# US 2021/0171362 A1 · Predictive Tool for Monitoring RO and NF Membranes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0171362 A1
- Document ID: US20210171362A1
- Status: Published application
- Kind: A1
- Application number: 15/734,419
- Filed: 2019-06-06
- Published: 2021-06-10
- Earliest claimed: 2018-06-08
- Assignees: BP Exploration Operating Company Limited
- Applicants: BP Exploration Operating Company Limited
- Inventors: George Leslie Cunningham
- Web page: https://patentgrep.com/patent/US20210171362A1

## CPC

- C02F 1/008: {Control or steering systems not provided for elsewhere in subclass C02F}
- B01D 61/025: {Reverse osmosis; Hyperfiltration}
- B01D 61/027: {Nanofiltration}
- B01D 61/029: {Multistep processes comprising different kinds of membrane processes selected from reverse osmosis, hyperfiltration or nanofiltration}
- B01D 61/12: Controlling or regulating
- B01D 61/145: {Ultrafiltration}
- B01D 61/146: {comprising multiple ultrafiltration steps}
- B01D 61/149: {Multistep processes comprising different kinds of membrane processes selected from ultrafiltration or microfiltration}
- B01D 61/22: Controlling or regulating
- B01D 61/58: Multistep processes
- B01D 65/02: Membrane cleaning or sterilisation {; Membrane regeneration}
- B01D 65/109: {Testing of membrane fouling or clogging, e.g. amount or affinity}
- C02F 9/00: Multistage treatment of water, waste water or sewage
- B01D 2311/10: Temperature control
- B01D 2311/14: Pressure control
- B01D 2311/16: Flow or flux control
- B01D 2311/246: Concentration control
- B01D 2313/70: Control means using a programmable logic controller [PLC] or a computer
- B01D 2313/701: comprising a software program or a logic diagram
- B01D 2313/702: comprising telecommunication features, e.g. modems or antennas
- B01D 2321/04: Backflushing
- B01D 2321/16: Use of chemical agents
- B01D 2321/40: Automatic control of cleaning processes
- C02F 1/441: {by reverse osmosis}
- C02F 1/442: {by nanofiltration}
- C02F 1/444: {by ultrafiltration or microfiltration}
- C02F 5/00: Softening water; Preventing scale; Adding scale preventatives or scale removers to water, e.g. adding sequestering agents (softening using ion-exchange C02F1/42)
- C02F 2103/08: Seawater, e.g. for desalination
- C02F 2209/001: Upstream control, i.e. monitoring for predictive control
- C02F 2209/008: comprising telecommunication features, e.g. modems or antennas
- C02F 2209/02: Temperature
- C02F 2209/03: Pressure
- C02F 2209/05: Conductivity or salinity
- C02F 2209/10: Solids, e.g. total solids [TS], total suspended solids [TSS] or volatile solids [VS]
- C02F 2209/40: Liquid flow rate
- C02F 2303/16: Regeneration of sorbents, filters
- C02F 2303/20: Prevention of biofouling
- C02F 2303/22: Eliminating or preventing deposits, scale removal, scale prevention (C02F1/042, C02F1/4602, C02F5/00 take precedence)
- Y02A 20/131: Reverse-osmosis
- C02F: TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE (separation in general B01D; special arrangements on waterborne vessels of installations for treating water, waste water or sewage, e.g. for producing fresh water, B63J; adding materials to water to prevent corrosion C23F; treating radioactively-contaminated liquids G21F9/04; regeneration of reactants for recirculation into processes, see the relevant places for the processes)
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

A predictive system for monitoring fouling of membranes of a desalination or water softening plant includes ultrafiltration (UF) membranes, reverse osmosis (RO) membranes, and/or nanofiltration (NF) membranes. In addition, the system includes one or more UF skids including a plurality of UF units. Each UF unit contains therein a plurality of UF membranes. Further, the system includes one or more RO/NF skids including one or more RO/NF arrays. Each of the one or more RO/NF arrays includes a plurality of RO units, with each RO unit containing therein a plurality of RO membranes, a plurality of NF units, with each NF unit containing therein a plurality of NF membranes, or a combination thereof. Still further, the system includes UF sensors and/or RO/NF sensors. The system also includes a controller comprising a processor in signal communication with the UF sensors and/or the RO/NF sensors.

