# US 2021/0172986 A1 · Wireless synchronized measurements in power distribution networks

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0172986 A1
- Document ID: US20210172986A1
- Status: Published application
- Kind: A1
- Application number: 17/112,548
- Filed: 2020-12-04
- Published: 2021-06-10
- Earliest claimed: 2019-12-05
- Assignees: Aclara Technologies LLC
- Applicants: Aclara Technologies LLC
- Inventors: David Rieken; Roger Smith
- Web page: https://patentgrep.com/patent/US20210172986A1

## CPC

- G01R 25/00: Arrangements for measuring phase angle between a voltage and a current or between voltages or currents
- G01R 21/133: by using digital technique
- H04B 3/54: Systems for transmission via power distribution lines
- H04W 84/18: Self-organising networks, e.g. ad-hoc networks or sensor networks
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H04B: TRANSMISSION
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

A system for determining a phase of a power supply coupled to a metering device. The system includes a collection device in electronic communication with a metering device connected to a power distribution network and having a memory and one or more electronic processors. The electronic processors are configured to receive a first beacon signal and measure a phasor in response to receiving the first beacon signal. The phasor is stored in the memory along with an identification value associated with the device that transmitted the first beacon signal and a first time. The electronic processors receive a second beacon signal, and extract data from the request message. The electronic processors determine whether the extracted time matches the first time and based on determining that the extracted time matches the first time stored in the memory, calculate a phase by comparing the reference phasor data to the stored phasor.

## Claims

### Claim 1

A system for determining a phase of a power source coupled to a metering device, the system comprising:
a first collection device in electronic communication with the metering device and having a memory and one or more electronic processors configured to:
receive a first beacon signal;
measure a phasor of a power source coupled to the metering device in response to receiving the first beacon signal;
store the measured phasor, an identification value associated with the device that transmitted the first beacon signal, and a first time in the memory;
receive a second beacon signal, the second beacon signal comprising a request message;
extract data from the request message, wherein the extracted data includes a time data value and a reference phasor value;
determine whether the extracted time data value matches the first time stored in the memory; and
based on determining that the extracted time matches the first time stored in the memory, calculate a phase by comparing the reference phasor value to the stored measured phasor.

### Claim 2 (depends on 1)

The system of claim 1, further comprising:
a data collection unit, the data collection unit comprising a memory and one or more processors, the one or more processors configured to:
transmit the first beacon signal;
receive a beacon response signal from a reference collection device and extract the reference phasor value from the received beacon response; and
transmit the second beacon signal comprising the request message.

### Claim 3 (depends on 2)

The system of claim 2, wherein the extracted time data value includes a time that the data collection unit transmitted the first beacon signal.

### Claim 4 (depends on 2)

The system of claim 2, wherein the beacon is transmitted using a wireless communication protocol.

### Claim 5 (depends on 4)

The system of claim 4, wherein the wireless communication protocol is an RF communication protocol.

### Claim 6 (depends on 1)

The system of claim 1, wherein the first time is the time the first beacon was received at the first collection device.

### Claim 7 (depends on 1)

The system of claim 1, wherein the request message further comprises a second identification value of the device that transmitted the second beacon signal.

### Claim 8 (depends on 1)

The system of claim 1, wherein the one or more electronic processors are configured to calculate the phase by determining whether a phase angle difference between the reference phasor value and the stored phasor exceeds a predetermined threshold.

### Claim 9 (depends on 8)

The system of claim 8, wherein the predetermined threshold is plus/minus 30 degrees.

### Claim 10

A system for determining a phase of a power supply coupled to a metering device connected to a power distribution network, the system comprising:
a plurality of collection devices, each of the collection devices in electronic communication with a metering device connected to a power distribution network and having a memory and one or more electronic processors configured to:
receive a first beacon signal;
measure a phasor based on receiving the first beacon signal;
store the phasor in the memory along with an identification value associated with the device that transmitted the first beacon signal and a first time;
receive a second beacon signal, the second beacon signal comprising a request message;
extract data from the request message, wherein the extracted data includes a time data value;
determine if the extracted time matches the first time stored in the memory; and
based on determining that the extracted time matches the first time stored in the memory, transmit a response data packet comprising the stored phasor, the stored identification value, and the first time to a data collection unit.

### Claim 11 (depends on 10)

The system of claim 10, further comprising:
a data collection unit, comprising a memory and one or more processors, wherein the one or more processors are configured to:
transmit the first beacon signal;
transmit the second beacon signal and the request message;
receive the response data packet; and
transmit the response data packet to a host device.

### Claim 12 (depends on 11)

The system of claim 11, wherein the host device is a server based computing system.

### Claim 13 (depends on 10)

The system of claim 10, wherein the extracted time data value includes a time that the data collection unit transmitted the first beacon signal.

### Claim 14 (depends on 10)

The system of claim 10, wherein the first time is the time the first beacon was received at the collection devices.

### Claim 15 (depends on 10)

The system of claim 10, wherein the request message further comprises a second identification value associated with the device that transmitted the second beacon signal.

### Claim 16

A method for determining a phase of a power supply coupled to a metering device, wherein a first collection device is in electronic communication with the metering device, and incudes a memory and one or more electronic processors, the method comprising:
receiving a first beacon signal at the first collection device;
measuring, via the collection device, a phasor of a power signal at the metering device in response to receiving the first beacon signal;
storing the measured phasor, a first time, and an identification value associated with the device that transmitted the first beacon signal in the memory;
receiving a second beacon signal at the first collection device;
extracting data from the request message by the first collection device, wherein the extracted data includes a time data value and a reference phasor value;
determining, by the first collection device, whether the extracted time data value matches the first time stored in the memory; and
calculating, by the first collection device, the phase of the power line connected to the metering device by comparing the reference phasor data to the stored measured phasor.

### Claim 17 (depends on 16)

The method of claim 16, further comprising:
transmitting the first beacon signal by a data collection unit;
receiving, at the data collection unit, a beacon response signal from a reference collection device and extracting the reference phasor value from the received beacon response; and
transmitting the second beacon signal, wherein the second beacon signal includes the request message.

### Claim 18 (depends on 17)

The method of claim 17, wherein the extracted time data value includes a time that the data collection unit transmitted the first beacon signal.

### Claim 19 (depends on 16)

The method of claim 16, wherein the first time is the time the first beacon was received at the first collection device.

### Claim 20 (depends on 16)

The method of claim 16, wherein the request message further comprises a second identification value of the device that transmitted the second beacon signal.
