# US 2021/0103254 A1 · Redundant Automation System, Method for Creating the Automation System, Computer Program and Computer Readable Medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0103254 A1
- Document ID: US20210103254A1
- Status: Published application
- Kind: A1
- Application number: 17/061,707
- Filed: 2020-10-02
- Published: 2021-04-08
- Earliest claimed: 2019-10-04
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Aktiengesellschaft
- Inventors: Thomas GROSCH
- Web page: https://patentgrep.com/patent/US20210103254A1

## CPC

- G05B 9/03: with multiple-channel loop, i.e. redundant control systems
- G05B 19/0428: {Safety, monitoring (G05B19/0423 takes precedence)}
- G05B 19/4185: {characterised by the network communication}
- G06F 11/1675: {Temporal synchronisation or re-synchronisation of redundant processing components}
- G06F 11/1687: {at event level, e.g. by interrupt or result of polling}
- G06F 11/2038: {with a single idle spare processing component}
- G06F 11/2097: {maintaining the standby controller/processing unit updated (initialisation or re-synchronisation thereof G06F11/1658 and subgroups)}
- G05B 2219/24182: Redundancy
- G05B 2219/24183: If error, spare unit takes over, message to leader, confirm new configuration
- G05B 2219/24186: Redundant processors are synchronised
- G06F 11/2033: {switching over of hardware resources}
- G06F 11/2048: {where the redundant components share neither address space nor persistent storage}
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A method for creating a redundant automation system, a computer program and a computer-readable medium, wherein the redundant automation system includes at least one automation installation to be controlled that is installed at an installation location and two control applications that are communicatively interconnected via a synchronization path, and includes a plurality of communication hubs and communication paths connecting these to one another, where one of the control applications operates as the master and the other control application operates as a reserve, such that when the control application operating as the master fails, the control application operating as the reserve function as the master, and where the locations of the computing resources for the control applications are selected such that the control applications are connected to the at least one automation installation via two different communication paths preferably having no or a minimal number of common communication hubs.

## Claims

### Claim 1

A redundant automation system comprising:
at least one automation installation to be controlled, which is installed at an installation location; and
two control applications which are communicatively coupled to one another via a synchronization path, configured to control the automation installation, form part of a cloud-computing structure of which the computing resources are provided at different locations and which are communicatively connected to the automation installation via the Internet or a comparable computer network;
a plurality of communication hubs; and
communication paths interconnecting said plurality of communication hubs to one another;
wherein one of the control applications operates as a master and another control application operates as a reserve;
wherein in an event the control application while operating as the master fails, the control application operating as the reserve takes over and function as the master; and
wherein the locations of the computing resources for the control applications are selected such that the control applications are connected to the automation installation via two different communication paths having no or a minimal number of common communication hubs.

### Claim 2 (depends on 1)

The automation system as claimed in claim 1, wherein the synchronization path connecting the two control applications to one another comprises a communication path of the Internet or the comparable computer network; and wherein the synchronization path and the two communication paths connecting the control applications to the automation installation have no or a minimal number of common communication hubs.

### Claim 3 (depends on 1)

The automation system as claimed in claim 1, wherein the computing resources for the control applications are computing centers.

### Claim 4 (depends on 2)

The automation system as claimed in claim 2, wherein the computing resources for the control applications are computing centers.

### Claim 5 (depends on 1)

The automation system as claimed in claims 1, wherein the computing resources for the two control applications are decoupled from one another with respect to energy supply.

### Claim 6

A method for creating a redundant automation system, the method comprising:
a) providing information on a network topology of the internet or a comparable computer network including information on structure of communication hubs in the network and on communication paths interconnecting connecting said communication hubs;
b) providing information on computing centers present within the network topology, said information including information on the locations computing centers;
c) identifying an installation location of an automation installation to be controlled within the network topology;
d) identifying at least one pair of computing centers which is connectable to the automation installation within the network topology via communication paths and which have at least one of (i) a minimal number of overlaps and (ii) common communication hubs; and
e) selecting said at least one pair of computing centers identified in step d) including associated communication paths.

### Claim 7 (depends on 6)

The method as claimed in claim 6, wherein additional information on at least one of (i) a power supply (ii) a present utilization and (iii) a computing power of the at least one pair of computing centers is provided during step b); and wherein occurs taking account of at least one item of said additional information is taken into account during said selection in step e).

### Claim 10 (depends on 8)

The method as claimed in claim 8, wherein the synchronization path selected in step h) is selected such that the synchronization path and the two communication paths connecting the control applications to the automation installation have no or a minimal number of common communication hubs.

### Claim 11 (depends on 6)

The method as claimed in claim 6, wherein the at least one pair of computing centers have no overlaps or no common communication hubs.

### Claim 12 (depends on 6)

A computer program comprising program code which, when executed by a processor of at least one computer, causes the at least one computer to perform the method as claimed one of claim 6.

### Claim 13

A non-transitory computer-readable medium encoded with computer program instructions, which, when executed by a processor of at least one computer, causes the at least one computer to creating a redundant automation system, the computer program instructions comprising:
a) program code for providing information on a network topology of the internet or a comparable computer network including information on structure of communication hubs in the network and on communication paths interconnecting connecting said communication hubs;
b) program code for providing information on computing centers present within the network topology, said information including information on the locations computing centers;
c) program code for identifying an installation location of an automation installation to be controlled within the network topology;
d) program code for identifying at least one pair of computing centers, which is connectable to the automation installation within the network topology via communication paths and which have at least one of (i) a minimal number of overlaps and (ii) common communication hubs; and
e) program code for selecting said at least one pair of computing centers identified in step d) including associated communication paths.

### Claim at position 12 (depends on 6)

8(7). The method as claimed in claim 6, further comprising:
f) providing two control applications configured to control the automation installation, the two control applications being configured such that one control application of the two control applications operates as a master and another control application of the two control applications operates as a reserve; and in an event the application operating as the master control fails, the control application operating as the reserve takes over and functions as the master;
g) storing the two control applications in the at least one pair of computing centers selected in step e);
h) coupling the two control applications via a synchronization path; and
i) connecting the two control applications to the automation installation via the associated communication paths selected in step e).

### Claim at position 13 (depends on 7)

9(7a). The method as claimed in claim 7, further comprising:
f) providing two control applications configured to control the automation installation, the two control applications being configured such that one control application of the two control applications operates as a master and another control application of the two control applications operates as a reserve; and in an event the application operating as the master control fails, the control application operating as the reserve takes over and functions as the master;
g) storing the two control applications in the at least one pair of computing centers selected in step e);
h) coupling the two control applications via a synchronization path; and
i) connecting the two control applications to the automation installation via the associated communication paths selected in step e).