## Claims

### Claim 1

A predictive system for monitoring fouling of membranes of a desalination or water softening plant comprising ultrafiltration (UF) membranes, reverse osmosis (RO) membranes, nanofiltration (NF) membranes, or a combination thereof, the system comprising:
one or more UF skids comprising a plurality of UF units, each UF unit containing therein a plurality of UF membranes;
one or more RO/NF skids comprising one or more RO/NF arrays, wherein each of the one or more RO/NF arrays comprises:
a plurality of RO units, with each RO unit containing therein a plurality of RO membranes,
a plurality of NF units, with each NF unit containing therein a plurality of NF membranes, or
a combination thereof;
UF sensors configured to measure one or more of inlet temperature, inlet pressure, outlet pressure, flow rate, or a combination thereof for each of the one or more UF skids;
RO/NF sensors configured to measure inlet temperature, feed pressure, outlet pressure, feed flow rate, permeate flow rate, total dissolved solids (TDS) in the permeate stream, or a combination thereof for each of the one or more RO/NF arrays; or
a combination thereof; and
a controller comprising a processor in signal communication with the UF sensors, the RO/NF sensors, or a combination thereof, wherein the controller is configured to:
receive data from one or more of the UF sensors, the RO/NF sensors, or both;
calculate, utilizing the data from one or more of the UF sensors, for each of the one or more UF skids, one or more UF parameters;
compare each of the one or more UF parameters to a first performance threshold, wherein the first performance threshold indicates a time at which a cleaning in place (CIP) of a UF skid is to be performed;
predict an estimated time until which the one or more UF parameters will reach the first performance threshold;
calculate, utilizing the data from one or more of the RO/NF sensors, one or more RO/NF parameters;
compare each of the one or more RO/NF parameters to a second performance threshold, wherein the second performance threshold indicates a time at which a cleaning in place (CIP) of an RO/NF skid is to be performed; and
predict an estimated time until which the one or more RO/NF parameters will reach the second performance threshold.

### Claim 2 (depends on 1)

The system of claim 1, wherein the controller further comprises a display, a network interface, or both, and wherein the processor is configured to produce an output for at least one of the one or more UF parameters, the one or more RO/NF parameters, or a combination thereof, an email alert indicating that at least one of the one or more UF parameters, the one or more RO/NF parameters, or a combination thereof has reached or exceeded an alert level, or both.

### Claim 3 (depends on 2)

The system of claim 2, wherein the controller is further configured to: provide a continuous display of the displayed parameter.

### Claim 4 (depends on 3)

The system of claim 3, wherein the controller is configured to provide a first alert display when the value of a displayed parameter is greater than a threshold level, but less than or equal to the alert level therefore.

### Claim 5 (depends on 1)

The system of claim 1, wherein the controller is configured to calculate a rate of fouling based on at least one of each of the one or more parameters or an average change in that parameter over a rate of fouling time period, and wherein the controller is configured to predict an estimated time until a skid will reach a performance threshold for that parameter by dividing a difference between the current value of that parameter and a threshold value for that parameter by the average change in that parameter over the rate of fouling time period.

### Claim 6 (depends on 5)

The system of claim 5, wherein the rate of fouling comprises a differential pressure (DP) rate of fouling calculated based on an average increase in normalized DP over a rate of fouling time period, and wherein the time until a DP performance threshold is reached is estimated by dividing a difference between the current DP and a threshold DP by the average DP rate of fouling.

### Claim 7 (depends on 1)

The system of claim 1, wherein the controller is further configured to monitor a trend in the one or more UF parameters, the one or more RO/NF parameters, or a combination thereof, and compare the monitored trend with data in a memory thereof to produce an output indicating a potential cause of the membrane fouling.

