# US 2021/0079770 A1 · Method of wellbore operations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0079770 A1
- Document ID: US20210079770A1
- Status: Published application
- Kind: A1
- Application number: 16/570,737
- Filed: 2019-09-13
- Published: 2021-03-18
- Earliest claimed: 2019-09-13
- Assignees: Silverwell Technology Limited
- Applicants: Silverwell Technology Ltd.
- Inventors: Peter John Watson
- Web page: https://patentgrep.com/patent/US20210079770A1

## CPC

- E21B 43/122: {Gas lift}
- E21B 47/06: Measuring temperature or pressure
- E21B 47/11: using tracers; using radioactivity
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method of estimating a real time production flowrate from a well by estimating a real time flowrate of a marker fluid in the well, and comparing the estimated flowrate with a baseline marker fluid flowrate; where the baseline marker fluid flowrate correlates to baseline production fluid flowrate. The baseline marker fluid flowrate is obtained by introducing an amount of a marker fluid in the well, monitoring the time over which the marker fluid travels a set distance, and estimating a flowrate of the marker fluid based on the monitored time and amount of marker fluid. The real time production flowrate is obtained by extrapolating the baseline production fluid flowrate by an amount derived from a comparison of the baseline and real time marker fluid flow rates.

## Claims

### Claim 1

A method of operating a well comprising:
obtaining data from a well test that comprises a flow velocity of production fluid flowing in tubing disposed in the well;
adding a lift fluid to the tubing;
monitoring pressure in the tubing over time and at spaced apart locations;
introducing a detectable marker fluid into the tubing at a time when conditions in the well are substantially similar to conditions in the well during the well test, detecting the presence of the marker fluid at the spaced apart locations based on the step of monitoring pressure in the tubing, estimating a reference flow velocity of the production fluid based on a distance between the spaced apart locations and a time span between when the presence of the marker fluid is detected at the spaced apart locations;
introducing into the tubing an amount of marker fluid having a density different from a density of a mixture of the production fluid and lift fluid and at a point in time after the well test was performed, detecting the presence of the marker fluid at the spaced apart locations based on the step of monitoring pressure in the tubing, and estimating a real time flow velocity of the production fluid based on a distance between the spaced apart locations and a time span between when the presence of the marker fluid is detected at the spaced apart locations; and
estimating a real time flowrate of the well based on the real time flow velocity of the production fluid and volume of tubing between the spaced apart locations.

### Claim 2 (depends on 1)

The method of claim 1, further comprising adjusting an amount of the lift fluid being added to the stream based on the step of estimating the real time flowrate.

### Claim 3 (depends on 2)

The method of claim 2, wherein the amount of the lift fluid being added to the stream is adjusted so that an amount of production fluid being produced by the well is approximately the same as a designated amount of production fluid.

### Claim 4 (depends on 1)

The method of claim 1, wherein the step of introducing the marker fluid into the tubing comprises suspending the addition of lift fluid into the tubing for a designated period of time.

### Claim 5 (depends on 1)

The method of claim 1, wherein the marker fluid comprises a slug of production fluid in the tubing.

### Claim 6 (depends on 1)

The method of claim 1, further comprising estimating a slip coefficient based on a ratio of the flow velocity from the well test and the reference flow velocity of the production fluid, and using the slip coefficient to adjust the real time flow velocity of the production fluid.

### Claim 7

A method of operating a well comprising:
obtaining flow data of the well measured during a well test performed at a point in time;
obtaining reference flow data of the well based on monitoring marker fluid flowing in the well under conditions in the well that were similar to conditions in the well occurring during the point in time;
obtaining real time flow data of the well based on monitoring marker fluid flowing in the well after the point in time; and
controlling a flow of production fluid from the well based on the real time flow data.

### Claim 8 (depends on 7)

The method of claim 7, further comprising adding gas lift fluid to the well.

### Claim 9 (depends on 8)

The method of claim 8, wherein the step of controlling a flow of production fluid comprises adjusting an amount of the gas lift fluid added.

### Claim 10 (depends on 9)

The method of claim 9, wherein the amount of gas lift fluid being added to the stream is adjusted based on a ratio of the well test flow data and the reference flow data.

### Claim 11 (depends on 8)

The method of claim 8, wherein the production fluid is from a formation adjacent the well.

### Claim 12 (depends on 11)

The method of claim 11, wherein flow data of the well after the point in time is estimated by, introducing the slug of production fluid into production tubing disposed in the well, tracking the progression of the slug through the production tubing by monitoring pressure at locations in the production tubing that are spaced an axial distance apart, and estimating a flow velocity of the slug based on a travel time of the slug between the locations and the axial distance.

### Claim 13 (depends on 12)

The method of claim 12, further comprising suspending gas lift addition for a period of time to introduce the slug of production fluid into the production tubing.

### Claim 14 (depends on 12)

The method of claim 12, further comprising reducing gas lift addition for a period of time to introduce the slug of production fluid into the production tubing.

### Claim 15 (depends on 12)

The method of claim 12, wherein a flowrate of production fluid in the tubing is estimated based on the flow velocity of the slug, and a volume in the tubing between the locations.

### Claim 16 (depends on 15)

The method of claim 15, wherein a density of a column of the production fluid between the locations is estimated based on a difference in pressure monitored at the locations, and wherein an estimate of constituents in the production fluid is estimated based on the density.

### Claim 17 (depends on 7)

The method of claim 7, wherein the flow data of the well measured during a well test performed at a point in time comprises a flowrate of fluid flowing through the well, an identification of the constituents making up the fluid flowing through the well, and fluid properties of the constituents.
