# US 2021/0175104 A1 · Adaptive control of variability in device performance in advanced semiconductor processes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0175104 A1
- Document ID: US20210175104A1
- Status: Published application
- Kind: A1
- Application number: 17/182,119
- Filed: 2021-02-22
- Published: 2021-06-10
- Earliest claimed: 2018-10-09
- Assignees: Applied Materials, Inc.
- Applicants: Applied Materials, Inc.
- Inventors: Samer BANNA; Lior ENGEL; Dermot CANTWELL
- Web page: https://patentgrep.com/patent/US20210175104A1

## CPC

- H10P 72/0604: {Process monitoring, e.g. flow or thickness monitoring}
- G05B 13/0265: {the criterion being a learning criterion}
- G05B 13/048: {using a predictor}
- G05B 17/02: electric
- H01J 37/32926: {Software, data control or modelling}
- H10P 74/203: {Structural properties, e.g. testing or measuring thicknesses, line widths, warpage, bond strengths or physical defects}
- H10P 74/207: {Electrical properties, e.g. testing or measuring of resistance, deep levels or capacitance-voltage characteristics}
- H10P 74/23: {characterised by multiple measurements, corrections, marking or sorting processes}
- H10P 74/238: {comprising acting in response to an ongoing measurement without interruption of processing, e.g. endpoint detection or in-situ thickness measurement}
- H01J 2237/3341: Reactive etching
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H01J: ELECTRIC DISCHARGE TUBES OR DISCHARGE LAMPS (spark-gaps H01T; electric arc lamps H05B31/00; particle accelerators H05H)

## Abstract

Systems and methods for controlling device performance variability during manufacturing of a device on wafers are disclosed. The system includes a process platform, on-board metrology (OBM) tools, and a first server that stores a machine-learning based process control model. The first server combines virtual metrology (VM) data and OBM data to predict a spatial distribution of one or more dimensions of interest on a wafer. The system further comprises an in-line metrology tool, such as SEM, to measure the one or more dimensions of interest on a subset of wafers sampled from each lot. A second server having a machine-learning engine receives from the first server the predicted spatial distribution of the one or more dimensions of interest based on VM and OBM, and also receives SEM metrology data, and updates the process control model periodically (e.g., wafer-to-wafer, lot-to-lot, chamber-to-chamber etc.) using machine learning techniques.

## Claims

### Claim 1

A computer-implemented method for controlling device performance variability between different lots of wafers during manufacturing of a device, the method comprising:
receiving, from one or more chambers in a processing platform, sensor trace data associated with a current lot of wafers being processed in the one or more chambers;
receiving in-line metrology data from a subset of processed wafers of the current lot of wafers;
receiving historic device data related to devices on the current lot of wafers;
receiving process data about a current process of record (POR);
receiving chamber characteristic data about the one or more chambers;
converting the sensor trace data, the in-line metrology data, the historic device data, the process data about the current POR and the chamber characteristic data about the one or more chambers into device processing data for the current lot of wafers;
providing the current device processing data as input to a trained machine-learning model;
obtaining, from the trained machine-learning model, one or more outputs indicative of predictive data; and
causing, based on the one or more outputs indicative of the predictive data, performance of one or more corrective actions associated with the one or more chambers and the current POR prior to processing a subsequent lot of wafers, such that device performance variability between different lots of wafers is minimized.

### Claim 2 (depends on 1)

The method of claim 1, wherein receiving the in-line metrology data comprises receiving image data generated by a scanning electron microscope in a non-destructive way.

### Claim 3 (depends on 1)

The method of claim 1, wherein receiving the historic device data comprises receiving at least one of device yield data produced by electric test from a previous lot of wafers, or image data produced by transmission electron microscopy (TEM) from a previous lot of wafers.

### Claim 4 (depends on 1)

The method of claim 1, wherein the trained machine-learning model comprises a model that outputs an updated spatial model predicting variation of one or more dimensions of interest of a device on a specific lot of wafers being processed using the current POR.