### Claim 8 (depends on 1)

The system of claim 1, wherein the controller is further configured to provide a suggested schedule for performing CIPs on one or more of the UF skids, one or more of the RO/NF skids, or a combination thereof, wherein the suggested schedule for performing CIPs is based on data inputted into a memory thereof regarding an estimated duration for a UF CIP and/or an RO/NF CIP, the availability of one or more CIP skids, a production requirement for water from the desalination or water softening system, the predicted time until which a cleaning of each of the one or more of the UF skids, the one or more of the RO/NF skids, or a combination thereof.

### Claim 9 (depends on 1)

The system of claim 1,
wherein the one or more UF parameters are selected from: a normalized feed flow rate, a normalized transmembrane pressure (TMP), a highest normalized TMP in a TMP reference time period, a skid flux, a specific skid flux calculated as the flow rate per surface area divided by the TMP, a temperature corrected specific flux (TCSF), a lowest specific flux in a lowest flux reference time period, a backwash (BW) frequency, a CEB frequency, a TMP increase after a routinely scheduled chemically enhanced backwash (CEB), a number of CIPs in a CIP reference time period, a volume of liquid introduced into a UF skid during a BW or CEB, a BW duration, a pressure decay rate (PDR), a pressurization rate, or a combination thereof;
wherein the one or more RO/NF parameters are selected from: a normalized feed pressure for each of the one or more RO/NF arrays, a normalized feed flow rate for each of the one or more RO/NF arrays, a normalized differential pressure (DP) for each of the one or more RO/NF arrays, a net driving pressure (NDP, which equals the feed pressure minus an osmotic pressure and a permeate back pressure) for each of the one or more RO/NF arrays, a recovery ratio equal to the permeate flow rate divided by the feed flow rate for each of the one or more RO/NF arrays, an average TDS in the permeate from each of the one or more RO/NF arrays, a normalized salt passage (SP) for each of the one or more RO/NF arrays, a normalized permeate flow rate for each of the one or more RO/NF arrays, a rate of fouling for each of the one or more RO/NF arrays, a CIP cleaning frequency for each of the RO/NF skids, a TDS skid discrepancy which is the difference of an outlet TDS of an RO/NF skid from an outlet TDS of one or more of the other RO/NF skids, or a combination thereof;
or a combination thereof.

### Claim 10 (depends on 9)

The system of claim 9, wherein the one or more UF parameters comprise the lowest specific flux in the lowest flux reference time period, and wherein the lowest specific flux reference time period is 24 hours, wherein the TMP reference time period is 24 hours, wherein a routinely scheduled CEB is a daily CEB, wherein a CIP reference time period is three months, or a combination thereof.

### Claim 11 (depends on 9)

The system of claim 9, wherein the one or more UF parameters comprise the lowest specific flux, the volume of liquid introduced into a UF skid during a BW or CEB, the BW frequency, or a combination thereof.

### Claim 12 (depends on 9)

The system of claim 9, wherein the one or more RO/NF parameters are selected from the rate of fouling, the CIP cleaning frequency, the TDS skid discrepancy, or a combination thereof.

### Claim 13 (depends on 9)

The system of claim 9, wherein the normalized feed flow rate is normalized against a reference temperature and/or net driving pressure, wherein the normalized feed pressure is the feed pressure normalized against a reference flow rate, wherein the normalized SP is the SP normalized to a reference flow rate and reference temperature, wherein the normalized TMP is the TMP normalized against a reference flow rate, wherein the normalized DP is the DP normalized against a reference temperature and reference flow rate, wherein the normalized permeate flow rate is the permeate flow rate normalized against reference temperature and reference NDP, or a combination thereof, and wherein the reference temperature, the reference flow rate, the reference net driving pressure, or a combination are those values on a first day of operation.

### Claim 14 (depends on 9)

The system of claim 9, wherein the CEB frequency comprises the number of CEBs in 7 days, wherein the CIP cleaning frequency for each of the RO/NF skids comprises the number of CIP cleans per year, wherein the BW frequency comprises the number of BWs in a 24 hour period, or a combination thereof.

