# US 2021/0172420 A1 · Method for controlling a wind power installation or a wind farm

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0172420 A1
- Document ID: US20210172420A1
- Status: Published application
- Kind: A1
- Application number: 17/108,849
- Filed: 2020-12-01
- Published: 2021-06-10
- Earliest claimed: 2019-12-05
- Assignees: Wobben Properties GmbH
- Applicants: Wobben Properties GmbH
- Inventors: Johannes Brombach
- Web page: https://patentgrep.com/patent/US20210172420A1

## CPC

- F03D 7/0284: {in relation to the state of the electric grid}
- F03D 7/048: {controlling wind farms}
- F03D 9/257: {the wind motor being part of a wind farm}
- G06Q 50/06: Energy or water supply
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/1814: having reactive elements actively controlled by bridge converters, e.g. unified power flow controllers [UPFC] or controlled series voltage compensators
- H02J 3/381: {Dispersed generators}
- H02J 3/466: Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
- H02J 13/10: characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
- F03D 7/0264: {for stopping; controlling in emergency situations (orientating out of wind F03D7/0208)}
- F05B 2260/96: Preventing, counteracting or reducing vibration or noise
- G05B 2219/2203: Grid, array of controllers
- G05B 2219/2619: Wind turbines
- H02J 2101/28: Wind energy
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/76: Power conversion electric or electronic aspects
- F03D: WIND MOTORS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A control system of a wind power installation and/or a wind farm is provided. The control system has a plurality of operating modes and has an interface. The interface is configured for providing maximum adjustability of the wind power installation and/or the wind farm in critical power grid situations. The interface is configured to receive a signal of a power grid operator, as a result of which all of the plurality of operating modes are released and made available to the power grid operator.

## Claims

### Claim 1

A control system of a wind power installation or a wind farm, comprising:
a first interface configured to receive a first signal from a power grid operator,
wherein:
the control system is configured to enable adjustment of the wind power installation or the wind farm in critical power grid situations, and
the control system is configured to, in response to receiving the first signal, release a plurality of operating modes of the control system and make the plurality of operating modes available to the power grid operator.

### Claim 2 (depends on 1)

The control system as claimed in claim 1, comprising:
one or more second interfaces configured to receive a second signal from a third party.

### Claim 3 (depends on 2)

The control system as claimed in claim 2, wherein the control system is configured to assign a highest priority to the power grid operator within the control system when the first signal is received from the power grid operator over the first interface.

### Claim 4 (depends on 2)

The control system as claimed in claim 2, wherein the third party is a wind power installation operator and the control system is configured to deactivate the one or more second interfaces when the first signal is received from the power grid operator via the first interface.

### Claim 5 (depends on 2)

The control system as claimed in claim 2, wherein the one or more second interfaces are configured to enable at least one of the following open-loop and/or closed-loop control methods:
reactive power control;
voltage control;
active power control;
direct current marketing;
minute reserve;
secondary reserve;
temperature control;
Cos-phi control;
Q(V) control;
shadowing control; and
bat control.

### Claim 6 (depends on 1)

The control system as claimed in claim 1, comprising:
a database configured to log access of the power grid operator to the wind power installation and/or the wind farm is logged.

### Claim 7 (depends on 1)

The control system as claimed in claim 1, wherein:
the control system has at least one safe operating mode,
the at least one safe operating mode is deactivated,
the at least one safe operating mode is only capable of being activated by the power grid operator and over the first interface.

### Claim 8 (depends on 7)

The control system as claimed in claim 7, wherein the safe operating mode includes at least one function from a list of:
inertia emulation;
primary control power;
Q(V) control with maximum adjustment range; and
breakdown control.

### Claim 9 (depends on 1)

The control system as claimed in claim 1, wherein the control system has at least one operating mode that is activated and is only capable of being deactivated by the power grid operator over the first interface.

### Claim 10 (depends on 9)

The control system as claimed in claim 9, wherein the at least one operating mode includes at least one function from a list of:
noise-reduction operating mode; and
night operation mode.

### Claim 11 (depends on 1)

The control system as claimed in claim 1, wherein the plurality of operating modes comprises at least one mode from a list of operating modes including:
a power grid recovery mode that is activated in response to receiving the first signal from the power grid operator over the first interface;
a STATCOM mode that is activated in response to receiving the first signal from the power grid operator over the first interface;
a noise-reduction mode that is deactivated in response to receiving the first signal from the power grid operator over the first interface; and
a bat-detection mode that is deactivated in response to receiving the first signal from the power grid operator over the first interface.

### Claim 12 (depends on 1)

The control system as claimed claim 1, wherein the control system is a control system of the wind power installation.

### Claim 13 (depends on 1)

The control system as claimed claim 1, wherein the control system is a control system of the wind farm.

### Claim 14

A method for controlling a wind power installation and/or a wind farm, comprising:
receiving, by a control system of the wind power installation and/or the wind farm, a first signal;
determining whether the first signal is from a power grid operator and releases and makes available to the power grid operator all of a plurality of operating modes of the wind power installation and/or the windfarm; and
in response to determining that the first signal is from the power grid operator and releases and makes available to the power grid operator all of a plurality of operating modes of the wind power installation and/or the windfarm, releasing the plurality of operating modes of the wind power installation and/or the windfarm to the power grid operator.

### Claim 15 (depends on 14)

The method as claimed in claim 14, comprising:
logging the releasing of the plurality of operating modes to the power grid operator.

### Claim 16 (depends on 14)

The method as claimed in claim 14, wherein determining the first signal is from the power grid operator and releases and makes available all of the plurality of operating modes of the wind power installation and/or the wind farm to the power grid operator includes:
comparing the first signal with signals stored in a database.

### Claim 17 (depends on 14)

The method as claimed in claim 14, comprising:
controlling the wind power installation and/or the wind farm by the power grid operator.
