# US 2021/0080915 A1 · System and method for controlling an hvac system or an acmv system of a building

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0080915 A1
- Document ID: US20210080915A1
- Status: Published application
- Kind: A1
- Application number: 16/488,882
- Filed: 2017-10-02
- Published: 2021-03-18
- Earliest claimed: 2017-10-02
- Assignees: Hitachi, Ltd.
- Applicants: Hitachi, Ltd.
- Inventors: Yang YAN; Rajesh Vellore ARUMUGAM; Wujuan LIN
- Web page: https://patentgrep.com/patent/US20210080915A1

## CPC

- G05B 15/02: electric
- F24F 11/46: Improving electric energy efficiency or saving
- F24F 11/30: for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F 11/62: characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F 11/64: using pre-stored data
- F24F 2110/10: Temperature
- F24F 2120/10: Occupancy
- F24F 2120/12: Position of occupants
- G05B 2219/2614: HVAC, heating, ventillation, climate control
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)

## Abstract

Embodiments provide a system for controlling HVAC/ACMV system of a building, including an occupancy pattern extractor configured to generate at least one facility-based occupancy pattern for each facility type based on historical occupancy data and spatial information of the building; a zone occupancy predictor configured to predict zone occupancy variation of each zone after a predetermined time period, based on the facility-based occupancy patterns and real-time occupancy data; a similar zone matcher configured to match each zone with one or more pre-stored zones and determine air handler configurations based on the matched pre-stored zones; a configuration generator configured to determine configuration combinations by combining the air handler configurations for a plurality of zones of the building, each configuration combination including one of the air handler configurations for each zone; and a configuration optimizer configured to determine an optimal configuration combination based on one or more key performance indicators.

## Claims

### Claim 1

A system for controlling an HVAC system or an ACMV system of a building, the building comprising a plurality of zones and each zone comprising one or more types of facilities, the system comprising:
an occupancy pattern extractor configured to generate at least one facility-based occupancy pattern for each facility type based on historical occupancy data and spatial information of the building;
a zone occupancy predictor configured to predict zone occupancy variation of each zone after a predetermined time period, based on the facility-based occupancy patterns and real-time occupancy data;
a similar zone matcher configured to match each zone with one or more pre-stored zones in a historical building database based on the predicated zone occupancy variation, and determine one or more air handler configurations for each zone based on the matched pre-stored zones;
a configuration generator configured to determine a plurality of configuration combinations for the building by combining the determined air handler configurations for the plurality of zones, each configuration combination comprising one of the determined air handler configurations for each zone; and
a configuration optimizer configured to determine an optimal configuration combination from the plurality of configuration combinations based on one or more key performance indicators.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the occupancy pattern extractor is configured to generate more than one facility-based occupancy pattern for each facility type based on different visitor groups,
wherein the visitor groups are categorized by at least one of gender, age, or occupation.

### Claim 3 (depends on 1)

The system according to claim 1,
wherein the facility-based occupancy pattern for each facility type comprises one or more attributes selected from facility identification, facility name, average dwelling time, day of a week, time range, and next destination.

### Claim 4 (depends on 1)

The system according to claim 1, wherein the zone occupancy predictor is further configured to:
determine a visiting sequence for each visitor detected from the real-time occupancy data based on the facility-based occupancy patterns;
predict a future occupancy after the predetermined time period for each zone based on the visiting sequence; and
predict the zone occupancy variation of each zone after the predetermined time period based on the predicted future occupancy and the real-time occupancy data.

### Claim 5 (depends on 4)

The system according to claim 4, wherein the zone occupancy predictor is further configured to:
predict a dwelling time staying at a current facility and a next facility for each visitor, based on the visiting sequence;
predict a future occupancy after the predetermined time period in each facility based on the predicted dwelling time and the predicted next facility;
predict the future occupancy after the predetermined time period for each zone based on the predicted future occupancy in each facility.

### Claim 6 (depends on 1)

The system according to claim 1, wherein the similar zone matcher is configured to:
match each zone with the one or more pre-stored zones in the historical building database further based on at least one of a visiting sequence within the zone, the spatial information of the building, real-time zone air properties, desired thermal comfort level index, time stamp, or weather data.

### Claim 7 (depends on 1)

The system according to claim 1,
wherein the similar zone matcher is further configured to determine one or more zone air configurations for each zone based on the matched pre-stored zones.

### Claim 8 (depends on 1)

The system according to claim 1,
wherein the historical building database comprises at least one of zone air configurations or air handler configurations of the pre-stored zones,
wherein the pre-stored zones comprises zones of at least one of a pre-configured building or an un-configured building, and
wherein the pre-stored zones comprises at least one of optimized, partially optimized, or un-optimized zones.

### Claim 9 (depends on 1)

The system according to claim 1,
wherein the air handler configuration comprises at least one of supply air temperature set point, variable speed drive fan speed set point, or fresh air damper position set point.

### Claim 10 (depends on 1)

The system according to claim 1, wherein
if the matched zone is an un-optimized zone of a pre-configured building or an un-configured building, the similar zone matcher is further configured to:
retrieve zone air properties variation of the matched pre-stored zone;
estimate future zone air properties of the zone based on the retrieved zone air properties variation;
estimate at least one of a thermal load demand variation or a fresh air demand variation based on the estimated future zone air properties; and
determine an air handler configuration for the zone based on at least one of the estimated thermal load demand variation or the estimated fresh air demand variation.

### Claim 11 (depends on 1)

The system according to claim 1, further comprising:
a chiller plant optimizer configured to determine an optimal chiller plant configuration based on the optimal configuration combination and the spatial information of the building.

### Claim 12 (depends on 11)

The system according to claim 11, wherein the chiller plant optimizer is further configured to:
determine a thermal load variation for each zone based on the optimal configuration combination and the spatial information of the building;
sum up the thermal load variations for the plurality of zones of the building; and
determine the optimal chiller plant configuration based on the sum of the thermal load variations.

### Claim 13 (depends on 11)

The system according to claim 11, further comprising:
a configuration validator configured to apply the optimal configuration combination and the optimal chiller plant configuration to the building for the predetermined time period, determine values of the one or more key performance indicators after the predetermined time period, and validate the optimal configuration combination and the optimal chiller plant configuration based on a comparison between the determined values of the one or more key performance indicators and desired values of the one or more key performance indicators.

### Claim 14 (depends on 1)

The system according to claim 1,
wherein the one or more key performance indicators comprise one or more of energy saving, energy efficiency, energy usage, or thermal comfort.

### Claim 15

A method of controlling an HVAC system or an ACMV system of a building, the building comprising a plurality of zones and each zone comprising one or more types of facilities, the method comprising:
generating at least one facility-based occupancy pattern for each facility type based on historical occupancy data and spatial information of the building;
predicting zone occupancy variation of each zone after a predetermined time period, based on the facility-based occupancy patterns and real-time occupancy data;
matching each zone with one or more pre-stored zones in a historical building database based on the predicated zone occupancy variation, and determining one or more air handler configurations for each zone based on the matched pre-stored zones;
determining a plurality of configuration combinations for the building by combining the determined air handler configurations for the plurality of zones, each configuration combination comprising one of the determined air handler configurations for each zone; and
determining an optimal configuration combination from the plurality of configuration combinations based on one or more key performance indicators.
