# US 2021/0084677 A1 · Scheduling a single cell multicast traffic channel via a single cell multicast control channel

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0084677 A1
- Document ID: US20210084677A1
- Status: Published application
- Kind: A1
- Application number: 16/970,212
- Filed: 2019-02-11
- Published: 2021-03-18
- Earliest claimed: 2018-02-15
- Assignees: Telefonaktiebolaget LM Ericsson (publ)
- Applicants: Telefonaktiebolaget LM Ericsson (publ)
- Inventors: Stefan WÄNSTEDT; Andreas HÖGLUND; Antti RATILAINEN; Emre YAVUZ; Tuomas TIRRONEN; Yutao SUI
- Web page: https://patentgrep.com/patent/US20210084677A1

## CPC

- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W 4/06: Selective distribution of broadcast services, e.g. multimedia broadcast multicast service [MBMS]; Services to user groups; One-way selective calling services
- H04W 4/70: Services for machine-to-machine communication [M2M] or machine type communication [MTC]
- H04W 72/30: Resource management for broadcast services
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

A network node transmits a scheduling configuration, over a Single Cell Multicast Control Channel, that indicates whether a single transport block or multiple transport blocks of a Single Cell Multicast Traffic Channel are scheduled. The network node may then transmit a transport block in accordance with the scheduling configuration. Correspondingly, a user equipment receives the scheduling configuration. The UE may then receive a transport block in accordance with the scheduling configuration.

## Claims

### Claim 1

A method, performed by a user equipment, the method comprising:
receiving a scheduling configuration, over a Single Cell Multicast Control Channel, that indicates whether one of a single transport block and multiple transport blocks of a Single Cell Multicast Traffic Channel are scheduled.

### Claim 2 (depends on 1)

The method of claim 1, wherein, to indicate that multiple transport blocks are scheduled, the scheduling configuration comprises a value explicitly specifying how many transport blocks are comprised in the multiple transport blocks.

### Claim 3 (depends on 1)

The method of claim 1, wherein the scheduling configuration does not explicitly specify how many transport blocks are scheduled, and the method further comprises interpreting the scheduling configuration as indicating that a preconfigured number of transport blocks are scheduled.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
monitoring the SC-MCCH for the scheduling configuration;
in response to receiving the scheduling configuration, suspending the monitoring until all of the scheduled transport blocks are received;
resuming the monitoring in response to receiving all of the scheduled transport blocks.

### Claim 5 (depends on 4)

The method of claim 4, further comprising failing to receive a further scheduling configuration within a threshold period after the monitoring is resumed, and in response, re-suspending the monitoring until additional transport blocks equal to the scheduled transport blocks in number are received.

### Claim 6 (depends on 4)

The method of claim 4, further comprising failing to receive a further scheduling configuration within a threshold period after the monitoring is resumed, and in response, re-suspending the monitoring until a preconfigured number of additional transport blocks are received, irrespective of how many transport blocks are indicated by the scheduling configuration as being scheduled.

### Claim 7 (depends on 1)

The method of claim 1, wherein:
receiving the scheduling configuration comprises receiving the scheduling configuration during a modification period of a plurality of successive modification periods; and
the method further comprises refraining from adopting the scheduling configuration until the modification period has elapsed and the next successive modification period after the modification period has commenced.

### Claim 8 (depends on 1)

The method of claim 1, wherein the scheduling configuration further indicates a change to a semi-persistent scheduling configuration of the SC-MTCH.

### Claim 9 (depends on 8)

The method of claim 8, wherein the change to the SPS configuration comprises activation of SPS.

### Claim at position 10

10-14. (canceled)

### Claim 15

A method, performed by a network node, the method comprising:
transmitting a scheduling configuration, over a Single Cell Multicast Control Channel, that indicates whether one of a single transport block and multiple transport blocks of a Single Cell Multicast Traffic Channel are scheduled.

### Claim 16 (depends on 15)

The method of claim 15, wherein, to indicate that multiple transport blocks are scheduled, the scheduling configuration comprises a value explicitly specifying how many transport blocks are comprised in the multiple transport blocks.

### Claim 17 (depends on 15)

The method of claim 15, further comprises indicating that a preconfigured number of transport blocks are scheduled by refraining from explicitly specifying in the scheduling configuration how many transport blocks are scheduled.

### Claim 18 (depends on 15)

The method of claim 15, further comprising transmitting the scheduled transport blocks in accordance with the scheduling configuration.

### Claim 19 (depends on 18)

The method of claim 18, further comprising refraining from transmitting a further scheduling configuration within a threshold period after having transmitted the scheduled transport blocks, and in response, transmitting additional transport blocks equal to the scheduled transport blocks in number in accordance with the scheduling configuration.

### Claim 20 (depends on 18)

The method of claim 18, further comprising refraining from transmitting a further scheduling configuration within a threshold period after having transmitted the scheduled transport blocks, and in response, transmitting a preconfigured number of additional transport blocks, irrespective of how many transport blocks are indicated by the scheduling configuration.

### Claim 21 (depends on 15)

The method of claim 15, wherein:
transmitting the scheduling configuration comprises transmitting the scheduling configuration during a modification period of a plurality of successive modification periods; and
the scheduled single transport block or multiple transport blocks are scheduled to be transmitted in the next successive modification period after the modification period.

### Claim 22 (depends on 15)

The method of claim 15, wherein the scheduling configuration further indicates a change to a semi-persistent scheduling (SPS) configuration of the SC-MTCH.

### Claim 23 (depends on 22)

The method of claim 22, wherein the change to the SPS configuration comprises activation of SPS.

### Claim at position 20

24-30. (canceled)

### Claim 31

A user equipment comprising:
a processor and a memory, the memory containing instructions executable by the processor whereby the UE is configured to:
receive a scheduling configuration, over a Single Cell Multicast Control Channel, that indicates whether one of a single transport block and multiple transport blocks of a Single Cell Multicast Traffic Channel are scheduled.

### Claim at position 22

32-34. (canceled)

### Claim 35

A network node comprising:
a processor and a memory, the memory containing instructions executable by the processor whereby the network node is configured to:
transmit a scheduling configuration, over a Single Cell Multicast Control Channel, that indicates whether a single transport block or multiple transport blocks of a Single Cell Multicast Traffic Channel are scheduled.

### Claim at position 24

36-38. (canceled)
