# US 2021/0083476 A1 · Recurring fault protection for wind power plants

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0083476 A1
- Document ID: US20210083476A1
- Status: Published application
- Kind: A1
- Application number: 16/956,880
- Filed: 2018-11-20
- Published: 2021-03-18
- Earliest claimed: 2017-12-20
- Assignees: Vestas Wind Systems A/S
- Applicants: Vestas Wind Systems A/S
- Inventors: Manoj GUPTA; Janakiraman SIVASANKARAN
- Web page: https://patentgrep.com/patent/US20210083476A1

## CPC

- H02H 3/06: with automatic reconnection
- G05B 13/026: {using a predictor}
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 3/381: {Dispersed generators}
- H02J 3/472: {for selectively connecting the AC sources in a particular order, e.g. sequential, alternating or subsets of sources}
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02P 9/02: Details {of the control}
- H02H 7/06: for dynamo-electric generators; for synchronous capacitors
- H02J 3/48: Controlling the sharing of active power
- H02J 3/50: Controlling the sharing of reactive power
- H02J 2101/28: Wind energy
- H02J 2105/16: being internal to power sources or power generation plants
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02P: CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS

## Abstract

A method for operating a wind turbine generator connected to a power network to account for recurring voltage faults on the power network caused by automatic reclosure of at least one circuit breaker following a short-circuit. The method comprises: identifying a deviation of voltage level of the power network from a normal operational voltage level of the network; determining that the identified deviation fulfils criteria for automatic reclosure; and operating the wind turbine generator in a recurring fault mode if automatic reclosure criteria are fulfilled. When operating the wind turbine generator in recurring fault mode, the method comprises: monitoring the recovery of the voltage level from the deviation; categorising the recovery of the voltage as one of at least a strong recovery or a weak recovery; and implementing a ride-through protocol according to the category of recovery.

## Claims

### Claim 1

A method for operating a wind turbine generator connected to a power network to account for recurring voltage faults on the power network caused by automatic reclosure of at least one circuit breaker following a short-circuit, the method comprising:
identifying a deviation of voltage level of the power network from a normal operational voltage level of the network;
determining that the identified deviation fulfils criteria for automatic reclosure; and
operating the wind turbine generator in a recurring fault mode if automatic reclosure criteria are fulfilled, wherein in operating the wind turbine generator in recurring fault mode, the method comprises:
monitoring the recovery of the voltage level from the deviation;
categorising the recovery of the voltage as one of at least a strong recovery or a weak recovery; and
implementing a ride-through protocol according to the category of recovery.

### Claim 2 (depends on 1)

The method of claim 1, wherein the deviation comprises a power network fault, and determining that the deviation fulfils criteria for automatic reclosure comprises comparing the voltage levels following the fault with a predetermined reclosure threshold.

### Claim 3 (depends on 1)

The method of claim 1, wherein categorising the recovery of the voltage comprises applying one or more tests to the recovery such that the recovery is categorised as strong recovery if it passes the or each test and is categorised as weak recovery if it does not pass one or more of the tests.

### Claim 4 (depends on 3)

The method of claim 3, wherein the at least one test comprises comparing the voltage level with a first voltage threshold, and wherein the test is passed if the voltage level exceeds the first voltage threshold in a predetermined first time period.

### Claim 5 (depends on 4)

The method of claim 4, wherein the at least one test comprises comparing the voltage level with a second voltage threshold, and wherein the test is passed if the voltage level exceeds the second voltage threshold in a predetermined second time period.

### Claim 6 (depends on 5)

The method of claim 5, wherein the second voltage threshold is greater than the first voltage threshold.

### Claim 7 (depends on 5)

The method of claim 5, wherein the first and second time periods are concurrent and of equal length.

### Claim 8 (depends on 5)

The method of claim 5, wherein the at least one test comprises comparing the voltage level with a third voltage threshold and performing a count of the number of times that the voltage level is equal to the third voltage threshold within a third predetermined time period, and wherein the test is passed if the count is zero or an even number.

### Claim 9 (depends on 8)

The method of claim 8, wherein the second and third voltage thresholds are the same.

### Claim 10 (depends on 8)

The method of claim 8, wherein the third time period follows at least one of the first time period or the second time period.

### Claim 11 (depends on 1)

The method of claim 1 comprising:
determining that the voltage deviation fulfils low-voltage criteria; and
entering a low-voltage mode if the low-voltage criteria are fulfilled, the low-voltage mode being configured to run concurrently with the recurring fault mode, wherein:
if the voltage recovery is categorised as weak recovery, the step of implementing a ride-through protocol comprises terminating the recurring-fault mode and operating the wind turbine generator in low-voltage mode only.

### Claim 12 (depends on 1)

The method of claim 1 comprising:
determining that the deviation fulfils low-voltage criteria;
entering a low-voltage mode if the low-voltage criteria are fulfilled, the low-voltage mode being configured to run concurrently with the recurring-fault mode, and wherein:
if the voltage recovery is categorised as strong recovery, the step of implementing a ride-through protocol comprises altering the low-voltage mode to account for a subsequent voltage dip.

### Claim 13 (depends on 12)

The method of claim 12, wherein altering the low-voltage mode comprises restarting the low-voltage mode before automatic reclosure to prevent the wind turbine generator from being disconnected in the event of another voltage deviation.

### Claim 14 (depends on 1)

The method of claim 1 comprising identifying a further voltage deviation and operating the wind turbine generator in recurring fault mode in relation to the further voltage deviation.

### Claim 15 (depends on 1)

The method of claim 1 comprising terminating recurring fault mode if the voltage levels return to normal operational levels.

### Claim 16

(canceled)

### Claim 17

A computer program product downloadable from a communication network and/or stored on a machine readable medium, comprising program code instructions for implementing an operation of a wind turbine generator connected to a power network to account for recurring voltage faults on the power network caused by automatic reclosure of at least one circuit breaker following a short-circuit, the operation comprising:
identifying a deviation of voltage level of the power network from a normal operational voltage level of the network;
determining that the identified deviation fulfils criteria for automatic reclosure; and
operating the wind turbine generator in a recurring fault mode if automatic reclosure criteria are fulfilled, wherein in operating the wind turbine generator in recurring fault mode, wherein the operating comprises:
monitoring the recovery of the voltage level from the deviation;
categorising the recovery of the voltage as one of at least a strong recovery or a weak recovery; and
implementing a ride-through protocol according to the category of recovery.

### Claim 18

An apparatus, comprising:
a wind turbine generator connected to a power network; and
a wind turbine controller configured to perform an operation of the wind turbine generator to account for recurring voltage faults on the power network caused by automatic reclosure of at least one circuit breaker following a short-circuit, the operation comprising:
identifying a deviation of voltage level of the power network from a normal operational voltage level of the network;
determining that the identified deviation fulfils criteria for automatic reclosure; and
operating the wind turbine generator in a recurring fault mode if automatic reclosure criteria are fulfilled, wherein in operating the wind turbine generator in recurring fault mode, wherein the operating comprises:
monitoring the recovery of the voltage level from the deviation;
categorising the recovery of the voltage as one of at least a strong recovery or a weak recovery; and
implementing a ride-through protocol according to the category of recovery.