# US 2021/0081870 A1 · System and method for supporting production management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0081870 A1
- Document ID: US20210081870A1
- Status: Published application
- Kind: A1
- Application number: 16/643,918
- Filed: 2019-07-09
- Published: 2021-03-18
- Earliest claimed: 2019-07-09
- Assignees: Hitachi, Ltd.
- Applicants: Hitachi, Ltd.
- Inventors: Kenichirou KAWAKAMI; Shigeyasu KUBO; Kazuhiro MATSUYA; Yusuke YAJIMA
- Web page: https://patentgrep.com/patent/US20210081870A1

## CPC

- G06Q 10/06316: {Sequencing of tasks or work}
- G05B 19/418: Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G06Q 10/063114: {Status monitoring or status determination for a person or group}
- G06Q 10/06313: {Resource planning in a project environment}
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- Y02P 90/30: Computing systems specially adapted for manufacturing
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Regardless of the production method applied, it is possible for a user to estimate a factor that causes trouble in one of the resources belonging to a resource type. A supporting system refers to management information indicating a production past record of the production system, and displays an overlay chart in which a diagram chart is relatively superimposed on a Gantt chart. The Gantt chart is a chart for a first resource type and has a resource axis and a time axis. The diagram chart is for a second resource type. In the overlay chart, a polygonal line connecting a plurality of points corresponding to a second resource, belonging to the second resource type, is on the Gantt chart, and each point is plotted at a position corresponding to an execution time of a step and a first resource, belonging to the first resource type, related to the step.

## Claims

### Claim 1

A production management supporting system, comprising:
an interface portion including one or more interfaces;
a storing portion including one or more memories configured to store management information including information indicating a production past record of a production system having a plurality of steps; and
a processor portion coupled to the interface portion and to the storing portion, wherein
as a plurality of resource types related to production, there are two or more resource types of Man, Machine, and Material,
the management information indicates, for each of the plurality of resource types, for each resource belonging to the resource type, a step performed on the resource, an execution time of the step, and one or more resources belonging to, respectively, one or more resource types different from the resource type to which the resource belongs and related to the resource,
the processor portion displays an overlay chart that is a chart in which a diagram chart is relatively superimposed on a Gantt chart,
the Gantt chart is a chart generated by the processor portion on the basis of the management information for a first resource type of the plurality of resource types and has a resource axis that is an axis corresponding to resources, and a time axis that is an axis orthogonal to the resource axis and corresponding to time,
the diagram chart is a chart generated by the processor portion on the basis of the management information for a second resource type of the plurality of resource types,
in the overlay chart,
for each of a plurality of first resources that is a plurality of resources belonging to the first resource type, when at least a part of an execution time zone of the first resource is included in a display target period that is a period covered by the time axis, the Gantt chart includes an execution zone that is a zone representing the at least a part of the time zone, and
for each of a plurality of second resources that is a plurality of resources belonging to the second resource type, there is a polygonal line connecting a plurality of points corresponding to the second resource on the Gantt chart, and each of the plurality of points is plotted at a position that corresponds to an execution time of a step performed on the second resource and the first resource related to the second resource and the step.

### Claim 2 (depends on 1)

The production management supporting system according to claim 1, wherein the processor portion
receives a selection of the first resource type from a user, generates the Gantt chart for the first resource type on the basis of the management information, displays the Gantt chart; and
superimposes, on the displayed Gantt chart, the diagram chart having a plurality of polygonal lines corresponding to respective second resources belonging to the selected second resource type.

### Claim 3 (depends on 2)

The production management supporting system according to claim 2, wherein
the management information includes pattern information that is information indicating one or more condition sets,
each condition set is a set of a first condition and a second condition,
for each condition set,
the first condition in the condition set is a condition for at least one of a time of an inter-step range and a time of an intra-step range for any of the resource types,
the second condition in the condition set is a condition for at least one of a time of an inter-step range and a time of an intra-step range for a resource type different from the resource type corresponding to the first condition in the condition set,
the selected second resource type is a resource type automatically selected by the processor portion on the basis of the pattern information, and is a resource type that satisfies the second condition in the condition set including the first condition satisfied by the first resource type.

### Claim 4 (depends on 1)

The production management supporting system according to claim 1, wherein
the management information includes pattern information that is information indicating one or more condition sets,
each condition set is a set of a first condition and a second condition,
for each condition set,
the first condition in the condition set is a condition for at least one of a time of an inter-step range and a time of an intra-step range for any of the resource types,
the second condition in the condition set is a condition for at least one of a time of an inter-step range and a time of an intra-step range for a resource type different from the resource type corresponding to the first condition in the condition set,
the processor portion
determines whether any one of the condition sets is satisfied for the first resource type and the second resource type on the basis of the management information; and
accentuates, when a result of determination is true, a portion corresponding to information that satisfies any one of the condition sets in the overlay chart.

### Claim 5 (depends on 1)

The production management supporting system according to claim 1, wherein
the management information includes pattern information that is information indicating one or more condition sets,
each condition set is a set of a first condition and a second condition,
for each condition set,
the first condition in the condition set is a condition for at least one of a time of an inter-step range and a time of an intra-step range for any of the resource types,
the second condition in the condition set is a condition for at least one of a time of an inter-step range and a time of an intra-step range for a resource type different from the resource type corresponding to the first condition in the condition set,
the processor portion performs a display target determination process that is a process of determining an overlay chart to be displayed,
the display target determination process includes, for each of one or more resource types out of the plurality of resource types,
selecting the resource type as the first resource type;
selecting each of one or more resource types other than the selected first resource type as the second resource type;
determining, on the basis of the management information, whether any of the condition sets is satisfied for the selected first resource type and the selected second resource type; and
for a result of determination being true, determining as a candidate, an overlay chart in which a diagram chart for the selected second resource type is superimposed on a Gantt chart for the selected first resource type, and
the processor portion, when one or more candidates have been determined in the display target determination process, displays an overlay chart as one of the one or more candidates.

