# US 2021/0140166 A1 · Structural Frame for a Building and Method of Constructing the Same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0140166 A1
- Document ID: US20210140166A1
- Status: Published application
- Kind: A1
- Application number: 17/122,002
- Filed: 2020-12-15
- Published: 2021-05-13
- Earliest claimed: 2017-12-29
- Assignees: Envision Integrated Building Technologies Inc
- Applicants: Envision Integrated Building Technologies Inc
- Inventors: Gerry Rutledge; Nikola Muravlijov; Dejan Dikic
- Web page: https://patentgrep.com/patent/US20210140166A1

## CPC

- E04B 1/19: Three-dimensional [3D] framework structures
- E04B 1/04: the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
- E04B 1/1903: {Connecting nodes specially adapted therefor}
- E04B 5/023: {Separate connecting devices for prefabricated floor-slabs}
- E04B 5/04: with beams {or slabs} of concrete or other stone-like material, e.g. asbestos cement (E04B5/08, E04B5/14 take precedence)
- E04B 5/14: with beams or girders laid in two directions
- E04B 5/28: Cross-ribbed floors
- E04B 5/29: the prefabricated parts of the beams consisting wholly of metal (E04B5/28 takes precedence)
- E04B 1/34317: {Set of building elements forming a self-contained package for transport before assembly}
- E04B 2001/1948: {Concrete struts}
- E04B 2001/1996: {Tensile-integrity structures, i.e. structures comprising compression struts connected through flexible tension members, e.g. cables}
- E04B 2001/3583: {using permanent tensioning means, e.g. cables or rods, to assemble or rigidify structures (not pre- or poststressing concrete), e.g. by tying them around the structure}
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})

## Abstract

A structural frame for a building, comprising: adjacent first and second columns; at least one precast concrete floor slab having first and second corner indents located in two adjacent corners and a first elongated edge beam defined between the first and second corner indents, the first elongated edge beam being disposed between the first and second columns such that the first and second columns are received in the first and second corner indents and that the first elongated edge beam abuts the first and second columns; and a first tendon assembly extending between the first and second columns and adapted to be tensioned to compress the first elongated edge beam between the first and second columns, the first tendon assembly including at least one left cable and at least one right cable located symmetrically on either sides of a vertical center plane of the first and second columns.

## Claims

### Claim 1

A structural frame for a building, the structural frame comprising:
a plurality of rectangular columns including a first column and a second column adjacent the first column, the first and second columns being spaced from each other by a first distance, the first column having a first vertical center plane and the second column having a second vertical center plane;
at least one precast concrete floor slab having opposite first and second sides and opposite third and fourth sides defining four corners therebetween, the floor slab further having first and second corner indents located in two adjacent corners, each corner indent being sized and shaped to receive one of the first and second columns, the first and second corner indents extending inwardly from the first side towards the second side to define a first elongated edge beam therebetween, the first elongated edge beam having a length corresponding to the first distance between the first and second columns, the first elongated edge beam being disposed between the first and second columns such that the first and second columns are received in the first and second corner indents and that the first elongated edge beam abuts the first and second columns; and
a first tendon assembly extending between the first and second columns, the first tendon assembly being adapted to be tensioned to thereby compress the first elongated edge beam between the first and second columns, the first tendon assembly including at least one left cable and at least one right cable located symmetrically on either sides of at least one of the first and second vertical center planes.

### Claim 2 (depends on 1)

The structural frame as claimed in claim 1, wherein the at least one precast concrete floor slab includes a first slab and a second slab adjacent the first slab and spaced from the first floor slab to define an elongated space therebetween, the first tendon assembly extending within the elongated space between the adjacent columns.

### Claim 3 (depends on 2)

The structural frame as claimed in claim 2, further including grout received in the elongated space for encasing the first tendon assembly.

### Claim 4 (depends on 3)

The structural frame as claimed in claim 3, further including a plurality of column reinforcement members, each column reinforcement member including a female connector extending through a corresponding one of the first and second adjacent columns and a rod portion engaging the female connector and extending into the elongated space to anchor the corresponding adjacent column to the grout in the elongated space.

### Claim 5 (depends on 1)

The structural frame as claimed in claim 1, wherein the first adjacent column includes a first perimeter column located on a perimeter of the building and the second adjacent column includes a central column located in the building away from the perimeter of the building.