### Claim 15

A method for monitoring fouling of membranes of a desalination or water softening plant comprising reverse osmosis (RO) membranes, nanofiltration (NF) membranes, or a combination thereof, the method comprising:
predicting, for one or more RO/NF skids, a time until which a cleaning in place (CIP) of the one or more RO/NF skids is indicated, wherein each of the one or more RO/NF skids comprises one or more RO/NF arrays, wherein each of the one or more RO/NF arrays comprises a plurality of RO units and each RO unit contains therein a plurality of RO membranes, a plurality of NF units and each NF unit contains therein a plurality of NF membranes, or a combination thereof, wherein the predicting comprises:
calculating and/or monitoring one or more RO/NF parameters,
comparing each of the one or more RO/NF parameters to a performance threshold, wherein the performance threshold indicates a time at which a cleaning in place (CIP) of the RO/NF skid based on that parameter is to be performed, and estimate a time until which each of the one or more RO/NF parameters will reach the performance threshold therefor, and
predicting as the time until which a cleaning in place (CIP) of the one or more RO/NF skids is indicated as the lowest time estimated from among the estimated times until which each of the one or more RO/NF parameters will reach the performance threshold therefor.

### Claim 16 (depends on 15)

The method of claim 15, wherein comparing further comprises determining a rate of fouling based on at least one of the one or more RO/NF parameters by calculating an average change in that parameter over a rate of fouling time period, and estimating the time until which the at least one parameter will reach a performance threshold therefor by dividing a difference between the current value of the at least one parameter and the threshold value for that parameter by the rate of fouling based on that parameter.

### Claim 17 (depends on 16)

The method of claim 16, wherein the one or more parameters comprises the normalized differential pressure (DP), wherein the rate of fouling comprises a DP rate of fouling calculated based on an average increase in normalized DP over a rate of fouling time period, and wherein the time until a DP performance threshold is reached is estimated by dividing a difference between the current DP and a threshold DP by the average DP rate of fouling.

### Claim 18 (depends on 15)

The method of claim 15, wherein monitoring comprises monitoring a trend of the one or more RO/NF parameters to determine a potential cause of the fouling of the membranes.

### Claim 19 (depends on 15)

The method of claim 15, further comprising scheduling CIPs on one or more RO/NF skids by considering an estimated duration for an RO/NF CIP, the availability of one or more CIP skids, a production requirement for water from the plant, the predicted time until which a cleaning of the one or more RO/NF skids is indicated, or a combination thereof, such that the scheduling allows for maintaining of the water production requirement during the cleaning of the one or more RO/NF skids, and a number of CIP skids required for the scheduled CIPs is less than an available number of CIP skids.

### Claim 20 (depends on 15)

The method of claim 15, wherein the calculating and/or monitoring, the comparing, and the predicting are carried out by a controller comprising a processor.

### Claim 21 (depends on 15)

The method of claim 15, wherein the one or more RO/NF parameters are selected from: a normalized feed pressure for each of the one or more RO/NF arrays, a normalized feed flow rate for each of the one or more RO/NF arrays, a normalized differential pressure (DP) for each of the one or more RO/NF arrays, a net driving pressure (NDP, which equals the feed pressure minus an osmotic pressure and a permeate back pressure) for each of the one or more RO/NF arrays, a recovery ratio equal to the permeate flow rate divided by the feed flow rate for each of the one or more RO/NF arrays, a TDS in the permeate from each of the one or more RO/NF arrays, a normalized salt passage (SP) for each of the one or more RO/NF arrays, a normalized permeate flow rate for each of the one or more RO/NF arrays, a rate of fouling for each of the one or more RO/NF arrays, a CIP cleaning frequency for each of the one or more RO/NF skids, a TDS skid discrepancy which is the difference of an outlet TDS of an RO/NF skid from an outlet TDS of one or more of the other RO/NF skids, or a combination thereof.

### Claim 22 (depends on 21)

The method of claim 21, wherein the one or more RO/NF parameters are selected from the rate of fouling of the one or more RO/NF arrays, the CIP cleaning frequency per RO/NF skid, the TDS skid discrepancy, or a combination thereof.

