# US 2021/0079741 A1 · Handling apparatus and method for supplying drill rods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0079741 A1
- Document ID: US20210079741A1
- Status: Published application
- Kind: A1
- Application number: 16/572,457
- Filed: 2019-09-16
- Published: 2021-03-18
- Earliest claimed: 2019-09-16
- Assignees: BAUER Manufacturing LLC
- Applicants: BAUER Manufacturing LLC
- Inventors: Michael HARTL; Balasaheb DAND
- Web page: https://patentgrep.com/patent/US20210079741A1

## CPC

- E21B 19/15: Racking of rods in horizontal position; Handling between horizontal and vertical position
- E21B 19/155: {Handling between horizontal and vertical position}
- E21B 19/16: Connecting or disconnecting pipe couplings or joints (E21B19/20 takes precedence)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The invention relates to a handling apparatus and a method for supplying drill rods or casings to a drilling rig, comprising a track for receiving and supplying a drill rod or casing, a rear sledge, on which a rear end portion of the drill rod to be supplied is mounted and which can be moved along the track by means of a sledge drive arrangement, and a front sledge, on which a front end portion of the drill rod or casing to be supplied is mounted and which can be moved along the track, wherein the rear sledge and the front sledge can be releasably connected to each other by means of a linking device.

## Claims

### Claim 1

Handling apparatus for supplying drill rods to a drilling rig, comprising
a track which is adapted for receiving and supplying a drill rod or a casing to the drilling rig,
a rear sledge, on which a rear end portion of the drill rod to be supplied is mounted and which can be moved along the track by means of a sledge drive arrangement, and
a front sledge, on which a front end portion of the drill rod to be supplied is mounted and which can be moved along the track,
wherein the rear sledge and the front sledge can be releasably connected to each other by means of a linking device.

### Claim 2 (depends on 1)

Handling apparatus according to claim 1,
wherein the rear sledge and the front sledge are released and distant from each other in an initial receiving position for receiving the drill rod or casing and when the rear sledge and the front sledge are moved to a transfer position at an upper end section of the track, and
the rear sledge and the front sledge are connected by the linking device, when the rear sledge and the front sledge are moved from the upper end section back to the receiving position.

### Claim 3 (depends on 1)

Handling apparatus according to claim 1,
wherein a sledge drive arrangement comprises a drive rope, which is moved along the track, and
the rear sledge comprises coupling means, by which the rear sledge can be releasably coupled to the drive rope.

### Claim 4 (depends on 1)

Handling apparatus according to claim 1,
wherein at the upper end section of the track a stop and locking mechanism is provided, by which the front sledge is stopped and locked when reaching the stop and locking mechanism.

### Claim 5 (depends on 4)

Handling apparatus according to claim 4,
wherein the front sledge is released from the stop and locking mechanism, when the rear sledge reaches the front sledge at the upper end section of the track and the front sledge is connected to the rear sledge by the linking device.

### Claim 6 (depends on 1)

Handling apparatus according to claim 1,
wherein at a determined position at the track a releasing mechanism is arranged by which the linking device is disengaged and the connection between the front sledge and the rear sledge is released.

### Claim 7 (depends on 1)

Handling apparatus according to claim 1,
wherein the track comprises a receiving bed which is substantially horizontally arranged and a supply ramp which is arranged between the receiving bed and the drilling rig and inclined against the receiving bed.

### Claim 8 (depends on 1)

Handling apparatus according to claim 1,
wherein the supply ramp is pivotably mounted on the receiving bed.

### Claim 9

Method for supplying drill rods or casings by a handling apparatus to a substantially vertical drilling rig, comprising the steps of:
receiving a drill rod or casing to be supplied in a substantially horizontal position on a track,
a rear end portion of the drill rod or casing to be supplied is positioned on a rear sledge, which is movable along the track,
a front end portion of the drill rod or casing to be supplied is mounted on a front sledge, which is movable along the track,
wherein the rear sledge and the front sledge are released and distant from each other, when the rear sledge and the front sledge are moved from a receiving position to a transfer position at an upper end section of the track, and
the rear sledge and the front sledge are connected by a linking device, when the rear sledge and the front sledge are moved from the transfer position back to the receiving position.

### Claim 10 (depends on 9)

Method according to claim 9,
wherein at the upper end section of the track the front sledge is stopped and locked by a stop and locking mechanism, when the front sledge is reaching the stop and locking mechanism.

### Claim 11 (depends on 10)

Method according to claim 10,
wherein the front sledge is released from the stop and locking mechanism, when the rear sledge reaches the front sledge at the upper end section of the track and the front sledge is connected to the rear sledge by the linking device.

### Claim 12 (depends on 9)

Method according to claim 9,
wherein at a determined position at the track the linking device is disengaged and the connection between the front sledge and the rear sledge is released, when the front sledge and the rear sledge are moved back from the upper end section of the track to the receiving position.
