# US 2021/0079728 A1 · Induced drilling method for inertia constrained implicated motion and inertial constraint induced drilling device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0079728 A1
- Document ID: US20210079728A1
- Status: Published application
- Kind: A1
- Application number: 16/629,894
- Filed: 2018-07-09
- Published: 2021-03-18
- Earliest claimed: 2017-07-11
- Assignees: Xi'an Manyuan Electromechanical Equipment Co.Ltd.
- Applicants: Xi'an Manyuan Electromechanical Equipment Co.Ltd.
- Inventors: Liang TAO; Yi TAO; Yang YU; Guanhe TAO; Yanwu TAO
- Web page: https://patentgrep.com/patent/US20210079728A1

## CPC

- E21B 4/006: {Mechanical motion converting means, e.g. reduction gearings (E21B4/10 takes precedence)}
- E21B 3/025: with a to-and-fro rotation of the tool
- E21B 3/03: with an intermittent unidirectional rotation of the tool
- E21B 4/16: Plural down-hole drives, e.g. for combined percussion and rotary drilling (E21B4/10 takes precedence); Drives for multi-bit drilling units
- E21B 7/24: Drilling using vibrating or oscillating means, e.g. out-of-balance masses (percussion drilling E21B1/00)
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The invention discloses an induced drilling method for inertial constraint implicated motion, which is characterized by comprising a motion step of separating weight on bit and torque. The induced drilling method of inertial constraint implicating motion comprises the following steps: step 1, model selection of induced drilling; step 2, potential energy storage of induced drilling, wherein step 2 includes: I, uniform cutting induced drilling under a steady condition; II, distribution of induced drilling shock wave propagation under a transient condition; III, potential energy release of torsion spring in induced drilling under the transient condition; IV, constrained buffer for induced drilling under transient conditions; and V, potential energy compensation for induced drilling under transient conditions. The invention also discloses an inertia constraint induced drilling device accompanying the PDC bit.

