# US 2021/0092886 A1 · Method and control device for the processing-time-optimized production of printed circuit boards on a pick-and-place line

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0092886 A1
- Document ID: US20210092886A1
- Status: Published application
- Kind: A1
- Application number: 16/629,726
- Filed: 2017-07-11
- Published: 2021-03-25
- Earliest claimed: 2017-07-11
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Aktiengesellschaft
- Inventors: Alexander Pfaffinger; Christian Royer
- Web page: https://patentgrep.com/patent/US20210092886A1

## CPC

- H05K 13/085: {Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level}
- H05K 13/0857: {Product-specific machine setup; Changeover of machines or assembly lines to new product type}
- G06Q 10/063: Operations research, analysis or management
- G06Q 10/0633: Workflow analysis
- G06Q 10/06334: {using forecasting or predicting}
- G06Q 50/04: Manufacturing
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- Y02P 90/30: Computing systems specially adapted for manufacturing
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Provided is a transmission device for feedback-free unidirectional transmission of data from a first network zone into a second network zone for evaluation at a remote application server, containing:—a data export device which is arranged in the first network zone and is to detect the data transmitted in a network data format in the first network zone and to transform the data from the network data format into a transport data format,—a unidirectional data transmission unit, to transmit the data in the transport data format into the second network zone unidirectionally—a data import device which transforms the data from the transport data format back into the network data format and to transmit the data to an application server, wherein the data import device and the application server are arranged in a second network zone remote from the first zone, and to a corresponding method.

## Claims

### Claim 1

A method for the processing-time-optimized production of printed circuit boards on a pick-and-place line, wherein the printed circuit boards each have a production cycle time and are divided into groups known as clusters, wherein each cluster is fabricated by a setup, wherein the setup is achieved by shuttle tables that are attachable to the pick-and-place lines, which each comprise at least one feed device for providing stores of components wherein a quantity of shuttle tables necessary per setup is designated as shuttle table set and an empty shuttle table set comprises shuttle tables whose feed devices are empty, under the conditions that
a setup is temporarily set up on empty shuttle table sets and dismantled after production of printed circuit boards by the assembly thereof, and that
one of the shuttle table sets can only be used in production if it has been completely set up in a preliminary setup area and the shuttle table set can only be set up again when the production performed with the shuttle table set has ended and the shuttle table set has been dismantled again in the preliminary setup area,
wherein the method comprises the following steps:
a) sensing a quantity of clusters,
b) sensing a number of empty shuttle table sets,
c) sensing the respective time for creating the setup for a cluster,
d) sensing a number of printed circuit boards within a cluster,
e) determining the cumulative cycle times of the printed circuit boards within a cluster, wherein the determined result corresponds to the production time for a cluster,
f) selecting an order for using the shuttle table sets for setting up in the preliminary setup area with the aim of avoiding waiting times in production in which these shuttle table sets are used for producing printed circuit boards,
g) setting an order of the printed circuit boards within a cluster in ascending order according to the cycle times of the individual printed circuit boards,
h) optimizing the order of the clusters taking into account the selected order for using the shuttle table sets,
i) wherein the average processing time of the printed circuit boards from all the sensed clusters is minimized,
j) carrying out the production of the printed circuit boards with the aid of the set and optimized orders of the printed circuit boards and the clusters thereof.

### Claim 2 (depends on 1)

The method as claimed in claim 1, wherein in order to minimize the average processing times of the printed circuit boards of the clusters, the sum of the number of printed circuit boards of a cluster multiplied by the starting time of the cluster is minimized over all the clusters.

### Claim 3 (depends on 1)

The method as claimed in claim 1, wherein in addition changeover times are sensed and taken into account in the production time, which changeover times occur as a result of changing the shuttle table sets on transition from one setup to another setup.

### Claim 4 (depends on 1)

The method as claimed in claim 1, wherein steps h) and i) are carried out with the aid of mixed integer linear optimization.