### Claim 23 (depends on 21)

The method of claim 21, wherein the normalized feed pressure is the feed pressure normalized against a reference flow rate, wherein the normalized feed flow rate is the feed flow rate normalized against a reference temperature and/or NDP, wherein the normalized SP is the SP normalized to a reference flow rate and reference temperature, wherein the normalized DP is the DP normalized against a reference temperature and reference flow rate, wherein the normalized permeate flow rate is the permeate flow rate normalized against reference temperature and reference NDP, or a combination thereof, and wherein the reference temperature, the reference flow rate, the reference net driving pressure, or a combination are those values on a first day of operation.

### Claim 24 (depends on 21)

The method of claim 21, wherein the CIP cleaning frequency for each of the one or more RO/NF skids is the number of CIPs per year.

### Claim 25

A computer system operable for monitoring fouling of membranes of a desalination or water softening plant comprising ultrafiltration (UF) membranes, reverse osmosis (RO) membranes, nanofiltration (NF) membranes, or a combination thereof, the system comprising:
a controller comprising a processor configured to:
receive as inputs:
for one or more UF skids comprising a plurality of UF units, each UF unit containing therein a plurality of UF membranes: an inlet temperature, inlet pressure, outlet pressure, flow rate, or a combination thereof;
for one or more RO/NF skids comprising one or more RO/NF arrays, wherein each of the one or more RO/NF arrays comprises a plurality of RO units, each RO unit containing therein a plurality of RO membranes, a plurality of NF units, each NF unit containing therein a plurality of NF membranes, or a combination thereof: inlet temperature, feed pressure, outlet pressure, feed flow rate, permeate flow rate, total dissolved solids (TDS) in the permeate streams from, or a combination thereof for each of the one or more RO/NF arrays;
or a combination thereof,
utilize the inputs:
for the one or more UF skids to calculate and/or monitor, for each of the one or more UF skids, one or more UF parameters,
for the one or more RO/NF skids to calculate and/or monitor one or more RO/NF parameters;
or a combination thereof;
compare:
each of the one or more UF parameters to a first performance threshold, wherein the first performance threshold indicates a time at which a cleaning in place (CIP) of the UF skid is to be performed, and predict an estimated time until which each of the one or more UF parameters will reach the first performance threshold;
each of the one or more RO/NF parameters to a second performance threshold, wherein the second performance threshold indicates a time at which a cleaning in place (CIP) of the RO/NF skid is to be performed, and predict an estimated time until which each of the one or more RO/NF parameters of an RO/NF skid will reach the second performance threshold therefor;
or a combination thereof; and
predict a time until which a cleaning in place (CIP) of each of the one or more RO/NF skids, UF skids, or both is indicated as the lowest time estimated from among the estimated times until which each of the one or more RO/NF parameters or UF parameters will reach the first performance threshold or the second performance threshold, respectively.

### Claim 26 (depends on 25)

The system of claim 25, wherein the controller further comprises a display, a network interface, or both, and wherein the processor produces an output comprising a display of an alert for at least one of the one or more UF parameters, the one or more RO/NF parameters, or a combination thereof, an email alert indicating that at least one of the one or more UF parameters, the one or more RO/NF parameters, or a combination thereof has reached or exceeded an alert level, or both.

### Claim 27 (depends on 26)

The system of claim 26, wherein the controller provides a continuous display of each displayed parameter.

### Claim 28 (depends on 27)

The system of claim 27, wherein a first alert is displayed when the value of a displayed parameter is greater than a threshold, but less than or equal to the alert level therefor.

### Claim 29 (depends on 25)

The system of claim 25, wherein a rate of fouling for each of the one or more UF parameters, the one or more RO/NF parameters, or a combination thereof, is calculated based on an average change in that parameter over a rate of fouling time period, and wherein the estimated time until the skid will reach a performance threshold for that parameter is predicted by dividing a difference between a current value of that parameter and a threshold value for that parameter by the average change in that parameter over the rate of fouling time period.

