant disclosure.

## Claims

### Claim 1

A parachute compound pulley ripcord pull force reducer comprising:
An activation line having a first end fixedly coupled to a movable pulley member, the activation line extending therefrom and slidingly engages a pin at a pin engagement point, a portion of the activation line forming a first tension section extending generally between the pulley member and an anchor point, the activation line further extending from the anchor point to the pulley member and slidingly engaging the pulley member, a portion of the activation line forming a second tension section between the anchor point and the pulley member, and further extending away from the pulley member to form a third tension section coupled to a pull handle, the activation line being arranged such that a tensile force applied to the pull handle is transmitted to the pin via the first, second, and third tension sections.

### Claim 2 (depends on 1)

The parachute ripcord pull force reducer as claimed in claim 1, wherein the second and third tension sections being arranged such that when tensile force is applied to the activation line from the pull handle, the second and third tension sections form a pulley angle smaller than 180° therebetween, and the pulley angle apex being at the pulley member, and the second and third tension section imparting a tensile force on the pulley member.

### Claim 3 (depends on 2)

The parachute ripcord pull force reducer as claimed in claim 2 wherein the pulley angle is dynamically determined.

### Claim 4 (depends on 1)

The pull force reducer as claimed in claim 1, wherein the pulley member being arranged such that when tensile force is applied to the activation line from the pull handle, the second and third tension sections impart a tensile force to the pulley member and causing movement thereof in a direction that form a pin angle smaller than 180° between a first and a second sections of the first tension section, the first and second force sections being dynamically determined at the pin engagement point, the pin angle apex being at the pin engagement point.

### Claim 5 (depends on 1)

The parachute ripcord pull force reducer as claimed in claim 1, wherein the pin angle is dynamically determined.

### Claim 6 (depends on 1)

The parachute ripcord pull force reducer as claimed in claim 1, wherein the pin comprises an eyelet and the eyelet is the engagement point.

### Claim 7 (depends on 1)

The parachute ripcord pull force reducer as claimed in claim 1 wherein the first tension section is formed by a first activation line segment and the second and third tension sections are formed by a second activation line segment.

### Claim 8 (depends on 1)

The parachute ripcord pull force reducer as claimed in claim 1 wherein the anchor point comprises a second pulley member, and wherein the activation cord slidingly engages the second pulley member.

### Claim 9 (depends on 8)

The parachute ripcord pull force reducer as claimed in claim 8, wherein the first tension section and the second tension section are delineated at the second pulley member.

### Claim 10 (depends on 10)

A parachute compound pulley ripcord pull force reducer comprising;
a pin activation line having a first end fixedly coupled to a movable pulley member, the pin activation line extending from the pulley member, and slidingly engages a pin at a pin engagement point, at least a portion of the pin activation line forming a first tension section extending generally between the pulley member and a first anchor point;
a pulley activation line extending from a second anchor point to the pulley member and slidingly engaging therewith, a portion of the pulley activation line forming a second tension section between the second anchor point and the pulley member, the pulley activation line further extending away from the pulley member to form a third tension section coupled to a pull handle. The parachute ripcord pull force reducer as claimed in claim 10, wherein the second and third tension sections being arranged such that when tensile force is applied to the pulley activation line from the pull handle, the second and third tension sections form a pulley angle smaller than 180° therebetween, the pulley angle apex being at the pulley member, and the second and third tension section imparting a tensile force on the pulley member.

### Claim 11 (depends on 10)

The parachute ripcord pull force reducer as claimed in claim 10, wherein the pulley angle is dynamically determined.

### Claim 12 (depends on 10)

The parachute ripcord pull force reducer as claimed in claim 10, wherein the pulley member being arranged such that when tensile force is applied to the activation line from the pull handle the second and third tension section impart a tensile force on the pulley member and causing movement thereof in direction that form a pin angle smaller than 180° between a first and a second force sections of the first tension section, the first and second force sections being dynamically determined at the engagement point, the pin angle apex being at the pin engagement point.

### Claim 13 (depends on 12)

The parachute ripcord pull force reducer as claimed in claim 12, wherein the pin angle is dynamically determined.

### Claim 14

A parachute container comprising:
a. A compartment comprising a backing and at least one flap having a closing hole;
b. a closing loop coupled to the container, the closing loop positioned to interact with the closing hole to maintain the flap is a closed state by a pin passed in the closing loop, the pin having a pin engagement point;
c. an anchor point coupled to the container;
d. an activation line having a pulley member coupled to an end thereof, the activation line extending from the pulley member and slidingly engaging the pin at an engagement point, a portion of the activation line forming a first tension section extending generally between the pulley member and the anchor point, the activation line further extending from the anchor point to the pulley member and slidingly engaging the pulley member, a portion of the activation line forming a second tension section between the anchor point and the pulley member, and further extending away from the pulley member to form a third tension section coupled to a pull handle.

### Claim 15 (depends on 14)

The parachute container as claimed in claim 14, wherein the, second and third tension sections being arranged such that when tensile force is applied to the activation line from the pull handle, the second and third tension sections form a pulley angle therebetween, the pulley angle apex being at the pulley member, and the second and third tension section imparting a tensile force on the pulley member.

### Claim 16 (depends on 15)

The parachute container as claimed in claim 15, wherein the pulley angle is dynamically determined.

### Claim 17 (depends on 14)

The parachute container as claimed in claim 14, wherein the pulley member being arranged such that when tensile force is applied to the activation line from the pull handle the second and third tension section impart a tensile force on the pulley member and causing movement thereof in a direction that form a pin angle between a first and a second force sections of the first tension section, the first and second force sections being dynamically determined at the engagement point, the pin angle apex being at the engagement point.

### Claim 18 (depends on 17)

The parachute container as claimed in claim 17, wherein the pin angle is dynamically determined.

### Claim 19 (depends on 14)

A parachute container as claimed in claim 14, wherein the first tension section is formed by a first activation line segment and the second and third tension sections are formed by a second activation line segment.

### Claim 20 (depends on 14)

The parachute container as claimed in claim 14 wherein the anchor point comprises a second pulley member, and wherein the activation cord slidingly engages the second pulley member.

### Claim 21

A method of modifying a parachute having a parachute container having at least one flap secured by a closing loop interacting with a pin having pain engagement point, a ripcord mechanism coupled to the pin, the method characterized by:
slidingly engaging the pin by a pin activation line having a first end fixedly coupled to a movable pulley member;
extending the pin activation line from the pin engagement point and coupling the pin activation line to the container;
coupling a pulley activation line to the container;
extending the pulley activation line from the container to the movable pulley member and slidingly engaging the pulley activation line with the movable pulley member;
and extending the pulley activation line away from the movable pulley member to form a third tension section coupled to a ripcord pull handle.

### Claim 22 (depends on 21)

The method of claim 21 wherein the pin activation line and the pulley activation line are coupled to the container at a single anchor point.

### Claim 23 (depends on 21)

The method of claim 21 wherein the pin activation line and the pulley activation line comprise a single line.

### Claim 24 (depends on 23)

The method of claim 23, wherein the single activation line is slidingly coupled to the container.