### Claim 5 (depends on 1)

The method as claimed in claim 1, wherein different types of setups are used, wherein a first type corresponds to a fixed setup, which remains unchanged after setting up once and is not dismantled and set up before production and a shuttle table set is provided per fixed setup, wherein a second type corresponds to a variant setup, which is variable as claimed in claim 1 and at least one shuttle table set is provided for the variant setups and wherein the printed circuit boards of each cluster are fabricated with a setup of a predefinable type of the said types.

### Claim 6 (depends on 1)

The method as claimed in claim 1, wherein one cluster with a fixed setup split and introduced multiple times into the order of the clusters.

### Claim 7 (depends on 1)

The method as claimed in claim 1, wherein in order to minimize the average processing times of the printed circuit boards of the clusters, a cost function is taken into account.

### Claim 8 (depends on 1)

The method as claimed in claim 1, wherein the cost function expresses inventory costs of printed circuit boards.

### Claim 9

A control device, for the processing-time-optimized production of printed circuit boards on an pick-and-place line, wherein the printed circuit boards each have a production cycle time and are divided into groups known as clusters, wherein each cluster is fabricated by setup, wherein the setup is achieved by shuttle tables that are attachable to the pick-and-place lines, which each comprise at least one feed device for providing stores of components, wherein a quantity of shuttle tables necessary per setup is designated as shuttle table set and an empty shuttle table set comprises shuttle tables whose feed devices are empty, under the conditions that
a setup is temporarily set up on empty shuttle table sets and is dismantled after production of printed circuit boards by the assembly thereof, and that
one of the shuttle table sets can only be used in production if it has been completely set up in a preliminary setup area and the shuttle table set can only be set up again when the production performed with the shuttle table set has ended and the shuttle table set has been dismantled again in the preliminary setup area,
wherein the control unit comprises the following sensing devices:
a) for sensing a quantity of clusters,
b) for sensing a number of empty shuttle table sets,
c) for sensing the respective time for creating the setup for a cluster,
d) for sensing a number of printed circuit boards within a cluster, and
e) means for determining the cumulative cycle times of the printed circuit boards within a cluster, wherein the determined result corresponds to the production time for a cluster,
f) means for selecting an order for using the shuttle table sets for setting up in the preliminary setup area with the aim of avoiding waiting times in production in which these shuttle table sets is used for producing printed circuit boards,
g) means for setting an order of the printed circuit boards within a cluster in ascending order according to the cycle times of the individual printed circuit boards, and
h) means for optimizing the order of the clusters taking into account the selected order for using the shuttle table sets,
i) wherein the average processing time of the printed circuit boards from all the sensed clusters is minimized, and
j) means for carrying out the production of the printed circuit boards with the aid of the set and optimized orders of the printed circuit boards and the clusters thereof.

### Claim 10 (depends on 1)

The control device as claimed in claim 1, wherein in order to minimize the average processing times of the printed circuit boards of the clusters, the sum of the number of printed circuit boards of a cluster multiplied by the starting time of the cluster is minimized over all the clusters.

### Claim 11 (depends on 1)

The control device as claimed in claim 1, wherein the control device additionally has means for sensing changeover times, which are taken into account in the production time and which occur as a result of changing the shuttle table sets on transition from one setup to another setup.

### Claim 12 (depends on 9, 10)

The control device as claimed in claim 10, wherein the means from steps h) and i) in claim 9 are configured by means for mixed integer linear optimization.

### Claim 13 (depends on 9)

The control device as claimed in claim 9, wherein different types of setups is used, wherein a first type corresponds to a fixed setup, which remains unchanged after setting up once and is not dismantled and set up before production and a shuttle table set is provided per fixed setup, wherein a second type corresponds to a variant setup, which is variable as claimed in claim 9 and at least one shuttle table set is provided for the variant setups and wherein the printed circuit boards of each cluster is fabricated with a setup of a predefinable type of the said types.

### Claim 14 (depends on 1, 9)

A computer program product, comprising a computer readable hardware storage device having computer readable program code stored therein, said program code executable by a processor of a computer system to implement a method with program code for carrying out the method as claimed in claim 1, when it runs on a control device as claimed in claim 9 or is stored on a computer-readable medium.