## Claims

### Claim 1

A induced drilling method for an inertia constrained implicated motion, characterized by comprising:
Step 1, model selection for the induced drilling:
the determined model for the induced drilling can connect an inertia gear ring with a planet carrier via a torsion spring;
the determined parameters of the model for the induced drilling are: the transmission ratio m between the drill string input and the drill bit output in the drilling device induced by the inertia constraint of the PDC bit is more than or equal to m≥1.0, and the rotational inertia I of the inertia gear ring is equal to 0.25-5.4 kgm2:
Step 2, storage of the potential energy of the induced drilling:
starting the drilling system to enable the drill string to start storing potential energy in the torsion spring at the rotation speed ω0; when the torque of the drill bit reaches the rock breaking torque T0, the inertia gear ring will twist the torsion spring by θ radian relative to the drill bit, and reverse potential energy −mt0θ is stored in the torsion spring according to the transmission method of the planetary gear reducer with the transmission ratio m; the drill bit then starts rotating and cutting, and the stored reverse potential energy is kept in the torsion spring; the stored reverse potential energy exists in the whole drilling process as the median value of torque fluctuation change,
the storage of the potential energy of the induced drilling is realized based on the torsion spring deformation connected between the planet carrier output shaft of the planet gear reducer and the inertia ring gear; when the planet carrier output shaft and the inertia ring gear rotate relatively and the planet carrier output shaft rotates clockwise, the inertia ring gear rotates counterclockwise relative to the planet carrier output shaft, and the torsion spring between the planet carrier output shaft and the inertia ring gear generates elastic deformation,
the storage direction of the induced drilling potential energy is required to be opposite to the movement direction of the drilling system to form reverse energy storage; the storage stage of the induced drilling potential energy is required to be a stage before the drill bit of the drilling system starts rock breaking:
the storage size of the induced drilling potential energy is taken as the median value of fluctuation change in the drilling process;
Step 3, the steady and transient induced drilling:
the steady and transient induced drilling have different working conditions, specifically:
I. uniform cutting induced drilling under the steady condition,
when cutting and inducing drilling at a constant speed under the steady condition, the rotation speeds of the sun gear, the planet carrier and the inertia gear ring of the inertia constraint inducing drilling device are consistent,
the stored potential energy has no relative change and remains in the torsion spring,
II distribution of the induced drilling shock wave propagation under the transient condition,
during the induced drilling under the transient condition, the drill bit generates shear wave S with torsional shear stress amplitude T0, and the shear wave S propagates upward at the speed of transverse shear wave; the shear wave S propagates to the planet wheel through the planet carrier, according to the conservation principle of momentum and kinetic energy and transmission ratio m, the shear wave stress amplitude distributed to the inertia ring gear is −mT0, and the shear wave stress amplitude distributed to the sun gear is to/m;
the shear wave stress amplitude of the inertia ring gear −mT0 propagates into the torsion spring, causing circumferential wave motion of the inertia ring gear, effectively guiding and absorbing the impact wave motion of the drill bit; however, the stress amplitude T0/m of sun gear shear wave continues to upload along the drill string, weakening the disturbance in the drill string movement, thus improving the movement stability of the overall drilling system,
III potential energy release of torsion spring in induced drilling under the transient condition,
releasing the elastic potential energy stored in the torsion spring when the drill bit cutting at constant speed encounters resistance during drilling; the energy released by the inertial constraint induced drilling system naturally matches the blocking energy to adapt to the blocking resistance during drilling; the resistance of the drill bit during drilling means that the rotation speed of the drill bit when stuck is zero or the rotation speed of the drill bit when stuck is reduced;
the released energy naturally matches the blocked energy in accordance with the energy conservation and momentum conservation laws;
IV constrained buffer for induced drilling under the transient condition,
when the drill bit breaks through the resistance point, it rotates to accelerate the penetration, and dynamically redistributes the energy of the rock penetration of the drill bit;
the dynamic redistribution is the momentum equilibrium distribution of the system that changes with the time of encounter; the energy distributed to the inertia ring gear must cause the inertia ring gear to return to forward rotation; the energy distributed to the drill bit must make the drill bit continue to drill at a constant speed;
V potential energy compensation for induced drilling under the transient condition, sources of potential energy compensation for the induced drilling under the transient condition are:
the torque energy input generated by the drill string during the drilling is supplemented to the potential energy of the torsion spring;
the potential energy generated by the relative displacement change between the forward rotation of the inertia gear ring and the uniform drilling motion of the drill bit is input and supplemented into the torsion spring;
at this point, the induced drilling of inertial constraint induced movement has been completed.

### Claim 2 (depends on 1)

The induced drilling method according to claim 1, characterized in that under the transient working condition, when the potential energy of the torsion spring in induced drilling is released, when the stuck rotation speed of the drill bit is zero, the inertia gear ring stops rotating under the implication of the torsion spring, so that the inertia kinetic energy Iω02/2 existing in the inertia gear ring is superposed with the stored reverse potential energy −mτ0θ, resulting in the instantaneous reduction of the stored reverse potential energy and the instantaneous reduction of the implicating moment to the drill bit; this part of the reduced stored potential energy is instantly released to the drill bit to form an impact on the resistance point of the drill bit, thus breaking through the resistance work of the sticking point.

### Claim 3 (depends on 1)

The induced drilling method according to claim 1, characterized in that under the transient working condition, when the potential energy of the torsion spring in induced drilling is released, under the condition that the rotation speed of the drill bit is reduced due to resistance, the inertia gear ring is decelerated to ωi; the forward inertia kinetic energy I(ω02−ω12)/2 of the inertia ring gear is superposed with the stored reverse potential energy −mT0θ, thus instantly reducing the inertia ring gear kinetic energy and the stored potential energy; the reduced reverse stored potential energy is instantly released to the drill bit, so that the drill bit has enough torsional energy to overcome the blocking moment.

### Claim 4 (depends on 2)

The induced drilling method according to claim 2, characterized in that the instant is 10-900 milliseconds.

