# US 2021/0178649 A1 · Control device and control method for injection molding machine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0178649 A1
- Document ID: US20210178649A1
- Status: Published application
- Kind: A1
- Application number: 17/112,467
- Filed: 2020-12-04
- Published: 2021-06-17
- Earliest claimed: 2019-12-11
- Assignees: Fanuc Corporation
- Applicants: Fanuc Corporation
- Inventors: Atsushi Horiuchi
- Web page: https://patentgrep.com/patent/US20210178649A1

## CPC

- B29C 45/77: of velocity or pressure of moulding material
- B29C 45/461: {Injection of measured doses}
- B29C 45/50: Axially movable screw
- B29C 45/766: {the setting or resetting of moulding conditions, e.g. before starting a cycle}
- B29C 2045/5096: {decompression of the moulding material by retraction or opposite rotation of the screw}
- B29C 2945/76367: Metering
- B29C 2945/76846: Metering
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)

## Abstract

A control device for an injection molding machine including a cylinder into which a resin is supplied, and a screw that moves forward and rearward and rotates inside the cylinder, includes a suck back control unit that sucks back the screw based on a predetermined suck back speed and a suck back distance or a suck back time period, a pressure acquisition unit that acquires a pressure of the resin, a calculation unit which calculates a compensation amount of the suck back speed, based on a difference between the pressure of the resin at a time when sucking back is completed and a predetermined target pressure, and a speed determination unit that newly determines the suck back speed based on the compensation amount.

## Claims

### Claim 1

A control device for an injection molding machine, the injection molding machine including a cylinder into which a resin is supplied, and a screw configured to move forward and rearward and rotate inside the cylinder, the injection molding machine being configured to perform metering of the resin while the resin is being melted inside the cylinder, by causing the screw to be moved rearward to a predetermined metering position while being forwardly rotated, the control device comprising:
a suck back control unit configured to suck back the screw, based on a predetermined suck back speed and a suck back distance or a suck back time period, after the screw has reached the predetermined metering position;
a pressure acquisition unit configured to acquire a pressure of the resin;
a calculation unit configured to, based on a difference between the pressure of the resin at a time when sucking back is completed and a predetermined target pressure, calculate a compensation amount of the suck back speed that causes the pressure of the resin to reach the target pressure at a time when sucking back is performed based on the suck back distance or the suck back time period; and
a speed determination unit configured to newly determine the suck back speed based on the compensation amount.

### Claim 2 (depends on 1)

The control device for the injection molding machine according to claim 1, further comprising:
a table in which there are defined a plurality of coefficients corresponding to types of the screw;
wherein the calculation unit selects one of the coefficients by referring to the table and based on the type of the screw, and calculates the compensation amount based on a product of the selected coefficient and the difference.

### Claim 3 (depends on 2)

The control device for the injection molding machine according to claim 2, wherein:
the table defines the plurality of coefficients corresponding to the types of the screw and types of the resin; and
the calculation unit selects one of the coefficients by referring to the table and based on the type of the screw and the type of the resin.

### Claim 4 (depends on 1)

The control device for the injection molding machine according to claim 1, further comprising an operation unit through which an operator instructs the target pressure.

### Claim 5 (depends on 1)

The control device for the injection molding machine according to claim 1, further comprising a notification unit configured to issue a notification of at least one of the difference calculated by the calculation unit, the compensation amount calculated by the calculation unit, and the suck back speed newly determined by the speed determination unit.

### Claim 6 (depends on 1)

The control device for the injection molding machine according to claim 1, further comprising:
a counting unit configured to count a number of times that the calculation unit has calculated the compensation amount; and
a storage unit configured to cumulatively store the compensation amount calculated by the calculation unit;
wherein the speed determination unit does not newly determine the suck back speed based on the compensation amount until the number of times that the calculation unit has calculated the compensation amount reaches a predetermined number of times, and when the number of times that the calculation unit has calculated the compensation amount reaches the predetermined number of times, the speed determination unit obtains one of a minimum value, a maximum value, an average value, a median value, and a mode value of the plurality of compensation amounts stored in the storage unit, and newly determines the suck back speed based on the obtained value.

### Claim 7

A method of controlling an injection molding machine, the injection molding machine including a cylinder into which a resin is supplied, and a screw configured to move forward and rearward and rotate inside the cylinder, the injection molding machine being configured to perform metering of the resin while the resin is being melted inside the cylinder, by causing the screw to be moved rearward to a predetermined metering position while being forwardly rotated, the method comprising:
a suck back control step of sucking back the screw, based on a predetermined suck back speed and a suck back distance or a suck back time period, after the screw has reached the predetermined metering position;
a pressure acquisition step of acquiring a pressure of the resin at a time when sucking back is completed;
a calculation step of calculating, based on a difference between the pressure of the resin at the time when sucking back is completed and a predetermined target pressure, a compensation amount of the suck back speed that causes the pressure of the resin to reach the target pressure at a time when sucking back is performed based on the suck back distance or the suck back time period; and
a speed determination step of newly determining the suck back speed based on the compensation amount.
