# US 2021/0174279 A1 · Mining System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0174279 A1
- Document ID: US20210174279A1
- Status: Published application
- Kind: A1
- Application number: 16/764,731
- Filed: 2018-10-31
- Published: 2021-06-10
- Earliest claimed: 2017-11-15
- Assignees: Technological Resources Pty. Limited
- Applicants: Technological Resources Pty. Limited
- Inventors: Andrew Hill; Thomas Albrecht; Konstantin M. Seiler; Andrew W. Palmer; Steven J. Scheding; Glenn Callow
- Web page: https://patentgrep.com/patent/US20210174279A1

## CPC

- G06Q 10/06313: {Resource planning in a project environment}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/06317: {Resource planning based on arrival predictions or arrival tracking}
- G06Q 10/103: {Workflow collaboration or project management}
- G06Q 50/02: Agriculture; Fishing; Forestry; Mining
- E21F 17/00: Methods or devices for use in mines or tunnels, not covered elsewhere (mine lighting F21, H05B)
- G05B 2219/32423: Task planning
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- E21F: SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS

## Abstract

A mining system for directing mine operations including a flow planner and a dispatcher. The flow planner receives operating parameters and global mine data and calculates a flow plan based on the operating parameters and the global parameters. The dispatcher then determines dispatch assignments based on the flow plan from the flow planner, and effects a dispatch of mining equipment based on the dispatch assignments.

## Claims

### Claim 1

A mining system for directing mine operations, the system including:
a flow planner that receives operating parameters and global mine data and calculates a flow plan based on the operating parameters and the global parameters, wherein the flow plan is for a flow planning window of time, wherein the flow plan includes at least one planned flow rate for the flow planning window, and the at least one planned flow rate varies with time within the flow planning window; and
a dispatcher that determines dispatch assignments based on the flow plan from the flow planner, and effects a dispatch of mining equipment based on the dispatch assignments.

### Claim 2 (depends on 1)

The mining system of claim 1, wherein the operating parameters include at least one production target and at least one cost-related goal.

### Claim 3 (depends on 1)

The mining system of claim 1, wherein the global mine data includes at least one of the following mine operation data: historical data, current system operational data, asset data, and future estimates.

### Claim 4

A mining system for directing mine operations, the system including:
a planner providing operating parameters;
a data input providing global mine data;
a flow planner that:
receives the operating parameters from the planner and receives the global mine data from the data input, and
determines at least one planned flow rate by optimising a first objective function defined by at least one of each of the operating parameters and the global mine data, wherein the first objective function includes a cost function, wherein the flow planner determines the at least one planned flow rate for a flow planning window of time, and wherein the at least one planned flow rate varies with time over the flow planning window; and
a dispatcher that determines dispatch assignments based on the at least one planned flow rate from the flow planner, and effects a dispatch of equipment based on the dispatch assignments.

### Claim 5 (depends on 4)

The mining system of claim 4, wherein the cost function includes at least one of the following: equipment operating costs, equipment underutilisation costs, and plan failure costs.

### Claim 6 (depends on 4)

The mining system of claim 4, wherein the flow planner optimises the first objective function subject to at least one planned asset availability constraint.

### Claim 7 (depends on 4)

The mining system of claim 4, wherein the flow planner further smooths the at least one planned flow rate.

### Claim 8 (depends on 7)

The mining system of claim 7, wherein the flow planner smooths the at least one planned flow rate by reducing a magnitude of change in the at least one planned flow rate between successive units of time.

### Claim 9 (depends on 1)

The mining system of claim 1, wherein the operating parameters include a material flow target,
wherein the flow planner is further configured to generate the flow plan to achieve the material flow target; and
wherein the flow plan spans a predetermined period of time, and specifies a planned flow rate for each time unit within the predetermined period of time.

### Claim 10 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data;
wherein the flow planner determines the at least one planned flow rate based on at least one of each of the operating parameters and the global mine data, and
wherein the flow planner determines the at least one planned flow rate by optimising a goal defined by at least one of each of the operating parameters and the global mine data within a flow planning window of time.

### Claim 11 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data and updated global mine data;
wherein the flow planner determines the at least one planned flow rate based on at least one of each of the operating parameters and the global mine data, wherein the flow planner determines at least one updated planned flow rate based on the updated global mine data and wherein the flow planner determines the at least one updated planned flow rate over a replanning flow plan window; and
the dispatcher determines the dispatch assignments based on the at least one updated planned flow rate from the flow planner.

### Claim 12

(canceled)

### Claim 13

(canceled)

### Claim 14

(canceled)

### Claim 15

(canceled)

### Claim 16 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data;
wherein the flow planner determines the flow plan based on at least one of each of the operating parameters and the global mine data and
the dispatcher determines dispatch assignments based on the flow plan and the global mine data,
wherein the dispatcher determines the dispatch assignments so as to effect an actual flow rate that varies over time in alignment with the at least one planned flow rate that varies over time.

