# US 2021/0174274 A1 · Systems and methods for modeling organizational entities

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0174274 A1
- Document ID: US20210174274A1
- Status: Published application
- Kind: A1
- Application number: 16/912,743
- Filed: 2020-06-26
- Published: 2021-06-10
- Earliest claimed: 2019-12-05
- Assignees: UST Global Inc
- Applicants: UST Global Inc.
- Inventors: Ratheesh Raveendran Nair; Sathish Kumar Mohanraj; Firoz Abdul Rasheed; Anees Mytheenkutty
- Web page: https://patentgrep.com/patent/US20210174274A1

## CPC

- G06Q 10/06316: {Sequencing of tasks or work}
- G06F 18/24147: {Distances to closest patterns, e.g. nearest neighbour classification}
- G06N 5/01: Dynamic search techniques; Heuristics; Dynamic trees; Branch-and-bound
- G06N 20/00: Machine learning
- G06Q 10/0633: Workflow analysis
- G06Q 10/067: Enterprise or organisation modelling
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A system for displaying an organization model is configured to: (a) retrieve work items from storage, each work item including at least one requirement; (b) determine, for each of the work items, one or more dependencies; (c) determine a relative ranking of costs for the work items; and (d) provide, to a client device, visualization parameters for representing the work items. For a respective work item, the visualization parameters include a first visual indicator representing a type of work item, a second visual indicator representing a cost of delay associated with the work item, and a third visual indicator representing a cost of delay profile for the work item. The visualization parameters further include a fourth visual indicator for linking pairs of work items to indicate a dependency between the linked work items.

## Claims

### Claim 1

A system for displaying an organization model, the system including a non-transitory computer-readable medium storing computer-executable instructions thereon such that when the instructions are executed, the system is configured to:
retrieve work items from storage, each work item including at least one requirement;
determine, for each of the work items, one or more dependencies;
determine a relative ranking of costs for the work items; and
provide, to a client device, visualization parameters for representing the work items,
wherein for a respective work item, the visualization parameters include a first visual indicator representing a type of work item, a second visual indicator representing a cost of delay associated with the work item, and a third visual indicator representing a cost of delay profile for the work item, and
wherein the visualization parameters further include a fourth visual indicator for linking pairs of work items to indicate a dependency between the linked work items.

### Claim 2 (depends on 1)

The system of claim 1, wherein the first visual indicator is a shape object and different types of work items have different shape objects.

### Claim 3 (depends on 1)

The system of claim 1, wherein the second visual indicator is a size of the first visual indicator such that a first work object having a larger size of the first visual indicator compared to a second work object indicates that the first work object has a higher cost of delay compared to the second work object.

### Claim 4 (depends on 1)

The system of claim 1, wherein the third visual indicator is a color of the first work object such that a first work object having a different color of the first visual indicator compared to a second work object indicates that the first work object has a different cost of delay profile compared to the second work object.

### Claim 5 (depends on 1)

The system of claim 1, wherein the fourth visual indicator is a line such that first visual indicators for a first work item and a second work item have a line connecting both of the first visual indicators to represent a dependency relationship between the first work item and the second work item.

### Claim 6 (depends on 5)

The system of claim 5, wherein a thickness of the line indicates strength of dependency such that a thicker line represents a stronger dependency than a thinner line.

### Claim 7 (depends on 5)

The system of claim 5, wherein the line is directional indicating a specific direction of dependency.

### Claim 8 (depends on 1)

The system of claim 1, further configured to receive, from the client device, a change in dependency between two work items that previously had no dependency relationship.

### Claim 9 (depends on 8)

The system of claim 8, further configured to perform a risk analysis in response to the change in dependency to determine whether affected work items are at no risk or at high risk.

### Claim 10 (depends on 9)

The system of claim 9, further configured to perform the risk analysis based on five attributes including the cost of delay for a respective work item, a number of dependencies for the respective work item, a current status of the respective work item, a percentage work remaining for completing the work item, and a number of days that the work item is blocked.

### Claim 11 (depends on 10)

The system of claim 10, wherein a machine learning model taking in as input the five attributes for each work item provides an output indicating whether any of the work items are at no risk or at high risk.

### Claim 12 (depends on 11)

The system of claim 11, wherein the machine learning model is trained based on a K nearest neighbor algorithm.

### Claim 13 (depends on 1)

The system of claim 1, further configured to:
track backlogged work items;
determine, based on weighted shorted jobs first algorithm, a recommended order for tackling the backlogged work items; and
provide the recommended order to the client device.

### Claim 14

A method for displaying an organization model, comprising:
retrieving work items from storage, each work item including at least one requirement;
determining, for each of the work items, one or more dependencies;
determining a relative ranking of costs for the work items; and
providing, to a client device, visualization parameters for representing the work items,
wherein for a respective work item, the visualization parameters include a first visual indicator representing a type of work item, a second visual indicator representing a cost of delay associated with the work item, and a third visual indicator representing a cost of delay profile for the work item, and
wherein the visualization parameters further include a fourth visual indicator for linking pairs of work items to indicate a dependency between the linked work items.

### Claim 15 (depends on 14)

The method of claim 14, wherein the first visual indicator is a shape object and different types of work items have different shape objects.

### Claim 16 (depends on 14)

The method of claim 14, wherein the second visual indicator is a size of the first visual indicator such that a first work object having a larger size of the first visual indicator compared to a second work object indicates that the first work object has a higher cost of delay compared to the second work object.

### Claim 17 (depends on 14)

The method of claim 14, wherein the third visual indicator is a color of the first work object such that a first work object having a different color of the first visual indicator compared to a second work object indicates that the first work object has a different cost of delay profile compared to the second work object.

### Claim 18 (depends on 14)

The method of claim 14, wherein the fourth visual indicator is a line such that first visual indicators for a first work item and a second work item have a line connecting both of the first visual indicators to represent a dependency relationship between the first work item and the second work item.

### Claim 19 (depends on 18)

The method of claim 18, wherein a thickness of the line indicates strength of dependency such that a thicker line represents a stronger dependency than a thinner line.

### Claim 20

A client device for displaying an organization model, the client device including a non-transitory computer-readable medium storing computer-executable instructions thereon such that when the instructions are executed, the client device is configured to:
receive one or more work items from a server;
receive, from the server, visualization parameters for representing the one or more work items,
wherein for a respective work item, the visualization parameters include a first visual indicator representing a type of work item, a second visual indicator representing a cost of delay associated with the work item, and a third visual indicator representing a cost of delay profile for the work item, and
wherein the visualization parameters further include a fourth visual indicator for linking pairs of work items to indicate a dependency between the linked work items; and
displaying the work items on a screen of the client device according to the visualization parameters and one or more visualization settings, wherein the visualization settings include hiding work items of a certain type, work items of a certain cost of delay, work items of a certain cost of delay profile, or any combination thereof.