# US 2021/0083482 A1 · Apparatus and methods for soft grid interconnection of distributed generation assets

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0083482 A1
- Document ID: US20210083482A1
- Status: Published application
- Kind: A1
- Application number: 17/048,461
- Filed: 2019-04-12
- Published: 2021-03-18
- Earliest claimed: 2018-04-19
- Assignees: Flexgen Power Systems, Inc.
- Applicants: Flexgen Power Systems, Inc.
- Inventors: Pasi Taimela; Robert William Johnson
- Web page: https://patentgrep.com/patent/US20210083482A1

## CPC

- H02J 3/381: {Dispersed generators}
- H02J 3/007: Arrangements for selectively connecting one or more loads to one or more power sources or power lines
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 9/068: {Electronic means for switching from one power supply to another power supply, e.g. to avoid parallel connection}
- H02J 3/40: Synchronisation of generators for connection to a network or to another generator
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

A system includes a break-before-make automatic transfer switch (ATS) configured to selectively couple a utility grid and at least one distributed generator (e.g., a plurality of paralleled generators) to a load bus such that, in a state transition of the ATS, the utility grid and the at least one distributed generator are both disconnected from the load bus before the utility grid or the at least one distributed generator is connected to the load bus. The system further includes at least one converter configured to be coupled to the load bus and configured to provide power to the load bus during the state transition of the ATS.

## Claims

### Claim 1

A system comprising:
a break-before-make automatic transfer switch (ATS) configured to selectively couple a utility grid and at least one distributed generator to a load bus such that, in a slate transition of the ATS, the utility grid and the at least one distributed generator are both disconnected from the load bus before the utility grid or the at least one distributed generator is connected to the load bus; and
least one converter configured to be coupled to the load bus and configured to provide power to the load bus during the state transition of the ATS.

### Claim 2 (depends on 1)

The system of claim 1, wherein the at least one converter is configured to provide power to the load bus from the utility grid during the state transition of the ATS.

### Claim 3 (depends on 2)

The system of claim 2, wherein the at least one converter comprises:
a first converter having a first port configured to be coupled to the utility grid; and
a second converter having a first port coupled to a second port of the first converter by a DC bus and a second port configured to be coupled to the load bus.

### Claim 4 (depends on 3)

The system of claim 3, wherein the first and second converters are bidirectional and support transfer of power from the at least one distributed generator to the utility grid.

### Claim 5 (depends on 1)

The system of claim 1, wherein the at least one converter is configured to provide power to the load bus from an energy storage device during the state transition of the ATS.

### Claim 6 (depends on 1)

The system of claim 1, wherein the at least one generator comprises a plurality of distributed generators coupled to the ATS by a common bus.

### Claim 7 (depends on 1)

The system of claim 1, wherein the at least one converter is bidirectional and supports transfer of power from the at least one distributed generator to the utility grid.

### Claim 8 (depends on 1)

The system of claim 1, wherein the at least one converter is configured to commence providing power to the load bus before the state transition when the utility grid is connected to the load bus via the ATS, to continue providing power to the load bus through the state transition, and to gradually cease providing power to the load bus after the state transition when the at least one distributed generator is connected to the load bus via the ATS.

### Claim 9 (depends on 8)

The system of claim 8, wherein the at least one converter is further configured to provide power to the load responsive to an unavailability of the at least one distributed generator after the state transition.

### Claim 10 (depends on 1)

The system of claim 1, wherein the at least one converter is configured to commence providing power to the load bus before the state transition while the at least one distributed generator is connected to the load bus via the ATS, to continue providing power to the load bus through the state transition, and to gradually cease providing power to the load bus after the state transition when the utility grid is connected to the load bus via the ATS.

### Claim 11

A method comprising:
operating a break-before-make automatic transfer switch (ATS) that is configured to selectively couple a utility grid and at least one distributed generator to a load bus to provide a state transition in which the utility grid and the at least one distributed generator are both disconnected from the load bus before the utility grid or the at least one distributed generator is connected to the load bus; and
operating at least one converter coupled to the load bus to provide power to the load bus during the state transition of the ATS.

### Claim 12 (depends on 11)

The method of claim 11, comprising:
commencing provision of power to the load bus using the at least one converter before the state transition when the utility grid is connected to the load bus via the ATS:
providing power to the load bus using the at least one converter through the state transition; and
gradually ceasing provision of power to the load bus using the at least one converter after the state transition when the at least one distributed generator is connected to the load bus via the ATS.

### Claim 13 (depends on 12)

The method of claim 12, further comprising providing power to the load using the at least one converter in the event of an unavailability of the at least one distributed generator after the state transition.

### Claim 14 (depends on 11)

The method of claim 11, comprising:
commencing provision of power to the load bus using the at least one converter before the state transition while the at least one distributed generator is connected to the load bus via the ATS;
providing power to the load bus using the at least one converter through the state transition; and
gradually ceasing provision of power to the load bus using the at least one converter after the state transition when the utility grid is connected to the load bus via the ATS.

### Claim 15

A system comprising:
at least one distributed generator;
a switch configured to connect the at least one generator to a load bus; and
a converter coupled between a utility grid and the load bus and configured to provide power to the load bus from the utility grid while the at least one distributed generator is connected to the load bus and providing power thereto.

### Claim 16

A system comprising:
a first switch configured to couple a utility grid to a load bus via an inductor;
a second switch configured to be coupled at least one distributed generator to the load bus; and
at least one converter configured to be coupled to the load bus and configured to provide power thereto to support a first mode in which the first and second switches are closed, a second mode in which the first switch is open and the second switch is closed and a third mode in which the first switch is closed and the second switch is open.

### Claim 17 (depends on 16)

The system of claim 16, wherein the at least one converter is configured to support bidirectional power transfers between the utility grid and the load bus in the first mode.

### Claim 18 (depends on 16)

The system of claim 16, wherein the at least one converter is configured to provide voltage and transient load response support in the second and third modes.