# US 2021/0081859 A1 · Architecture, engineering and construction (aec) risk analysis system and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0081859 A1
- Document ID: US20210081859A1
- Status: Published application
- Kind: A1
- Application number: 17/103,765
- Filed: 2020-11-24
- Published: 2021-03-18
- Earliest claimed: 2017-06-01
- Assignees: Autodesk, Inc.
- Applicants: Autodesk, Inc.
- Inventors: Shubham Goel; Charis Kaskiris; Patricia Keaney; Anand Rajagopal; Manu Venugopal
- Web page: https://patentgrep.com/patent/US20210081859A1

## CPC

- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06F 18/2113: by ranking or filtering the set of features, e.g. using a measure of variance or of feature cross-correlation
- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06N 3/0464: Convolutional networks [CNN, ConvNet]
- G06N 3/0895: Weakly supervised learning, e.g. semi-supervised or self-supervised learning
- G06N 3/09: Supervised learning
- G06N 5/046: Forward inferencing; Production systems
- G06N 20/00: Machine learning
- G06Q 10/0633: Workflow analysis
- G06Q 10/06334: {using forecasting or predicting}
- G06Q 10/06395: {Quality analysis or management}
- G06Q 50/08: Construction
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A system and method provide the ability to control an architecture, engineering, and construction (AEC) project workflow. AEC data regarding a quality of construction is obtained. A set of classifiers and machine learning models are obtained. The AEC data is augmented based on the set of classifiers and machine learning models. A risk metric is generated for one or more issues in the AEC data based on the augmented AEC data. The risk metric is interactively generated and presented on a display device. Work, project resourcing, and/or training are prioritized based on the risk metric.

## Claims

### Claim 1

A computer-implemented method for controlling an architecture, engineering, and construction (AEC) project workflow, comprising:
(a) obtaining an issue risk classification machine learning model, wherein the issue risk classification machine learning model predicts a risk level and a risk category for individual construction related issues;
(b) obtaining a subcontractor machine learning model, wherein:
(i) a subcontractor generates or addresses one or more of the individual construction related issues;
(ii) the subcontractor machine learning model utilizes output from the issue risk classification machine learning model as input;
(iii) the subcontractor machine learning model analyzes the output from the issue risk classification machine learning model to generate a subcontractor risk metric; and
(c) using the subcontractor risk metric to prioritize work and time on a construction site.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the risk level is classified as high, medium, or low.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, wherein the risk category is selected from a group consisting of Water, Rework, Inspection, and High Value.

### Claim 4 (depends on 1)

The computer-implemented method of claim 1, wherein the issue risk classification machine learning model is developed based on augmented labelled data and a feedback loop that accepts user input that is used to update the issue risk classification machine learning model.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein the subcontractor machine learning model predicts the subcontractor risk metric based on project data and ranks subcontractors based on which subcontractor needs the most attention on a specific day.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein:
the subcontractor risk metric comprises a daily rating and a cumulative rating; and
the daily rating and cumulative rating are based on a volume, frequency, and recency of the individual construction related issues.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, further comprising displaying a visualization of the subcontractor risk metric that is used to prioritize the work and time on the construction site

### Claim 8 (depends on 7)

The computer-implemented method of claim 7, wherein the visualization comprises a risk heat map view of subcontractor risk levels over time, wherein the heatmap is used to further compare and hire subcontractors.

### Claim 9 (depends on 1)

The computer-implemented method of claim 1, wherein the subcontractor risk metric comprises a label of a risk-level tag that is representative of an amount of work the subcontractor is currently accountable for and a track record of the subcontractor on a project.

### Claim 10 (depends on 1)

The computer-implemented method of claim 1, wherein:
the subcontractor machine learning model augments the risk level and risk category with augmented information based on how the individual construction related issues are described; and
the subcontractor machine learning model uses the augmented information to evaluate subcontractor performance.

### Claim 11

A system for controlling an architecture, engineering, and construction (AEC) project workflow, comprising:
(a) a computer;
(b) a processor executing on the computer;
(c) the memory storing a set of instructions, wherein the set of instructions, when executed by the processor cause the processor to perform operations comprising:
(a) obtaining an issue risk classification machine learning model, wherein the issue risk classification machine learning model predicts a risk level and a risk category for individual construction related issues;
(b) obtaining a subcontractor machine learning model, wherein:
(i) a subcontractor generates or addresses one or more of the individual construction related issues;
(ii) the subcontractor machine learning model utilizes output from the issue risk classification machine learning model as input;
(iii) the subcontractor machine learning model analyzes the output from the issue risk classification machine learning model to generate a subcontractor risk metric; and
(c) using the subcontractor risk metric to prioritize work and time on a construction site.

### Claim 12 (depends on 11)

The computer-implemented system of claim 11, wherein the risk level is classified as high, medium, or low.

### Claim 13 (depends on 11)

The computer-implemented system of claim 11, wherein the risk category is selected from a group consisting of Water, Rework, Inspection, and High Value.

### Claim 14 (depends on 11)

The computer-implemented system of claim 11, wherein the issue risk classification machine learning model is developed based on augmented labelled data and a feedback loop that accepts user input that is used to update the issue risk classification machine learning model.

### Claim 15 (depends on 11)

The computer-implemented system of claim 11, wherein the subcontractor machine learning model predicts the subcontractor risk metric based on project data and ranks subcontractors based on which subcontractor needs the most attention on a specific day.

### Claim 16 (depends on 11)

The computer-implemented system of claim 11, wherein:
the subcontractor risk metric comprises a daily rating and a cumulative rating; and
the daily rating and cumulative rating are based on a volume, frequency, and recency of the individual construction related issues.

### Claim 17 (depends on 11)

The computer-implemented system of claim 11, wherein the operations further comprise displaying a visualization of the subcontractor risk metric that is used to prioritize the work and time on the construction site

### Claim 18 (depends on 17)

The computer-implemented system of claim 17, wherein the visualization comprises a risk heat map view of subcontractor risk levels over time, wherein the heatmap is used to further compare and hire subcontractors.

### Claim 19 (depends on 11)

The computer-implemented system of claim 11, wherein the subcontractor risk metric comprises a label of a risk-level tag that is representative of an amount of work the subcontractor is currently accountable for and a track record of the subcontractor on a project.

### Claim 20 (depends on 11)

The computer-implemented system of claim 11, wherein:
the subcontractor machine learning model augments the risk level and risk category with augmented information based on how the individual construction related issues are described; and
the subcontractor machine learning model uses the augmented information to evaluate subcontractor performance.