- Number: US 2021/0172858 A1
- Document ID: US20210172858A1
- Status: Published application
- Kind: A1
- Application number: 17/181,502
- Filed: 2021-02-22
- Published: 2021-06-10
- Earliest claimed: 2011-05-04
- Assignees: Quanta Associates, L.P.
- Applicants: Quanta Associates, L.P.
- Inventors: Mark A. Gluskin; Kevin C. Garrity; Christopher M. Warner; Alan Eastman; Mark Reiboldt
- Web page: https://patentgrep.com/patent/US20210172858A1

## CPC

- G01N 17/02: Electrochemical measuring systems for weathering, corrosion or corrosion-protection measurement
- F16L 58/00: Protection of pipes or pipe fittings against corrosion or incrustation (compound tubes F16L9/14)
- F17D 3/01: for controlling, signalling, or supervising the conveyance of a product
- F17D 5/00: Protection or supervision of installations (arrangements for protecting foundations E02D31/00; protecting pipes from damage or internal or external wear F16L57/00, against corrosion and scale F16L58/00; investigation of the fluid-tightness of structures G01M3/00)
- F17D 5/06: using electric or acoustic means
- G01N 17/00: Investigating resistance of materials to the weather, to corrosion, or to light
- G06Q 10/20: Administration of product repair or maintenance
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F17D: PIPE-LINE SYSTEMS; PIPE-LINES (pumps or compressors F04; fluid dynamics F15D; valves or the like F16K; pipes, laying pipes, supports, joints, branches, repairing, work on the entire line, accessories F16L; steam traps or the like F16T; fluid-pressure electric cables H01B9/06)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The disclosure relates to systems, methods and apparatus for analyzing an infrastructure system including measurement of a parameter associated with the infrastructure system, electronically recording the measured parameter as a data, transferring the data to an infrastructure unit which may be remote from the infrastructure system, analyzing the data to generate a risk model, and predicting a characteristic of the infrastructure system according to the risk. An implementation plan may be generated, and/or maintenance services may be performed as per the characteristic that is predicted.

## Claims

### Claim 1

An infrastructure analysis system, comprising:
a power infrastructure comprising:
at least one transmission line; and
at least one transmission tower configured to support the transmission line;
at least one data collection tool configured to collect data from the power infrastructure;
an infrastructure unit configured to receive data from the data collection tool;
wherein the infrastructure unit further comprises:
a data collection unit configured to receive data regarding the power infrastructure and its environment from the data collection tool; and
an implementation unit configured to assess the relative risk to the power infrastructure and create an implementation plan
for remediation of the power infrastructure.

### Claim 2 (depends on 1)

The infrastructure analysis system of claim 1, further comprising at least one data input device configured to collect data from the data collection tool.

### Claim 3 (depends on 2)

The infrastructure analysis system of claim 2, wherein the data input device includes at least a portion of the infrastructure unit.

### Claim 4 (depends on 1)

The infrastructure analysis system of claim 1, wherein the at least one data collection tool comprises a tool selected from the group of tools consisting of a global position indication device, a surveying device, a soil tester, a tool for measuring an electrochemical potential of a structure, a tool for measuring corrosion of metal, a corrosion rate measuring tool, a length of a corroded section measuring tool, a pit depth measuring device, a coating measurement device, a soil acidity measuring tool, a soil oxidation-reduction measuring tool, a soil resistivity measuring tool, a water pH tester, a nondestructive examination of a structure, and a means for transducing a visual inspection.

### Claim 5 (depends on 4)

The infrastructure analysis system of claim 4, wherein said means for transducing said visual inspection comprises a visual image tool, and a tool for measuring visual corrosion area pattern data.

### Claim 6 (depends on 1)

The infrastructure analysis system of claim 1, wherein the infrastructure unit further comprises:
a risk analysis unit configured to evaluate a degradation condition of each of the transmission towers based on the received data;
a comparative analysis unit configured to compare the degradation condition at each of the transmission towers to determine a relative comparative risk of each of the transmission towers; and
a predictive analysis unit configured to determine a future performance of the transmission towers.

