# US 2021/0081240 A1 · Evolutionary modelling based non-disruptive scheduling and management of computation jobs

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0081240 A1
- Document ID: US20210081240A1
- Status: Published application
- Kind: A1
- Application number: 17/105,422
- Filed: 2020-11-25
- Published: 2021-03-18
- Earliest claimed: 2018-10-16
- Assignees: Cisco Technology, Inc.
- Applicants: Cisco Technology, Inc.
- Inventors: Rohit Bahl; Stephen Williams; Debashish Ghosh
- Web page: https://patentgrep.com/patent/US20210081240A1

## CPC

- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 9/5038: {considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration (scheduling strategies G06F9/4881 and subgroups)}
- G06N 3/126: Evolutionary algorithms, e.g. genetic algorithms or genetic programming
- G06F 9/4887: {involving deadlines, e.g. rate based, periodic}
- G06N 3/086: using evolutionary algorithms, e.g. genetic algorithms or genetic programming
- G06N 3/12: using genetic models
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

Various techniques are used to schedule computing jobs for execution by a computing resource. In an example method, a schedule is generated by selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic. A second computing job is selected for a second slot in the schedule based on a second priority of the second computing job with respect to a second characteristic. The second slot occurs after the first slot in the schedule, and the second characteristic is different than the first characteristic. The first characteristic or the second characteristic includes an execution frequency. The computing jobs are executed based on the schedule.

## Claims

### Claim 1

A system, comprising:
at least one processor; and
memory storing instructions that, when executed by the at least one processor, cause the at least one processor to perform operations comprising:
generating a schedule of computing jobs by:
selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic; and
selecting, for a second slot in the schedule occurring after the first slot, a second computing job based on a second priority of the second computing job with respect to a second characteristic, the second characteristic being different than the first characteristic, the first characteristic or the second characteristic comprising execution frequencies of the computing jobs; and
cause at least one computing resource to execute the computing jobs based on the schedule.

### Claim 2 (depends on 1)

The system of claim 1, wherein the first characteristic or the second characteristic comprises execution durations of the computing jobs, computing resource utilization levels of the computing jobs, data utilization levels of the computing jobs, functions of the computing jobs, users associated with the computing jobs, or clients associated with the computing jobs.

### Claim 3 (depends on 1)

The system of claim 1, wherein the generating the schedule of the computing jobs for the computing resource further comprises:
based on selecting the second computing job based on the second priority of the second computing job with respect to the second characteristic:
determining that the second computing job has a third priority with respect to the first characteristic;
determining that a third computing job has the second priority with respect to the first characteristic;
selecting, for a third slot in the schedule occurring after the second slot, the third computing job based on the third priority.

### Claim 4 (depends on 1)

The system of claim 1, wherein the first priority exceeds the second priority.

### Claim 5 (depends on 1)

The system of claim 1, wherein the computing jobs respectively correspond to third priorities with respect to the first characteristic, the third priorities comprising the first priority, and
wherein selecting the first computing job based on a first priority of the first computing job with respect to a first characteristic comprises selecting the first computing job and the first priority from a first list of the computing jobs arranged in an order of the third priorities.

### Claim 6 (depends on 1)

The system of claim 1, wherein the operations further comprise:
determining that the at least one computing resource is operating with excess capacity.

### Claim 7 (depends on 1)

The system of claim 1, wherein the operations further comprise:
determining that one or more of the execution frequencies associated with one or more of the computing jobs have been modified, and
wherein generating the schedule for the computing jobs is in response to determining that the one or more execution frequencies have been modified.

### Claim 8 (depends on 1)

The system of claim 1, wherein the operations further comprise:
determining, based on a previous schedule of the computing jobs, the execution frequencies of the computing jobs.

### Claim 9

A method, comprising:
generating a schedule of computing jobs by:
selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic; and
selecting, for a second slot in the schedule occurring after the first slot, a second computing job based on a second priority of the second computing job with respect to a second characteristic, the second characteristic being different than the first characteristic; and
executing the computing jobs based on the schedule.

### Claim 10 (depends on 9)

The method of claim 9, wherein the first characteristic or the second characteristic comprises execution frequencies of the computing jobs, execution durations of the computing jobs, computing resource utilization levels of the computing jobs, data utilization levels of the computing jobs, functions of the computing jobs, users associated with the computing jobs, or clients associated with the computing jobs.

### Claim 11 (depends on 10)

The method of claim 10, wherein the first characteristic or the second characteristic comprises execution frequencies of the computing jobs, and
wherein the method further comprises:
determining that one or more of the execution frequencies associated with one or more of the computing jobs have been modified, and
wherein generating the schedule for the computing jobs is in response to determining that the one or more execution frequencies have been modified.

### Claim 12 (depends on 9)

The method of claim 9, wherein the generating the schedule of the computing jobs for the computing resource further comprises:
based on selecting the second computing job based on the second priority of the second computing job with respect to the second characteristic:
determining that the second computing job has a third priority with respect to the first characteristic;
determining that a third computing job has the second priority with respect to the first characteristic; and
selecting, for a third slot in the schedule occurring after the second slot, the third computing job based on the third priority.

### Claim 13 (depends on 9)

The method of claim 9, wherein the first priority exceeds the second priority.

### Claim 14 (depends on 9)

The method of claim 9, wherein the computing jobs respectively correspond to third priorities with respect to the first characteristic, the third priorities comprising the first priority, and
wherein selecting the first computing job based on a first priority of the first computing job with respect to a first characteristic comprises selecting the first computing job and the first priority from a first list of the computing jobs arranged in an order of the third priorities.

### Claim 15 (depends on 9)

The method of claim 9, further comprising:
determining that the at least one computing resource is operating with excess capacity.

### Claim 16 (depends on 9)

The method of claim 9, further comprising:
determining, based on a previous schedule of the computing jobs, the first characteristic and the second characteristic.

### Claim 17

A system, comprising:
at least one processor; and
memory storing instructions that, when executed by the at least one processor, cause the at least one processor to perform operations comprising:
generating a first list of computing jobs and associated first priorities of the computing jobs with respect to execution frequency, the computing jobs and associated first priorities being ordered in the first list based on the first priorities;
generating a second list of the computing jobs and associated second priorities of the computing jobs with respect to execution duration, the computing jobs and associated second priorities being ordered in the second list based on the first list;
generating a schedule of the computing jobs by:
selecting, for a first slot in the schedule, a first computing job with the associated first priority of the first computing job in the first list; and
selecting, for a second slot in the schedule occurring after the first slot, a second computing job with the associated second priority of the second computing job in the second list; and
cause a computing resource to execute the computing jobs based on the schedule.

### Claim 18 (depends on 17)

The system of claim 17, wherein the generating the schedule of the computing jobs further comprises:
based on selecting the second computing job with the associated second priority of the second computing job in the second list:
determining that the second computing job is associated with a third priority in the first list;
determining that a third computing job has is associated with the second priority in the first list;
associating the third computing job with the third priority in the first list; and
selecting, for a third slot in the schedule occurring after the second slot, the third computing job with the associated third priority of the third computing job in the first list.

### Claim 19 (depends on 17)

The system of claim 17, wherein the first list prioritizes the first computing job over the second computing job.

### Claim 20 (depends on 17)

The system of claim 17, wherein the operations further comprise:
determining that the execution frequency or the execution duration associated with one or more of the computing jobs has been modified, and
wherein generating the schedule for the computing jobs is in response to determining that the execution frequency or the execution duration has been modified.
