# US 2021/0084598 A1 · Altitude dependent uplink power control

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0084598 A1
- Document ID: US20210084598A1
- Status: Published application
- Kind: A1
- Application number: 16/970,204
- Filed: 2018-10-16
- Published: 2021-03-18
- Earliest claimed: 2018-02-15
- Assignees: Telefonaktiebolaget LM Ericsson (publ)
- Applicants: Telefonaktiebolaget LM Ericsson (publ)
- Inventors: Peter ÖKVIST; Arne SIMONSSON; Tommy ARNGREN; Stefan WÄNSTEDT
- Web page: https://patentgrep.com/patent/US20210084598A1

## CPC

- H04W 52/283: {Power depending on the position of the mobile}
- G01C 5/00: Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels (G01C3/20, G01C3/30 take precedence)
- H04W 52/146: {Uplink power control}
- H04W 52/242: {taking into account path loss}
- H04W 52/243: {taking into account interferences}
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)

## Abstract

In SIB2 there is an entry containing information on PUSCH power control parameters. The current signaling entity is extended with entries that are dependent on UE operational altitude. For example, an altitude-dependent factor for the alpha parameter, or one parameter range for zero (ground level, default as per of today), one parameter range for intermediate altitude operation, and one entry for high-altitude operations, so that an airborne UE can select its appropriate power control parameters.

## Claims

### Claim at position 1

1-4. (canceled)

### Claim 5

A method performed by a base station, BS, the method comprising:
determining a UE's altitude;
obtaining a power control parameter based on the determined altitude of the UE; and
transmitting to the UE a message comprising the obtained power control parameter so that the UE can use the obtained power control parameter to calculate a power control value and then use the power control value to control an UL transmit power.

### Claim 6 (depends on 5)

The method of claim 5, wherein the power control parameter is an alpha parameter; and
obtaining the alpha parameter comprises selecting an altitude based on the determined UE's altitude and identifying an alpha parameter that is associated with the selected altitude.

### Claim 7 (depends on 5)

The method of claim 5, wherein the power control parameter is the alpha parameter; and
obtaining the alpha parameter comprises calculating: (D×altFactor)+αdef, where D is a difference between the UE's altitude and reference altitude (altRef) and αdef is a default alpha parameter.

### Claim 8

(canceled)

### Claim 9

A base station, BS, the BS being configured to:
determine a UE's altitude;
obtain a power control parameter based on the determined altitude of the UE; and
transmit to the UE a message comprising the obtained power control parameter so that the UE can use the obtained power control parameter to calculate a power control value and then use the power control value to control an UL transmit power.

### Claim 10

A method performed by a user equipment, UE, the method comprising:
determining an altitude of the UE;
calculating a power control value using the determined altitude; and
controlling a transmit power based on the calculated power control value.

### Claim 11 (depends on 10)

The method of claim 10, wherein calculating the power control value comprises:
determining a UE altitude value, UEalt, based on the determined altitude of the UE; and
calculating a value, V, equal to (altRef−UEalt), wherein altRef is a predetermined altitude reference value; and
using V to calculate the power control value.

### Claim 12 (depends on 11)

The method of claim 11, wherein using V to calculate the power control value comprises calculating V×altFactor+alpha, wherein altFactor is a predetermined altitude factor and alpha is a predetermined alpha value.

### Claim 13 (depends on 12)

The method of claim 12, further comprising the UE receiving a SIB transmitted by a base station, wherein the SIB comprises altRef, altFactor and alpha.

### Claim 14 (depends on 10)

The method of claim 10, wherein calculating the power control value comprises:
selecting an altitude based on the determined altitude of the UE;
identifying, from a set of two or more alpha values, an alpha value associated with the selected altitude; and
calculating the power control value using the identified alpha value.

### Claim 15 (depends on 14)

The method of claim 14, further comprising the UE receiving a SIB transmitted by a base station, wherein the SIB comprises the set of alpha values.

### Claim 16

A user equipment, UE, the UE being configured to:
determine an altitude of the UE;
calculate a power control value using the determined altitude; and
control a transmit power based on the calculated power control value.

### Claim 17 (depends on 5)

The method of claim 5, wherein the power control parameter is an alpha parameter.

### Claim 18 (depends on 6)

The method of claim 6, wherein selecting the altitude comprises selecting a relative altitude.

### Claim 19 (depends on 10)

The method of claim 10, wherein the power control value is PPUSCH.
