# US 2021/0079748 A1 · Improvements In Or Relating To Well Abandonment and Slot Recovery

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0079748 A1
- Document ID: US20210079748A1
- Status: Published application
- Kind: A1
- Application number: 16/954,468
- Filed: 2018-12-19
- Published: 2021-03-18
- Earliest claimed: 2017-12-20
- Applicants: Ardyne Holdings Limited
- Inventors: Michael Wardley; Alan Fairweather; George Telfer
- Web page: https://patentgrep.com/patent/US20210079748A1

## CPC

- E21B 23/14: for displacing a cable or a cable-operated tool, e.g. for logging or perforating operations in deviated wells
- E21B 29/00: Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
- E21B 29/002: {Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe}
- E21B 29/02: by explosives or by thermal or chemical means {(freeing stuck objects by explosives E21B31/002)}
- E21B 29/04: Cutting of wire lines or the like (E21B29/02 takes precedence)
- E21B 33/13: Methods or devices for cementing, for plugging holes, crevices or the like
- E21B 33/138: Plastering the borehole wall; Injecting into the formation
- E21B 33/14: for cementing casings into boreholes
- E21B 37/00: Methods or apparatus for cleaning boreholes or wells (E21B21/00 takes precedence)
- E21B 43/116: Gun or shaped-charge perforators
- E21B 47/005: Monitoring or checking of cementation quality or level
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method for removing one or more control lines (15) in a well (1), the control lines (15) running in an annulus behind a tubular (7) in the wellbore, during a well abandonment procedure comprising the steps: perforating the tubular (7) at a location adjacent the one or more control lines (15); displacing a self-supporting settable composition (21) through the perforations (20) into the annulus (18) to secure the one or more control lines (15) in place; cutting the tubular (7) and the one or more control lines (15) at the location of the self-supporting settable composition (21); washing away the self-supporting settable composition (21); and removing at least a portion of the one or more control lines from the wellbore. Embodiments are described for control lines (15) run in an annulus (18) between production tubing (7) and casing, pulling the production tubing (7) with the control lines (15), and milling the production tubing and control lines in a rigless method for well abandonment.

## Claims

### Claim 1

A method of removing one or more control lines in a well, the control lines running in an annulus behind a tubular in the wellbore, during a well abandonment procedure comprising the steps:
(a) perforating the tubular at a location adjacent the one or more control lines;
(b) displacing a self-supporting settable composition through the perforations into the annulus to secure the one or more control lines in place;
(c) cutting the tubular and the one or more control lines at the location of the self-supporting settable composition;
(d) washing away the self-supporting settable composition; and
(e) removing at least a portion of the one or more control lines from the wellbore.

### Claim 2 (depends on 1)

The method according to claim 1 wherein the annulus is between a tubular and the wellbore wall at a formation.

### Claim 3 (depends on 1)

The method according to claim 1 wherein the annulus is between two tubulars.

### Claim 4 (depends on 3)

The method according to claim 3 wherein the one or more control lines are arranged in the annulus between the production tubing and casing.

### Claim 5 (depends on 1)

The method according to claim 1 wherein the self-supporting settable composition is a resin.

### Claim 6 (depends on 1)

The method according to claim 1 wherein the self-supporting settable composition is a gel.

### Claim 7 (depends on 1)

The method according to claim 1 wherein the method comprises the step of deploying an injection tool to displace a pre-determined amount of self-supporting settable composition through the perforations into the annulus.

### Claim 8 (depends on 1)

The method according to claim 1 wherein the method includes displacing the self-supporting settable composition into the annulus as a foam.

### Claim 9 (depends on 8)

The method according to claim 8 wherein the self-supporting settable composition is a fluid.

### Claim 10 (depends on 1)

The method according to claim 1 wherein the method comprises at step (a) running a perforating tool through the tubular to the location.

### Claim 11 (depends on 1)

The method according to claim 1 wherein the method comprises perforating the tubular using explosive charges.

### Claim 12 (depends on 10)

The method according claim 10 wherein the perforating tool is a tubing punch.

### Claim 13 (depends on 1)

The method according to claim 1 wherein the method comprises at step (c) providing a tubing cutter to cut a circumferential slot through a wall of the tubular to sever the tubular and the one or more control lines.

### Claim 14 (depends on 13)

The method according to claim 13 wherein the method comprises at step (e) pulling the cut section of tubular with the severed one or more control lines attached from the well.

### Claim 15 (depends on 1)

The method according to claim 1 wherein the method comprises at step (c) deploying a milling tool to mill away a longitudinal section of the tubular and the corresponding portion of the one or more control lines.

### Claim 16 (depends on 15)

The method according to claim 15 wherein the method comprises milling away the tubular and the one or more control lines up to the top of the self-supporting settable composition.

### Claim 17 (depends on 15)

The method according to claim 15 wherein the method comprises deploying a cement plug to set in the production tubing and annulus.

### Claim 18 (depends on 1)

The method according to claim 1 wherein the method comprises repeating the steps at a shallower depth in the wellbore.

### Claim 19

(canceled)

### Claim 20 (depends on 1)

The method according to claim 1 wherein the steps are performed on separate trips into the well.

### Claim 21 (depends on 1)

The method according to claim 1 wherein two or more steps are performed on the same trip into the well.
