# US 2021/0156725 A1 · Bidirectional Pycnometer

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0156725 A1
- Document ID: US20210156725A1
- Status: Published application
- Kind: A1
- Application number: 16/694,615
- Filed: 2019-11-25
- Published: 2021-05-27
- Earliest claimed: 2019-11-25
- Assignees: Anton Paar Quantatec, Inc.
- Applicants: Anton Paar QuantaTec, Inc.
- Inventors: Enrique Gadea Ramos; Martin Thomas; Stefan Thaler
- Web page: https://patentgrep.com/patent/US20210156725A1

## CPC

- G01F 17/00: Methods or apparatus for determining the capacity of containers or cavities, or the volume of solid bodies (measuring linear dimensions to determine volume G01B)
- G01F 22/02: involving measurement of pressure
- G01N 9/02: by measuring weight of a known volume
- G01N 9/26: by measuring pressure differences
- G01N 2009/028: {a gas being used as displacement fluid}
- G01F: MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)

## Abstract

An arrangement for measuring a volume of sample is disclosed. The arrangement includes a first chamber for accommodating the sample; at least one second chamber connectable to the first chamber; a first gas path including a first valve connected to the first chamber and on the other end connected to a gas entry path; a second gas path including a second valve, connected to the second chamber and on the other end connected to the gas entry path; a pressure sensor; a third gas path including a third valve, the third gas path connected to the first chamber and on the other end connected, via the third valve, to the pressure sensor; a fourth gas path including a fourth valve, the fourth path being connected to the second chamber and on the other end connected, via the fourth valve, to the pressure sensor.

## Claims

### Claim 1

An arrangement for measuring a volume of a solid or liquid sample, the arrangement, comprising:
a first chamber for accommodating the sample;
at least one second chamber connectable to the first chamber;
a first gas path including a first valve, the first gas path being on one end connected, via the first valve, to the first chamber and on the other end connected to a gas entry path;
a second gas path including a second valve, the second gas path being on one end connected, via the second valve, to the second chamber and on the other end connected to the gas entry path;
a pressure sensor;
a third gas path including a third valve, the third gas path being on one end connected to the first chamber and on the other end connected, via the third valve, to the pressure sensor; and
a fourth gas path including a fourth valve, the fourth path being on one end connected to the second chamber and on the other end connected, via the fourth valve, to the pressure sensor.

### Claim 2 (depends on 1)

The arrangement according to claim 1, further comprising:
a controller adapted to control a state of at least one of the first valve, the second valve, the third valve, the fourth valve, such as to allow measurement of the sample volume selectively according to a first measurement mode or a second measurement mode,
wherein in the first measurement mode, the first chamber in which the sample is accommodated is filled with gas from the gas entry path and the gas is later expanded into the second chamber,
wherein in the second measurement mode, the second chamber is filled with gas from the gas entry path and the gas is later expanded into the first chamber in which the sample is accommodated.

### Claim 3 (depends on 2)

The arrangement according to claim 2, wherein in the first and the second measurement mode the gas is vented via a gas sink.

### Claim 4 (depends on 2)

The arrangement according to claim 2, wherein the controller is adapted to cause when in the first measurement mode:
opening the first valve and the third valve, to allow filling the first chamber with gas from the gas entry path, closing the first valve and measuring a first pressure related to the first measurement mode using the pressure sensor;
opening the fourth valve, to allow expanding the gas also into the at least one second chamber and measuring a second pressure related to the first measurement mode,
wherein the arrangement is adapted to calculate the volume of the sample based on the first pressure and the second pressure, related to the first measurement mode.

### Claim 5 (depends on 2)

The arrangement according to claim 2, wherein the controller is adapted to cause when in the second measurement mode:
opening the second valve and the fourth valve, to allow filling the at least one second chamber with gas from the gas entry path, closing the second valve and measuring a first pressure related to the second measurement mode using the pressure sensor;
opening the third valve, to allow expanding the gas also into the first chamber and measuring a second pressure related to the second measurement mode,
wherein the arrangement is adapted to calculate the volume of the sample based on the first pressure and the second pressure, related to the second measurement mode.

### Claim 6 (depends on 4, 5)

The arrangement according to claim 4 or claim 5, further comprising at least one of the following:
a fifth gas path including a fifth valve, the fifth gas path being on one end connected, via the fifth valve, to the first chamber and on the other end connected to a gas sink;
a sixth gas path including a sixth valve, the sixth gas path being on one end connected, via the sixth valve, to the second chamber and on the other end connected to the gas sink.

