# US 2021/0083475 A1 · System operation support device and method in power system, and wide-area monitoring protection control system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0083475 A1
- Document ID: US20210083475A1
- Status: Published application
- Kind: A1
- Application number: 16/618,816
- Filed: 2018-04-10
- Published: 2021-03-18
- Earliest claimed: 2017-07-07
- Assignees: Hitachi, Ltd.
- Applicants: Hitachi, Ltd.
- Inventors: Kenta KIRIHARA; Sumito TOBE; Masahiro YATSU; Hiroo HORII; Jun YAMAZAKI
- Web page: https://patentgrep.com/patent/US20210083475A1

## CPC

- H02J 3/001: Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/0075: {for providing alternative feeding paths between load and source according to economic or energy efficiency considerations, e.g. economic dispatch}
- H02J 13/10: characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- Y04S 10/40: Display of information, e.g. of data or controls
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A system operation support device in a power system stabilizes the power system and has a predicted accident time system state calculation unit that receives measured data, a system topology, and a target accident type as inputs, and calculates a system state and a predicted accident time system state. A control menu calculation unit receives the results of the predicted accident time system state as inputs and calculates a control menu. A restoration control means calculation unit receives the result of the control menu calculation as an input and calculates a restoration control procedure. A restoration prevention control procedure calculation unit receives the result of the restoration control and a target restoration time parameter as inputs and performs a power generator output adjustment time simulation, a necessary prevention control amount calculation, and a prevention control procedure calculation. A display unit displays the restoration control procedure and the prevention control procedure.

## Claims

### Claim 1

A system operation support device that stabilizes a power system, the system operation support device comprising:
a predicted accident time system state calculation unit that receives measured data, a system topology and a target accident type as inputs and calculates a system state and a predicted accident time system state;
a control menu calculation unit that receives a result of the predicted accident time system state calculation unit as an input and calculates a control menu;
a restoration control method calculation unit that receives a result of the control menu calculation unit as an input and calculates a restoration control procedure;
a restoration prevention control procedure calculation unit that receives a result of the restoration control method calculation unit and a target restoration time parameter as inputs and performs a power generator output adjustment time simulation, a necessary prevention control amount calculation, and a prevention control procedure calculation; and
a display unit that displays the restoration control procedure and a prevention control procedure.

### Claim 2 (depends on 1)

The system operation support device in the power system according to claim 1, wherein
the predicted accident time system state calculation unit uses one or more of a model-based method using a system model based on a system state and a measurement-based method using measured data only.

### Claim 3 (depends on 1)

The system operation support device in the power system according to claim 1, wherein
the predicted accident time system state calculation unit includes one or more of a local prediction using a sensitivity calculation and a prediction based on a similar result from an accumulation analysis result using a similar example search method.

### Claim 4 (depends on 1)

The system operation support device in the power system according to claim 1, wherein
the predicted accident time system state calculation unit includes a system state estimation unit that receives the measured data and the system topology as inputs and estimates a system state, an event alarm creation unit that receives the measured data as an input and creates an event alarm, a simulation method selection unit that receives the event alarm as an input, and a predicted accident time system state estimation unit that receives a state estimation result of the system state estimation unit, a result of the simulation method selection unit, and a target accident type as inputs and calculates the predicted accident time system state and the system state.

### Claim 5 (depends on 1)

A wide-area monitoring protection control system using the system operation support device in the power system according to claim 1, the wide-area monitoring protection control system comprising:
a control instruction creation device that receives outputs of the system operation support device and an event alarm as inputs and creates a control instruction;
a control instruction confirmation device that receives measured data and a result of the control instruction creation device as inputs and confirms a control instruction;
a control target that is controlled by receiving a control instruction confirmation signal from the control instruction confirmation device as an input; and
a control log creation device that creates a control log based on a result of the control target.

### Claim 6

A system operation support method in a power system that stabilizes the power system, the system operation support method comprising:
calculating a system state and a predicted accident time system state by receiving measured data, a system topology, and a target accident type as inputs;
calculating a control menu based on a calculation result of the system state and the predicted accident time system state;
calculating a restoration control procedure by receiving the control menu as an input;
performing a power generator output adjustment time simulation, a necessary prevention control amount calculation, and a prevention control procedure calculation by receiving the restoration control procedure and a target restoration time parameter as inputs; and
outputting the restoration control procedure and a prevention control procedure.

### Claim at position 7

-10. (canceled)