### Claim 5 (depends on 1)

The induced drilling method according to claim 1, characterized in that the inertia constraint is a relatively static inertia motion state constraint generated by the inertia gear ring under the condition of resistance change encountered by the drill bit; in order to form this constraint, there must be a mechanism that the inertia gear ring is connected to the drill bit through a torsion spring, and the drilling system meets the revolution condition; on the basis of satisfying the above conditions, it is necessary to be in such a situation that when the drill bit encounters resistance, the shear stress wave s has not yet spread to the inertia ring gear, and the inertia ring gear has not generated corresponding dynamic response, and the rotation inertia of the original revolution speed and direction remains unchanged.

### Claim 6 (depends on 1)

The induced drilling method according to claim 1, characterized in that the implied motion refers to the circumferential alternating motion generated by the torsion spring to implicate the inertial ring gear relative to the drill bit under the condition of instantaneous differential mechanical imbalance between the inertial ring gear and the drill bit after encountering resistance.

### Claim 7 (depends on 1)

The induced drilling method according to claim 1, characterized in that the induced drilling refers to periodic drilling in which sudden resistance during uniform cutting movement causes changes in bit torque and speed, resulting in instantaneous release of stored energy to break resistance and timely recovery and supplement of potential energy.

### Claim 8 (depends on 1)

An inertia constraint induced drilling device accompanying a PDC bit, which is used for performing the induced drilling method of inertia constraint implicated motion according to claim 1, and is characterized in that the separation of the weight on bit and torque can be realized, wherein the weight on bit is transmitted to the bit through a sun gear and a planet carrier, the torque is transmitted to the bit through an inertia double gear ring and a torsion spring, and the structure for separation comprises a sun gear input shaft, an inertia double gear ring, a planet gear, an end face pressure bearing, a planet carrier output shaft, a planet carrier, a pinion shaft, a small sliding bush and a multi-head torsion spring; wherein the planet carrier is sleeved on the outer circumferential surface of the sun gear input shaft, and the small sliding bearing bush is sleeved on the circumferential surface of the sun gear input shaft; four planetary gear shafts are evenly distributed on the surface of the planet carrier; the eight planetary gears are all divided into two groups, and the two groups of planetary gears are axially arranged and sleeved on each planetary gear shaft, wherein the first group of planetary gears is close to the input shaft of the sun gear and is connected with the drill collar end;
the end face of the first group of planet gears is jointed with the inner end face of one end step of the sun gear input shaft through an end face pressure bearing:
the output shaft sleeve of the planet carrier is connected with the outer circumferential surface of the input shaft of the sun gear, and the inner end surface of the output shaft of the planet carrier is jointed with the outer end surface of the planet carrier;
one end of the inertia double gear ring is sleeved on the outer circumferential surface of one end of the sun gear input shaft connected with the drill collar, the other end of the inertia double gear ring is sleeved on the outer circumferential surface of the planet carrier output shaft, and the inner surface of the middle part of the inertia double gear ring is meshed with the outer circumferential surface of the planet gear; a large sliding bearing bush is arranged at the inner periphery of the cavity between the inner surface of the inertia double gear ring and the outer surface of the sun gear input shaft: the multi-head torsion spring is a multi-head torsion spring constrained by elastic implication, the multi-head torsion spring is sleeved on the outer circumferential surface of the output shaft of the planet carrier, the inner end surface of the multi-head torsion spring is embedded with the outer end surface of the inertial double gear ring, and the end surface of the outer end of the multi-head torsion spring is fixed with the outer end surface of the output shaft of the planet carrier through a fixing bolt.