### Claim 30 (depends on 29)

The system of claim 29, wherein the rate of fouling comprises a differential pressure (DP) rate of fouling calculated based on an average increase in normalized DP over a rate of fouling time period, and wherein the time until a DP performance threshold is reached is estimated by dividing a difference between the current DP and a threshold DP by the average DP rate of fouling.

### Claim 31 (depends on 25)

The system of claim 25, wherein the processor is further operable to monitor a trend in the one or more UF parameters, the one or more RO/NF parameters, or a combination thereof, and compare the monitored trend with data in a memory of the processor to produce an output indicating a potential cause of the fouling of the membranes of a UF skid and/or an RO/NF skid for which a CIP is indicated.

### Claim 32 (depends on 25)

The system of claim 25, wherein the processor is further configured to provide a suggested schedule for performing CIPs on one or more of the one or more UF skids, one or more of the one or more RO/NF skids, or a combination thereof, based on data inputted into a memory of the processor regarding an estimated duration for a UF skid CIP and/or an RO/NF skid CIP, the availability of one or more CIP skids, a production requirement for water from the desalination or water softening plant, the predicted time until which a cleaning of the one or more of the one or more UF skids, the one or more of the one or more RO/NF skids, or the combination thereof is indicated, or a combination thereof.

### Claim 33 (depends on 25)

The system of claim 25:
wherein the one or more UF parameters are selected from: a normalized feed flow rate, a normalized transmembrane pressure (TMP), a highest normalized TMP in a TMP reference time period, a skid flux, a specific skid flux calculated as the flow rate per surface area divided by the TMP, a temperature corrected specific flux (TCSF), a lowest specific flux in a lowest flux reference time period, a backwash (BW) frequency, a CEB frequency, a TMP increase after a routinely scheduled CEB, a number of CIPs in a CIP reference time period, a volume of liquid introduced into a UF skid during a backwash (BW) or chemically enhanced backwash (CEB), a BW duration, a pressure decay rate (PDR), a pressurization rate, or a combination thereof;
wherein the one or more RO/NF parameters are selected from: a normalized feed pressure to each of the one or more arrays, a normalized feed flow rate, a normalized differential pressure (DP) for each of the one or more arrays, a net driving pressure (NDP, which equals the feed pressure minus an osmotic pressure and a permeate back pressure) for each of the one or more arrays, a recovery ratio equal to the permeate flow rate divided by the feed flow rate for each of the one or more arrays, a TDS in the permeate from each of the one or more arrays, a normalized salt passage (SP) for each of the one or more arrays, a normalized permeate flow rate, a CIP cleaning frequency for each of the RO/NF skids, a rate of fouling for each of the one or more arrays, a TDS discrepancy which is the difference of an outlet TDS of an RO/NF skid from an outlet TDS of one or more of the other RO/NF skids, or a combination thereof;
or a combination thereof.

### Claim 34 (depends on 33)

The system of claim 33, wherein the one or more UF parameters comprise the lowest specific flux, the volume of liquid introduced into a UF skid during a BW or CEB, the BW frequency, or a combination thereof.

### Claim 35 (depends on 33)

The system of claim 33, wherein the one or more RO/NF parameters are selected from the rate of fouling, the CIP cleaning frequency, the TDS skid discrepancy, or a combination thereof

### Claim 36 (depends on 33)

The system of claim 33, wherein the lowest specific flux reference time period is 24 hours, wherein the TMP reference time period is 24 hours, wherein a routinely scheduled CEB is a daily CEB, wherein a CIP reference time period is three months, or a combination thereof.

### Claim 37 (depends on 33)

The system of claim 33, wherein the reference temperature, the reference flow rate, the reference net driving pressure, or a combination are those values on a first day of operation.

### Claim 38 (depends on 33)

The system of claim 33, wherein the CEB frequency comprises the number of CEBs in 7 days, wherein the CIP cleaning frequency for each of the RO/NF skids comprises the number of CIP cleans per year, wherein the BW frequency comprises the number of BWs in a 24 hour period, or a combination thereof.
