# US 2021/0084394 A1 · Fibre channel forwarder failover and load balancing system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0084394 A1
- Document ID: US20210084394A1
- Status: Published application
- Kind: A1
- Application number: 16/569,483
- Filed: 2019-09-12
- Published: 2021-03-18
- Earliest claimed: 2019-09-12
- Assignees: Dell Products L.P.
- Applicants: Dell Products L.P.
- Inventors: Ramesh Kumar Subbiah; Vibin Varghese
- Web page: https://patentgrep.com/patent/US20210084394A1

## CPC

- H04Q 11/0062: {Network aspects}
- G06F 11/2007: {using redundant communication media}
- H04B 10/03: Arrangements for fault recovery
- H04B 10/25891: {Transmission components (H04B10/40 takes precedence)}
- H04Q 2011/0081: {Fault tolerance; Redundancy; Recovery; Reconfigurability}
- H04Q 2011/0086: {Network resource allocation, dimensioning or optimisation}
- H04Q: SELECTING (switches, relays, selectors H01H; wireless communication networks H04W)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04B: TRANSMISSION

## Abstract

A Fibre Channel Forwarder (FCF) routing system includes a target device coupled to a Fibre Channel (FC) networking device via a first link, and a Fibre Channel Forwarder (FCF) device that is coupled to an initiator device via a second link, the FC networking device via a third link that is mapped to the second link, and the FC networking device via a fourth link that is mapped to the second link. The FCF device receives, via the second link, first traffic that originates from the initiator device and that is addressed to the target device. The FCF device determines, using an initiator device identifier included in the first traffic and a link mapping table, that the third link and the fourth link are mapped to the second link on which the first traffic was received and load balances the first traffic between the third link and the fourth link.

## Claims

### Claim 1

A Fibre Channel Forwarder (FCF) failover and load balancing system, comprising:
a Fibre Channel (FC) networking device;
an initiator device;
a target device coupled to the FC networking device via a first link; and
a Fibre Channel Forwarder (FCF) device that is coupled to:
the initiator device via a second link;
the FC networking device via a third link that is mapped to the second link; and
the FC networking device via a fourth link that is mapped to the second link, wherein the FCF device is configured to:
receive, via the second link, first traffic that originates from the initiator device and that is addressed to the target device;
determine, using an initiator device identifier included in the first traffic and a link mapping table, that the third link and the fourth link are mapped to the second link on which the first traffic was received; and
load balance the first traffic between the third link and the fourth link.

### Claim 2 (depends on 1)

The system of claim 1, wherein the third link and the fourth link provide different data transmission speeds.

### Claim 3 (depends on 1)

The system of claim 1, wherein the FCF device is configured to:
receive, via the second link, a fabric login (FLOGI) from the initiator device;
determine that the third link and the fourth link should be proxied for the second link;
transmit a first proxied FDISC on the third link to the FC networking device and a second proxied FDISC on the fourth link to the FC networking device;
receive a first FDISC response on the third link that includes a first FC identifier (FCID), and a second FDISC response on the fourth link that includes a second FCID; and
transmit, via the second link, a FLOGI response that includes a third FCID that is mapped to the first FCID and the second FCID in the link mapping table, wherein the third FCID is the initiator device identifier.

### Claim 4 (depends on 3)

The system of claim 3, wherein the FCF device is configured to:
generate a first mapped World Wide Name (WWN) for the first proxied FDISC;
generate a second mapped WWN for the second proxied FDISC; and
generate the link mapping table that maps the first mapped WWN and the second mapped WWN to an initiator WWN.

### Claim 5 (depends on 4)

The system of claim 4, wherein the first mapped WWN is derived from a first World Wide Port Name (WWPN) for a first node port that is included on the FCF device and that provides the third link, and wherein the second mapped WWN is derived from a second WWPN for a second node port that is included on the FCF device and that provides the fourth link.

### Claim 6 (depends on 4)

The system of claim 4, wherein the FC networking device maintains a zoning configuration with the first mapped WWN, the second mapped WWN, and a target WWN for the target device.

### Claim 7 (depends on 4)

The system of claim 4, wherein the FCF device is configured to:
snoop an FC login message that is received on the second link subsequent to the FLOGI;
modify a source identifier of the FC login message using the linking mapping table to include the first mapped WWN as the source identifier in a first proxied FC login message, and to include the second mapped WWN as the source identifier in a second proxied FC login message;
provide the first proxied FC login message on the third link and the second proxied FC login message on the fourth link;
receive a first proxied FC login response on the third link that includes the first mapped WWN as a destination identifier and a second proxied FC login response on the fourth link that includes the second mapped WWN as the destination identifier;
snoop first FC login information from the first proxied FC login response and second FC login information from the second proxied FC login response;
store the first FC login information and the second FC login information in the link mapping table; and
provide, via the second link, a third FC login response that is generated using the first FC login information, the second FC login information, and includes the initiator WWN as the destination identifier.

### Claim 8 (depends on 1)

The system of claim 1, wherein the FCF device is configured to:
determine that the third link has failed; and
provide the first traffic on the fourth link.

### Claim 9

An Information Handling System (IHS), comprising:
a communication subsystem that is coupled to:
an initiator device via a first link;
a Fibre Channel (FC) networking device via a second link that is mapped to the first link; and
the FC networking device via a third link that is mapped to the first link;
a processing system coupled to the communication subsystem; and
a memory system that is coupled to the processing system and that includes instructions that, when executed by the processing system, cause the processing system to provide a failover and load balancing engine that is configured to:
receive, via the first link, first traffic that originates from the initiator device and that is addressed to a target device coupled to the FC networking device via a fourth link;
determine, using an initiator device identifier included in the first traffic and a link mapping table, that the second link and the third link are mapped to the first link on which the first traffic was received; and
load balance the first traffic between the second link and the third link.