### Claim 7 (depends on 4, 6)

The arrangement according to claim 6 when referred to claim 4, further comprising after measuring the second pressure related to the first measurement mode:
opening the fifth valve, to allow venting the gas from the first chamber and the second chamber to the gas sink.

### Claim 8 (depends on 5, 6)

The arrangement according to claim 6 when referred to claim 5, further comprising after measuring the second pressure related to the second measurement mode:
opening the sixth valve, to allow venting the gas from the first chamber and the second chamber to the gas sink.

### Claim 9 (depends on 1)

The arrangement according to claim 1, further comprising:
a processor adapted to calculate the volume of the sample based on at least pressure measurements and volumes of the first chamber and the second chamber.

### Claim 10 (depends on 1)

The arrangement according to claim 1, wherein at least one of the first valve, the second valve, the third valve, the fourth valve, includes an unidirectional valve having an input side being leak tight.

### Claim 11 (depends on 10)

The arrangement according to claim 10, wherein at least one of the following applies:
an input side of the first valve faces/is connected to the first chamber;
an input side of the second valve faces/is connected to the second chamber;
an input side of the third valve faces/is connected to the pressure sensor;
an input side of the fourth valve faces/is connected to the pressure sensor
the input side of the fourth valve is connected to the first chamber, if the third valve is in an open state;
the input side of the third valve is connected to the second chamber, if the fourth valve is in an open state.

### Claim 12 (depends on 1)

The arrangement according to claim 1, further comprising:
an eighth valve on one end connected to the first valve, the second valve and the gas entry path and on another end connected to another gas sink.

### Claim 13 (depends on 1)

The arrangement according to claim 1, wherein at least one of the following applies:
the gas entry path includes a gas supply valve; and
at least one of the first valve, the second valve, the third valve, the fourth valve, includes or is a solenoid valve, in particular a two-way latching valve.

### Claim 14 (depends on 1)

The arrangement according to claim 1, further comprising:
an electronic storage containing volume calibration data for the first chamber and the second chamber for calculating the sample volume.

### Claim 15 (depends on 1)

The arrangement according to claim 1, further comprising:
a metal assembly in thermal contact with/harboring/including the first chamber, the second chamber and at least one gas path; and
a tempering equipment for tempering the metal assembly to a desired temperature,
wherein at least a portion of at least one gas path is implemented as a bore in the metal assembly.

### Claim 16 (depends on 15)

The arrangement according to claim 15, further comprising:
a third chamber connected to a gas supply source and providing the gas entry path into the first gas path and the second gas path,
wherein the third chamber is in thermal contact with/harbored in the metal assembly.

### Claim 17 (depends on 16)

The arrangement according to claim 16, wherein the third chamber encloses a metallic material providing high surface area, wherein the metallic material is in thermal contact with the metal assembly, wherein the metallic material comprises at least one of: a fibrous web, a sintered structure, a loose material, a mesh, a fleece, a fabric, a non-woven fabric, a woven fabric, and a mat.

### Claim 18 (depends on 16)

The arrangement according to claim 16, wherein the metal assembly comprises:
a first metal portion harboring the first chamber, a second metal portion harboring the second chamber and a third metal portion harboring the third chamber, wherein the first metal portion is mounted at a side flat surface to a side flat surface of the second metal portion and another side flat surface of the second metal portion is mounted at a side flat surface of the third metal portion.

### Claim 19 (depends on 16)

The arrangement according to claim 16, wherein at least one valve is surface mounted on an external surface of the metal assembly.

### Claim 20

A method of manufacturing an arrangement for measuring a volume of a solid or liquid sample, the method comprising:
providing a first gas path including a first valve, the first gas path being on one end connected, via the first valve, to a first chamber for accommodating the sample and on the other end connected to a gas entry path;
providing a second gas path including a second valve, the second gas path being on one end connected, via the second valve, to at least one second chamber connectable to the sample chamber and on the other end connected to the gas entry path;
providing a third gas path including a third valve, the third gas path being on one end connected to the first chamber and on the other end connected, via the third valve, to a pressure sensor; and
providing a fourth gas path including a fourth valve, the fourth path being on one end connected to the second chamber and on the other end connected, via the fourth valve, to the pressure sensor.