### Claim 5 (depends on 4)

The method of claim 4, wherein the predicted variation of one or more dimensions of interest of the device on the specific lot of wafers being processed using the current POR corresponds to the chamber characteristics data for the one or more chambers being used to process the current lot of wafers.

### Claim 6 (depends on 5)

The method of claim 5, wherein causing performance of one or more corrective actions comprises adjusting one or more characteristics of the one or more chambers to match the predicted dimensions of interest of the device on the subsequent lot of wafers.

### Claim 7 (depends on 6)

The method of claim 6, further comprising:
selecting a specific chamber of the one or more chambers in a multi-chamber platform as a reference chamber for calibrating other chambers of the multi-chamber platform.

### Claim 8 (depends on 5)

The method of claim 5, wherein causing performance of one or more corrective actions comprises adjusting one or process parameters of the current POR to match the predicted dimensions of interest of the device on the subsequent lot of wafers.

### Claim 9 (depends on 1)

The method of claim 1, wherein the subset of wafers is selected by sampling wafers from successive lots based on a predefined sampling scheme.

### Claim 10 (depends on 9)

The method of claim 9, wherein the predefined sampling scheme further comprises ranking individual wafers in the subset of wafers based on identified hot spots or other points of failure.

### Claim 11

A system comprising:
a processing platform comprising one or more chambers; and
a server with a processing device coupled to the processing platform; wherein the processing device performs operations comprising:
receiving, from one or more chambers in a processing platform, sensor trace data associated with a current lot of wafers being processed in the one or more chambers;
receiving in-line metrology data from a subset of processed wafers of the current lot of wafers;
receiving historic device data related to devices on the current lot of wafers;
receiving process data about a current process of record (POR);
receiving chamber characteristic data about the one or more chambers;
converting the sensor trace data, the in-line metrology data, the historic device data, the process data about the current POR and the chamber characteristic data about the one or more chambers into device processing data for the current lot of wafers;
providing the current device processing data as input to a trained machine-learning model;
obtaining, from the trained machine-learning model, one or more outputs indicative of predictive data; and
causing, based on the one or more outputs indicative of the predictive data, performance of one or more corrective actions associated with the one or more chambers and the current POR prior to processing a subsequent lot of wafers, such that device performance variability between different lots of wafers is minimized.

### Claim 12 (depends on 11)

The system of claim 11, wherein receiving the in-line metrology data comprises receiving image data generated by a scanning electron microscope in a non-destructive way.

### Claim 13 (depends on 11)

The system of claim 11, wherein receiving the historic device data comprises receiving at least one of device yield data produced by electric test from a previous lot of wafers, or image data produced by transmission electron microscopy (TEM) from a previous lot of wafers.

### Claim 14 (depends on 11)

The system of claim 11, wherein the trained machine-learning model comprises a model that outputs an updated spatial model predicting variation of one or more dimensions of interest of a device on a specific lot of wafers being processed using the current POR.

### Claim 15 (depends on 14)

The system of claim 14, wherein the predicted variation of one or more dimensions of interest of the device on the specific lot of wafers being processed using the current POR corresponds to the chamber characteristics data for the one or more chambers being used to process the current lot of wafers.

### Claim 16 (depends on 15)

The system of claim 15, wherein causing performance of one or more corrective actions comprises adjusting one or more characteristics of the one or more chambers to match the predicted dimensions of interest of the device on the subsequent lot of wafers.

### Claim 17 (depends on 16)

The system of claim 16, further comprising:
selecting a specific chamber of the one or more chambers in a multi-chamber platform as a reference chamber for calibrating other chambers of the multi-chamber platform.

### Claim 18 (depends on 15)

The system of claim 15, wherein causing performance of one or more corrective actions comprises adjusting one or process parameters of the current POR to match the predicted dimensions of interest of the device on the subsequent lot of wafers.

### Claim 19 (depends on 11)

The system of claim 11, wherein the subset of wafers is selected by sampling wafers from successive lots based on a predefined sampling scheme.

### Claim 20 (depends on 19)

The system of claim 19, wherein the predefined sampling scheme further comprises ranking individual wafers in the subset of wafers based on identified hot spots or other points of failure.