### Claim 6 (depends on 1)

The production management supporting system according to claim 1, wherein
when the management information includes information indicating that an event has occurred at a time belonging to the display target period for a resource belonging to a third resource type, an object representing the event is placed at a position corresponding to the time when the event occurred in at least one of the Gantt chart and the diagram chart in the overlay chart.

### Claim 7 (depends on 6)

The production management supporting system according to claim 6, wherein
when a relationship between a past record of a resource belonging to the first resource type and a past record of a resource belonging to the second resource type does not satisfy a predetermined condition, the processor portion superimposes an object representing an event for a resource belonging to the third resource type on at least one of the Gantt chart and the diagram chart.

### Claim 8 (depends on 1)

The production management supporting system according to claim 1, wherein
the management information includes, for each of the plurality of resource types, information indicating an execution plan for each resource belonging to the resource type, and
when the processor portion specifies, for at least one of the first resource type and the second resource type, a resource having a deviation of equal to or more than a fixed value between a past record and a plan on the basis of the management information, the processor portion accentuates a portion corresponding to the time zone of the resource.

### Claim 9 (depends on 1)

The production management supporting system according to claim 1, wherein
the processor portion calculates a retention number at each time,
the retention number at each time, for each facility, is the number of products retaining at the time, and
in the overlay chart, at least a part of a display mode of the Gantt chart and the diagram chart depends on the calculated retention number.

### Claim 10 (depends on 1)

The production management supporting system according to claim 1, wherein
the management information includes information indicating a planned step and a planned execution time zone for each product, information indicating a relationship between a product and a part, and information indicating a plan and a past record of arrangement of each part,
the first resource type is Material, and
the processor portion performs, on a Gantt Chart for Material for a product having an execution time that is delayed from a planned execution time zone out of products belonging to Material, at least one of the following:
placing, when a current time is later than a start time of a planned execution time zone for the product, and at least one part of the product has not been served in a predetermined location at the current time, an object representing a part shortage at a position corresponding to the product and the current time in the Gantt chart for Material or in the vicinity of the position;
placing, when all the parts of the product are served in the predetermined location, an object representing completion of serving at a position corresponding to the product and the time when the serving of all parts was completed in the Gantt chart for Material or in the vicinity of the position; and
placing an object representing a state transition to a final state indicating completion of serving for a part that has not been served yet at a start time of a planned execution time zone and a relationship between the number of parts and the time in each state, at a position corresponding to the product and a time earlier than the start time of the execution time zone for the product in the Gantt chart for Material or in the vicinity of the position.

### Claim 11

A production management supporting method comprising:
referring to management information including information indicating a production past record of a production system having a plurality of steps; and
displaying an overlay chart that is a chart in which a diagram chart is relatively superimposed on a Gantt chart,
wherein as a plurality of resource types related to production, there are two or more resource types of Man, Machine, and Material,
the management information indicates, for each of the plurality of resource types, for each resource belonging to the resource type, a step performed on the resource, an execution time of the step, and one or more resources belonging to, respectively, one or more resource types different from the resource type to which the resource belongs and related to the resource,
the Gantt chart is a chart generated on the basis of the management information referred to for a first resource type of the plurality of resource types and has a resource axis that is an axis corresponding to resources, and a time axis that is an axis orthogonal to the resource axis and corresponding to time,
the diagram chart is a chart generated on the basis of the management information referred to for a second resource type of the plurality of resource types,
in the overlay chart,
for each of a plurality of first resources that is a plurality of resources belonging to the first resource type, when at least a part of an execution time zone of the first resource is included in a display target period that is a period covered by the time axis, the Gantt chart includes an execution zone that is a zone representing the at least a part of the time zone, and
for each of a plurality of second resources that is a plurality of resources belonging to the second resource type, there is a polygonal line connecting a plurality of points corresponding to the second resource on the Gantt chart, and each of the plurality of points is plotted at a position that corresponds to an execution time of a step performed on the second resource and the first resource related to the second resource and the step.

### Claim 12

A computer program for causing a computer to perform:
referring to management information including information indicating a production past record of a production system having a plurality of steps; and
displaying an overlay chart that is a chart in which a diagram chart is relatively superimposed on a Gantt chart, wherein
as a plurality of resource types related to production, there are two or more resource types of Man, Machine, and Material,
the management information indicates, for each of the plurality of resource types, for each resource belonging to the resource type, a step performed on the resource, an execution time of the step, and one or more resources belonging to, respectively, one or more resource types different from the resource type to which the resource belongs and related to the resource,
the Gantt chart is a chart generated on the basis of the management information referred to for a first resource type of the plurality of resource types and has a resource axis that is an axis corresponding to resources, and a time axis that is an axis orthogonal to the resource axis and corresponding to time,
the diagram chart is a chart generated on the basis of the management information referred to for a second resource type of the plurality of resource types,
in the overlay chart,
for each of a plurality of first resources that is a plurality of resources belonging to the first resource type, when at least a part of an execution time zone of the first resource is included in a display target period that is a period covered by the time axis, the Gantt chart includes an execution zone that is a zone representing the at least a part of the time zone, and
for each of a plurality of second resources that is a plurality of resources belonging to the second resource type, there is a polygonal line connecting a plurality of points corresponding to the second resource on the Gantt chart, and each of the plurality of points is plotted at a position that corresponds to an execution time of a step performed on the second resource and the first resource related to the second resource and the step.