### Claim 17

(canceled)

### Claim 18

(canceled)

### Claim 19 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data;
wherein the flow planner determines the flow plan based on at least one of each of the operating parameters and the global mine data; and
the dispatcher determines the dispatch assignments based on the flow plan and the global mine data,
wherein the dispatcher includes a dispatcher feedback loop, and the dispatcher uses the dispatcher feedback loop to update the dispatch assignments.

### Claim 20

(canceled)

### Claim 21

(canceled)

### Claim 22

(canceled)

### Claim 23

(canceled)

### Claim 24 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data;
wherein the flow planner determines the flow plan based on at least one of the operating parameters and the global mine data; and
the dispatcher determines the dispatch assignments based on the flow plan and the global mine data,
updates the dispatch assignments at least once during the flow planning window, and
effects the dispatch of equipment based on the updated dispatch assignments so that the dispatch of equipment aligns with the flow plan.

### Claim 25

(canceled)

### Claim 26

(canceled)

### Claim 27

(canceled)

### Claim 28

(canceled)

### Claim 29 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data;
wherein the flow planner determines the flow plan based on at least one of the operating parameters and the global; and
the dispatcher determines dispatch assignments based on the flow plan and the global mine data, and effects the dispatch of equipment based on the dispatch assignments,
wherein the following conditions apply:
the flow plan includes at least one planned flow rate that varies over time within the flow planning window, and
the dispatcher effects the dispatch of equipment so as to result in a varying actual flow rate.

### Claim 30

(canceled)

### Claim 31

(canceled)

### Claim 32

(canceled)

### Claim 33

(canceled)

### Claim 34 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data;
wherein the flow planner determines the flow plan based on at least one of the operating parameters and the global mine data; and
wherein the dispatch of equipment effects an actual flow rate that is aligned with the at least one planned flow rate that varies so that the actual flow rate also varies over the flow planning window.

### Claim 35

(canceled)

### Claim 36

(canceled)

### Claim 37

(canceled)

### Claim 38

(canceled)

### Claim 39 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input that includes an estimator, wherein the estimator determines and provides future estimates, and wherein the data input provides the global mine data that includes the future estimates;
wherein the flow planner determines the flow plan based on at least one of the operating parameters and the global mine data, wherein the flow plan is determined over a flow planning horizon; and
wherein the estimator updates the future estimates at least once during the flow planning horizon.

### Claim 40

(canceled)

### Claim 41

(canceled)

### Claim 42

(canceled)

### Claim 43

(canceled)

### Claim 44

(canceled)

### Claim 45

(canceled)

### Claim 46

(canceled)

### Claim 47

(canceled)

### Claim 48 (depends on 1)

The mining system of claim 1, the system further including:
a planner providing the operating parameters;
a data input providing the global mine data and updated global mine data;
wherein the flow planner determines the flow plan for the flow planning window that ends at a flow planning horizon, wherein the flow planner determines the flow plan based on at least one of each of the operating parameters and the global mine data; and
wherein:
the flow planner receives the updated global mine data and determines an updated flow plan based on the updated global mine data,
the dispatcher determines updated dispatch assignments based on at least one of: the updated global mine data and the updated flow plan, and the dispatcher effects the dispatch of equipment based on the updated dispatch assignments, and
the dispatcher determines the updated dispatch assignments at a greater frequency during the flow planning window than the flow planner determines the updated flow plan.

### Claim 49

(canceled)

### Claim 50

(canceled)

### Claim 51

(canceled)

### Claim 52

(canceled)

### Claim 53

(canceled)

### Claim 54

(canceled)

### Claim 55

(canceled)

### Claim 56

(canceled)

### Claim 57

(canceled)

### Claim 58

(canceled)

### Claim 59

A mining system for directing operation of mining equipment within a mine operation, the system including:
a parameter module providing operating parameters;
a data input module providing global mine data and updated global mine data, wherein the updated global mine data includes a stream of sensor data;
a flow planner module that is in communication with the parameter module and the data input module to receive the operating parameters and the global mine data, and the flow planner module determining at least one planned flow rate for a flow planning window of time based on the operating parameters and the global mine data, wherein the at least one planned flow rate varies with time within the flow planning window, wherein the flow planner module determines at least one updated planned flow rate based on the updated global mine data; and
a dispatcher module that autonomously directs operation of the mining equipment based on the at least one updated planned flow rate received from the flow planner module.

### Claim 60 (depends on 7)

The mining system of claim 7, wherein the flow planner smooths the at least one planned flow rate by optimising a second objective function.

### Claim 61

(canceled)

### Claim 62

(canceled)

### Claim 63

(canceled)

### Claim 64

(canceled)

### Claim 65

(canceled)