# US 2021/0173361 A1 · Load controller

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0173361 A1
- Document ID: US20210173361A1
- Status: Published application
- Kind: A1
- Application number: 17/254,518
- Filed: 2019-06-27
- Published: 2021-06-10
- Earliest claimed: 2018-06-29
- Assignees: BAE SYSTEMS plc
- Applicants: BAE Systems plc
- Inventors: Georgios Alexandros Amarantidis-Koronaios; Ian Roger Harrington; Roger Dixon
- Web page: https://patentgrep.com/patent/US20210173361A1

## CPC

- G05B 13/04: involving the use of models or simulators
- G05B 13/048: {using a predictor}
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

There is provided a load controller for a system, the system comprising a first sub-system arranged to deliver a first load, the load controller being operable to: acquire a first target load profile, being the load initially desired for delivery by the first sub-system over an operational period; measure in real time during an update window within the operational period: a first parameter of the first sub-system, to obtain a first measured Load Controller monitor signal; and the first load, to obtain a first measured load signal; develop in real time a model of the first sub-system, using the first measured monitor signal and the first measured load signal, the model relating the first load to the first parameter; given the first target load profile, and the model of the first sub-system, generate for a future period a first predicted monitor signal, the future period being ahead of the update window; and determine whether the first predicted monitor signal satisfies at least one predetermined criterion.

## Claims

### Claim 1

A load controller for a system, the system comprising a first sub-system arranged to deliver a first load, the load controller being operable to:
acquire a first target load profile, being the load initially desired for delivery by the first sub-system over an operational period;
measure in real time during an update window within the operational period:
a first parameter of the first sub-system, to obtain a first measured monitor signal; and
a first signal of the first load, to obtain a first measured load signal;
develop in real time a first model of the first sub-system, using the first measured monitor signal and the first measured load signal, the first model relating the first load to the first parameter;
according to the first target load profile, and the first model of the first sub-system, generate for a first future period a first predicted monitor signal, the first future period being ahead of the update window; and
determine whether the first predicted monitor signal satisfies at least one predetermined first criterion.

### Claim 2 (depends on 1)

The load controller according to claim 1, wherein the load controller is further operable to:
recognise that the first predicted monitor signal is incompatible with the predetermined criterion; and
determine at the first processing module an updated load profile for the first sub-system such that the first predicted monitor signal satisfies the predetermined criterion.

### Claim 3 (depends on 1)

The load controller according to claim 1, wherein the system further comprises a second sub-system for delivering a further load, the load controller being further operable to:
acquire a further target load profile, being the load initially desired for delivery by the second sub-system over the operational period;
measure in real time during an update window within the operational period:
a second parameter of the second sub-system,
a second measured monitor signal; and
a second measured load signal of the second load;
develop in real time a second model of the second sub-system, according to the second measured monitor signal and the second measured load signal, the second model relating the second load to the second parameter;
according to the second target load profile, and the second model, generate for the further a second future period a second predicted monitor signal, the second future period being ahead of the update window; and
determine whether the second predicted monitor signal satisfies at least one further predetermined second criterion.

### Claim 4 (depends on 3)

The load controller according to claim 3, wherein the load controller is further operable to
determine a first updated load profile for the first sub-system by comparing the first predicted monitor signal to the predetermined first criterion to determine a first suggested load profile, the first suggested load profile being the first target load profile confirmed as, or adapted for, satisfying the predetermined first criterion;
and
determine a second updated load profile for the second sub-system by comparing the second predicted monitor signal to the predetermined second criterion to determine a second suggested load profile, the second suggested load profile being the second target load profile confirmed as, or adapted for, satisfying the predetermined second criterion.

### Claim 5 (depends on 4)

The load controller according to claim 4 further comprising a load allocator, the load allocator being configured to:
acquire an overall target load profile for the system;
receive the first and second suggested load profiles;
determine whether the combination of the first and second suggested load profiles meets the overall target load profile and
output the updated load profiles for the first and second sub-systems.

### Claim 6 (depends on 5)

The load controller according to claim 5, wherein the load controller is further operable to, in the event that the first and second suggested load profiles do not fulfil the overall target load profile:
determine a margin of compliance with the predetermined criterion for each of the first and second suggested load profiles;
identify any suggested load profile with an excess of compliance; compensate by adapting the excessively compliant suggested load profile to tend to fulfil the overall target load profile; and
output the adapted suggested load profile as the updated load profile.

### Claim 7 (depends on 6)

The load controller according to claim 6 wherein the load allocator is further operable to issue an alert when it detects that:
the overall target load profile cannot be achieved from the suggested load profiles; and
there is insufficient excess of compliance between the suggested load profiles to compensate therefor.

### Claim 8 (depends on 1)

The load controller according to claim 1, wherein the predetermined first criterion is a maximum threshold.

### Claim 9 (depends on 8)

The load controller according to claim 8 wherein the maximum threshold is based on a defined maximum monitor signal, and wherein to determine whether the first target load profile satisfies the first criterion, the controller is further operable to apply the defined maximum monitor signal to the first model of the first sub-system to obtain a corresponding maximum measured load signal, and compare the maximum measured load signal to a further portion of the target load profile.

### Claim 10 (depends on 3)

The load controller according to claim 3, wherein at each of the first and second sub-systems the same parameter is monitored.

### Claim 11 (depends on 1)

The load controller according to claim 1, wherein the load controller is provided with an initial model of the first sub-system, the initial model being generated from preliminary test data, and wherein the load controller is configured to develop the first model of the first sub-system, by adapting the initial model.

### Claim 12 (depends on 1)

The load controller according to claim 1, wherein the load controller is further configured to:
develop the first model repeatedly during the first operational period by measuring the first parameter during a plurality of incrementally advancing update windows; and
for each of the incrementally advancing update windows, generate generating for an associated future period a predicted monitor signal.

### Claim 13 (depends on 1)

The load controller according to claim 1, wherein the first sub-system is an electrical device and the first parameter is a temperature of the first sub-system.

### Claim 14 (depends on 1)

The load controller according to claim 1, wherein the first subsystem is an electrical generator and the first load is an output current for driving a load device.

### Claim 15

A method of controlling a load at a system, the system comprising a first sub-system for delivering a first load in response to a first input signal, the method comprising:
acquiring a first target load profile, said first target load being a load that is initially desired for delivery by the first sub-system over an operational period;
measuring in real time during an update window within the operational period:
a first parameter of the first sub-system, to obtain a first measured monitor signal; and
a signal of the first load, to obtain a first measured load signal;
developing in real time a model of the first sub-system, using the first measured monitor signal and the first measured load signal, the model relating the first load to the first parameter;
according to the first target load profile and the model of the first sub-system, generating for a future period a first predicted monitor signal, the future period being ahead of the update window; and
determining whether the first predicted monitor signal satisfies at least one predetermined criterion.