### Claim 7

An infrastructure unit configured to develop an implementation plan for maintaining the integrity of a power infrastructure having a plurality of transmission towers, comprising:
a data collection unit configured to receive data regarding the power infrastructure from at least one data collection tool;
a risk analysis unit configured to evaluate a degradation condition of each of the transmission towers based on the received data;
a comparative analysis unit configured to compare the degradation condition at each of the transmission towers to determine a relative comparative risk of each of the transmission towers;
a predictive analysis unit configured to determine a future performance of the transmission towers; and
an implementation unit configured to create an implementation plan for maintenance of the power infrastructure.

### Claim 8 (depends on 7)

The infrastructure unit of claim 7, further comprising a relative analysis unit configured to determine a current status and a future status of each of the transmission towers.

### Claim 9 (depends on 7)

The infrastructure unit of claim 7, wherein the implementation plan is a maintenance schedule for each of the plurality of transmission towers.

### Claim 10 (depends on 7)

The infrastructure unit of claim 7, wherein said at least one data collection tool comprises a global position indication device, a surveying device, a soil tester, a tool for measuring an electrochemical potential of a structure, a tool for measuring corrosion of metal, a corrosion rate measuring tool, a length of a corroded section measuring tool, a pit depth measuring device, a coating measurement device, a soil acidity measuring tool, a soil oxidation-reduction measuring tool, a soil resistivity measuring tool, a water pH tester, a nondestructive examination of a structure, and a means for transducing a visual inspection.

### Claim 11 (depends on 10)

The infrastructure unit of claim 10, wherein said means for transducing said visual inspection comprises a visual image tool, and a tool for measuring visual corrosion area pattern data.

### Claim 12

A method for repairing a power infrastructure having at least one transmission tower and at least one transmission line, the method comprising:
gathering data regarding the power infrastructure using at least one data collection tool;
inputting the data into an infrastructure unit;
comparing the data in the infrastructure unit to determine a degradation condition of each transmission tower;
providing an implementation plan based on the degradation condition; and
executing the implementation plan for repairing the degradation condition in the power infrastructure.

### Claim 13 (depends on 12)

The method according to claim 12, further including electronically storing all data gathered from the power infrastructure for accessing and manipulating the data at a future point in time.

### Claim 14 (depends on 12)

The method according to claim 12, wherein said step of gathering data regarding the pipeline infrastructure using said at least one data collection tool comprises measuring a global position indication, with a structural survey tool, with a soil tester, an electrochemical potential of a structure, a level of corrosion of a metal, measuring a corrosion rate, a length of a corroded section, a pit depth, a coating thickness, a level of soil acidity, a level of soil oxidation-reduction, a level of soil resistivity, a water pH, a nondestructive examination of a structure, and a means for transducing a visual inspection.

### Claim 15 (depends on 14)

The method according to claim 14, wherein said means for transducing said visual inspection comprises a visual image tool, and a tool for measuring visual corrosion area pattern data.

### Claim 16

A method for repairing a pipeline infrastructure having at least one pipeline, the method comprising:
gathering data regarding the pipeline infrastructure using at least one data collection tool;
inputting the data into an infrastructure unit;
comparing the data in the infrastructure unit to determine a damaged portion of the pipeline;
providing an implementation plan based on the damaged portion; and
executing the implementation plan for repairing the damaged portion in the pipeline infrastructure.

### Claim 17 (depends on 16)

The method according to claim 16, further including electronically storing all data gathered from the pipeline infrastructure for accessing and manipulating the data at a future point in time.

### Claim 18 (depends on 16)

The method according to claim 16, wherein said step of gathering data regarding the pipeline infrastructure using said at least one data collection tool comprises measuring a global position indication, with a structural survey tool, with a soil tester, an electrochemical potential of a structure, a level of corrosion of a metal, measuring a corrosion rate, a length of a corroded section, a pit depth, a coating thickness, a level of soil acidity, a level of soil oxidation-reduction, a level of soil resistivity, a water pH, a nondestructive examination of a structure, and a means for transducing a visual inspection.

### Claim 19 (depends on 18)

The method according to claim 18, wherein said means for transducing said visual inspection comprises a visual image tool, and a tool for measuring visual corrosion area pattern data.