### Claim 9 (depends on 8)

The inertia constraint induced drilling device as claimed in claim 8, characterized in that the outer circumferential surface of one end of the sun gear input shaft is an equal diameter section, and the outer circumferential surface of the other end of the sun gear input shaft is in a multi-stage step shape, wherein the circumferential surface of the first stage step is used as the mating surface of the first set of planetary gears, the circumferential surface of the second stage step is used as the mounting surface of the end face pressure bearing, the circumferential surface of the third stage step is used as the mounting surface of the inertia duplex gear ring, and a radially protruding boss is arranged on the circumferential surface of the third stage step for axial positioning of the inertia duplex gear ring; the outer diameter of the equal diameter section of the sun gear input shaft is the same as the inner diameter of the planet carrier, and the end surface of the step difference between the equal diameter section of the sun gear input shaft and the first step surface is used as the axial positioning surface of the planet carrier; the outer diameter of the third step is the same as the maximum outer diameter of the planet carrier output shaft.

### Claim 10 (depends on 8)

The inertial constraint induced drilling device according to claim 8, wherein pin holes for mounting the planet carrier are uniformly distributed on the end surface of the inner end of the planet carrier output shaft; the inner surface of the outer end of the planet carrier output shaft is used as a threaded surface for connecting drill bits; the inner surface of the inner end of the planet carrier output shaft is an equal diameter section, and the inner diameter of the equal diameter section is the same as the outer diameter of the sun gear input shaft, so that the planet carrier output shaft and the sun gear input shaft are in clearance fit; the inner diameter of the middle section of the inner surface of the planet carrier output shaft is the same as the outer diameter of the assembly nut, so that the planet carrier output shaft is in clearance fit with the assembly nut; the diameter of the outer surface of the middle section of the planet carrier is the smallest, and the outer surfaces of the middle section and the two ends are all transited by inclined planes, and a matching clearance between the outer surface of the output shaft of the planet carrier and the inner surface of the multi-head torsion spring is formed in the middle section as a deformation space of the multi-head torsion spring;
the outer circumferential surface of the inner end of the output shaft of the planet carrier is a stepped surface, which is used for installing an inertial double gear ring; the multi-head torsion spring is sleeved on the outer circumferential surface of the planet carrier output shaft.

### Claim 11 (depends on 8)

The inertial constraint induced drilling device according to claim 8, wherein the modulus of the planetary gear is 1.0 to 5.0.

### Claim 12 (depends on 8)

The inertial constraint induced drilling device according to claim 8, wherein two groups of straight tooth surfaces meshed with planetary gears are axially arranged on the inner circumferential surface of the inertial double gear ring; the inner circumferential surface of one end of the inertia double gear ring is matched with the stepped surface on the outer circumference of one end of the sun gear input shaft, and the inner circumferential surface of the other end of the inertia double gear ring is matched with the stepped surface on the outer circumference of the planet carrier output shaft; grooves are evenly distributed on the end surface of one end of the inertia double gear ring which is matched with the output shaft of the planet carrier and are used for fitting connection with the end surface of the multi-head torsion spring.

### Claim 13 (depends on 8)

The inertial constraint induced drilling device according to claim 8, wherein an assembly nut is installed at the tail end of the sun gear input shaft; the assembly nut is sleeved on the outer circumferential surface of the sun gear input shaft and is positioned between the outer circumferential surface of the sun gear input shaft and the inner circumferential surface of the planet carrier output shaft.

### Claim 14 (depends on 8)

The inertial constraint induced drilling device according to claim 8, wherein the planet carrier is a hollow rotary body; mounting holes for planet gears are uniformly distributed on the shell of the planet carrier; four shaft holes for installing output shafts of each planet carrier are uniformly distributed on the end surfaces of the two ends of the planet carrier; each shaft hole is respectively communicated with the two ends of each rectangular through hole, so that the corresponding through holes respectively positioned on the end surfaces of the two ends of the planet carrier are concentric; an axially protruding annular boss is arranged at the inner edge of the end face of one end of the planet carrier, and the boss is a stop.

### Claim 15 (depends on 14)

The inertial constraint induced drilling device according to claim 14, wherein the outer diameter of the planet carrier is smaller than the inner diameter of the inertial double gear ring, and the inner diameter of the planet carrier is 3-8 mm larger than the outer diameter of the sun gear input shaft.