### Claim 6 (depends on 5)

The structural frame as claimed in claim 5, wherein the plurality of columns includes a second perimeter column adjacent the central column, the second perimeter column being located opposite the first perimeter column and in alignment with the first perimeter column and the central column, the first tendon assembly being secured to the first and second perimeter columns and extending between the first and second perimeter columns through the central column.

### Claim 7 (depends on 1)

The structural frame as claimed in claim 1, wherein the at least one precast concrete floor slab further includes a third corner indent adjacent the second corner indent, the second and third corner indent extending inwardly from the third side towards the fourth side to define a second elongated edge beam therebetween, the second elongated edge beam having a length corresponding to the first distance between the first and second columns.

### Claim 8 (depends on 7)

The structural frame as claimed in claim 7, wherein the plurality of columns further includes a third column adjacent the second column, the first and second columns being aligned along a first axis and the second and third columns being aligned along a second axis perpendicular to the first axis, the second and third column being spaced apart by the first distance to receive the second elongated edge beam therebetween.

### Claim 9 (depends on 8)

The structural frame as claimed in claim 8, further including a second tendon assembly extending between the second and third columns, the second tendon assembly being adapted to be tensioned to thereby compress the second elongated edge beam between the second and third columns.

### Claim 10 (depends on 1)

The structural frame as claimed in claim 1, further including a perimeter beam having a length corresponding to the first distance between the first and second columns, the perimeter beam being adapted to be received between the first and second columns so as to be compressed between the first and second columns when the first tendon assembly is tensioned.

### Claim 11 (depends on 10)

The structural frame as claimed in claim 10, wherein the perimeter beam has a rectangular cross-section.

### Claim 12 (depends on 1)

The structural frame as claimed in claim 1, wherein each slab includes a plurality of ribs extending below the top face between opposite sides of the slab for providing rigidity to the slab.

### Claim 13 (depends on 12)

The structural frame as claimed in claim 12, wherein the plurality of ribs includes first and second parallel ribs and third and fourth parallel ribs extending perpendicularly to the first and second parallel ribs.

### Claim 14 (depends on 1)

The structural frame as claimed in claim 1, wherein the at least one left cable and the at least one right cable are made of structural steel.

### Claim 15 (depends on 1)

The structural frame as claimed in claim 1, wherein the at least one left cable and the at least one right cable include a pair of spaced-apart upper cables and a pair of spaced-apart lower cables located below the upper cables.

### Claim 16

A method for constructing a structural frame for a building, the method including:
providing a plurality of precast columns;
positioning the columns so as to define a perimeter of the structural frame;
providing a plurality of precast concrete floor slabs, each slab having opposite first and second sides and opposite third and fourth sides defining four corners therebetween, the floor slab further having first and second corner indents located in two adjacent corners, each corner indent being sized and shaped to receive one of the first and second columns, the first and second corner indents extending inwardly from the first side towards the second side to define an elongated edge beam therebetween, the elongated edge beam having a length corresponding to the first distance between the first and second columns, the elongated edge beam being disposed between the first and second columns such that the first and second columns are received in the first and second corner indents and that the elongated edge beam abuts the first and second columns;
positioning the slabs horizontally adjacent each other to define a floor of the structural frame such that the elongated edge beams extend between two adjacent ones of the columns;
providing at least one tendon assembly extending between the adjacent columns;
tensioning the at least one tendon assembly to thereby compress the elongated edge beams between the adjacent columns.

### Claim 17 (depends on 17)

The method as claimed in claim 17, further comprising:
applying grout over the at least one tensioned tendon assembly.

### Claim 18

A kit for constructing a structural frame of a building, the kit comprising:
a plurality of rectangular columns including a first column and a second column adapted to be disposed adjacent the first column such that the first and second columns are spaced from each other by a first distance;
at least one precast concrete floor slab having opposite first and second sides and opposite third and fourth sides defining four corners therebetween, the floor slab further having first and second corner indents located in two adjacent corners, each corner indent being sized and shaped to receive one of the first and second columns, the first and second corner indents extending inwardly from the first side towards the second side to define a first elongated edge beam therebetween, the first elongated edge beam having a length corresponding to the first distance between the first and second columns, the first elongated edge beam being disposed between the first and second columns such that the first and second columns are received in the first and second corner indents and that the first elongated edge beam abuts the first and second columns; and
a first tendon assembly adapted to extend between the first and second columns, the first tendon assembly being adapted to be tensioned to thereby compress the first elongated edge beam between the first and second columns.