### Claim 10 (depends on 9)

The IHS of claim 9, wherein the failover and load balancing engine is configured to:
receive, via the first link, a fabric login (FLOGI) from the initiator device;
determine that the second link and the third link should be proxied for the first link;
transmit a first proxied FDISC on the second link to the FC networking device and a second proxied FDISC on the third link to the FC networking device;
receive a first FDISC response on the second link that includes a first FC identifier (FCID), and a second FDISC response on the third link that includes a second FCID; and
transmit, via the first link, a FLOGI response that includes a third FCID that is mapped to the first FCID and the second FCID in the link mapping table, wherein the third FCID is the initiator device identifier.

### Claim 11 (depends on 10)

The IHS of claim 10, wherein the failover and load balancing engine is configured to:
generate a first mapped World Wide Name (WWN) for the first proxied FDISC;
generate a second mapped WWN for the second proxied FDISC; and
generate the link mapping table that maps the first mapped WWN and the second mapped WWN to an initiator WWN.

### Claim 12 (depends on 11)

The IHS of claim 11, wherein the first mapped WWN is derived from a first World Wide Port Name (WWPN) for a first node port that is included on the communication subsystem and that provides the second link, and wherein the second mapped WWN is derived from a second WWPN for a second node port that is included on the communication subsystem and that provides the third link.

### Claim 13 (depends on 11)

The IHS of claim 11, wherein the failover and load balancing engine is configured to:
snoop an FC login message that is received on the first link subsequent to the FLOGI;
modify a source identifier of the FC login message using the linking mapping table to include the first mapped WWN as the source identifier in a first proxied FC login message, and to include the second mapped WWN as the source identifier in a second proxied FC login message;
provide the first proxied FC login message on the second link and the second proxied FC login message on the third link;
receive a first proxied FC login response on the second link that includes the first mapped WWN as a destination identifier and a second proxied FC login response on the third link that includes the second mapped WWN as the destination identifier;
snoop first FC login information from the first proxied FC login response and second FC login information from the second proxied FC login response;
store the first FC login information and the second FC login information in the link mapping table; and
provide, via the second link, a third FC login response that is generated using the first FC login information, the second FC login information, and includes the initiator WWN as the destination identifier.

### Claim 14 (depends on 9)

The IHS of claim 9, wherein the failover and load balancing engine is configured to:
determine that the second link has failed; and
provide the first traffic on the third link.

### Claim 15

A method providing uplink failover, comprising:
receiving, by a Fibre Channel Forwarder (FCF) device via a first link coupled to an initiator device, first traffic that originates from the initiator device and that is addressed to a target device coupled to a Fibre Channel (FC) networking device via a second link;
determining, by the FCF device using an initiator device identifier included in the first traffic and a link mapping table, that a third link that couples the FCF device to the FC networking device and a fourth link that couples the FCF device to the FC networking device are mapped to the first link on which the first traffic was received; and
routing, by the FCF device, a first portion of the first traffic on the third link and a second portion of the first traffic on the fourth link.

### Claim 16 (depends on 15)

The method of claim 15, further comprising:
receiving, by the FCF device via the first link, a fabric login (FLOGI) from the initiator device;
determining, by the FCF device, that the second link and the third link should be proxied for the first link;
transmitting, by the FCF device, a first proxied FDISC on the second link to the FC networking device and a second proxied FDISC on the third link to the FC networking device;
receiving, by the FCF device, a first FDISC response on the second link that includes a first FC identifier (FCID), and a second FDISC response on the third link that includes a second FCID; and
transmitting, by the FCF device and via the first link, a FLOGI response that includes a third FCID that is mapped to the first FCID and the second FCID in the link mapping table, wherein the third FCID is the initiator device identifier.

### Claim 17 (depends on 16)

The method of claim 16, further comprising:
generating, by the FCF device, a first mapped World Wide Name (WWN) for the first proxied FDISC;
generating, by the FCF device, a second mapped WWN for the second proxied FDISC; and
generating, by the FCF device, the link mapping table that maps the first mapped WWN and the second mapped WWN to an initiator WWN.

### Claim 18 (depends on 17)

The method of claim 17, wherein the first mapped WWN is derived from a first World Wide Port Name (WWPN) for a first node port that is included on the FCF device and that provides the second link, and wherein the second mapped WWN is derived from a second WWPN for a second node port that is included on the FCF device and that provides the third link.

### Claim 19 (depends on 17)

The method of claim 17, further comprising:
snooping, by the FCF device, an FC login message that is received on the first link subsequent to the FLOGI;
modifying, by the FCF device, a source identifier of the FC login message using the linking mapping table to include the first mapped WWN as the source identifier in a first proxied FC login message, and to include the second mapped WWN as the source identifier in a second proxied FC login message;
providing, by the FCF device, the first proxied FC login message on the second link and the second proxied FC login message on the third link;
receiving, by the FCF device, a first proxied FC login response on the second link that includes the first mapped WWN as a destination identifier and a second proxied FC login response on the third link that includes the second mapped WWN as the destination identifier;
snooping, by the FCF device, first FC login information from the first proxied FC login response and second FC login information from the second proxied FC login response;
storing, by the FCF device, the first FC login information and the second FC login information in the link mapping table; and
providing, by the FCF device and via the second link, a third FC login response that is generated using the first FC login information, the second FC login information, and includes the initiator WWN as the destination identifier.

### Claim 20 (depends on 15)

The method of claim 15, further comprising:
determining, by the FCF device, that the second link has failed; and
providing, by the FCF device, the first traffic on the third link.
