- Number: US 2021/0079656 A1
- Document ID: US20210079656A1
- Status: Published application
- Kind: A1
- Application number: 17/108,805
- Filed: 2020-12-01
- Published: 2021-03-18
- Earliest claimed: 2019-03-06
- Assignees: Structual Wrap, LLC
- Applicants: Structual Wrap, LLC
- Inventors: Christopher M. Mouriz; Spiro Naos; Larry J. Bond
- Web page: https://patentgrep.com/patent/US20210079656A1

## CPC

- E04D 5/142: {along the edge of the flexible material}
- E04G 21/24: Safety or protective measures preventing damage to building parts or finishing work during construction (as auxiliary structures for scaffolds E04G5/00)
- E04D 5/06: by making use of plastics
- E04D 5/144: {Mechanical fastening means}
- E04G 2021/248: {Tarpaulins specially adapted therefor}
- E04D: ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS (coverings of outer walls by plaster or other porous material E04F13/00)
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

A system and method for temporary protection of a damaged roof is provided. The system and method for covering at least a portion of a roof with an impermeable membrane comprises a method that includes placing a strip of the impermeable membrane over the portion of the roof intended to be covered, cutting a length of the strip to accommodate a size of the portion of the roof intended to be covered, draping an end of the strip over a fascia of eaves of the roof, placing elongated construction material on the end of the strip contacting fascia of eaves of the roof, attaching the elongated construction material to the fascia of eaves of the roof using a plurality of fasteners, and repeating the steps above until the portion of the roof is covered in the impermeable membrane.

## Claims

### Claim 1

A method for covering at least a portion of a roof with an impermeable membrane, comprising:
a) placing a strip of the impermeable membrane over the portion of the roof intended to be covered;
b) cutting a length of the strip to accommodate a size of the portion of the roof intended to be covered;
c) draping an end of the strip over a fascia of eaves of the roof;
d) placing elongated construction material on the end of the strip contacting the fascia of eaves of the roof;
e) attaching the elongated construction material to the fascia of eaves of the roof using a plurality of fasteners; and
f) repeating steps a) through e) until the portion of the roof is covered in the impermeable membrane.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
g) overlapping at least three inches of a first strip of the impermeable membrane that has been placed over the roof with a second strip of the impermeable membrane that has been placed over the roof.

### Claim 3 (depends on 2)

The method of claim 2, further comprising:
h) applying heat using a heat source to a portion of the first strip that overlaps the second strip, so as to meld the portion of the first strip with the second strip, and applying heat using said heat source to shrink the first strip and the second strip.

### Claim 4 (depends on 3)

The method of claim 3, further comprising:
i) placing sandbags on top of the impermeable membrane that has been placed over the roof, in order to hold the impermeable membrane on top of the roof.

### Claim 5 (depends on 4)

The method of claim 4, wherein the elongated construction material comprises wood.

### Claim 6 (depends on 4)

The method of claim 4, wherein the elongated construction material comprises a strip of plastic.

### Claim 7 (depends on 4)

The method of claim 4, wherein the fasteners comprise nails.

### Claim 8

A method for covering at least a portion of a roof with an impermeable membrane, comprising:
a) placing a strip of the impermeable membrane over the portion of the roof intended to be covered;
b) cutting a length of the strip to accommodate a size of the portion of the roof intended to be covered;
c) creating an envelope by folding an end of the strip and attaching, using adhesive, a terminal end of the strip to the impermeable membrane;
d) placing elongated construction material in the envelope that was created in the end of the strip;
e) attaching the envelope to a fascia of eaves of the roof using a plurality of fasteners, wherein each of the plurality of fasteners are driven through the end of the strip and the elongated construction material; and
f) repeating steps a) through e) until the portion of the roof is covered in the impermeable membrane.

### Claim 9 (depends on 8)

The method of claim 8, further comprising:
g) overlapping at least three inches of a first strip of the impermeable membrane that has been placed over the roof with a second strip of the impermeable membrane that has been placed over the roof.

### Claim 10 (depends on 9)

The method of claim 9, further comprising:
h) applying heat using a heat source to a portion of the first strip that overlaps the second strip, so as to meld the portion of the first strip with the second strip, and applying heat using said heat source to shrink the first strip and the second strip.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
i) placing sandbags on top of the impermeable membrane that has been placed over the roof, in order to hold the impermeable membrane on top of the roof.

### Claim 12 (depends on 11)

The method of claim 11, wherein the elongated construction material comprises wood.

### Claim 13 (depends on 11)

The method of claim 11, wherein the elongated construction material comprises a strip of plastic.

### Claim 14 (depends on 11)

The method of claim 11, wherein the fasteners comprise nails.

### Claim 15

A method for covering at least a portion of a roof of a structure with an impermeable membrane, comprising:
a) placing a strip of the impermeable membrane over the portion of the roof intended to be covered;
b) cutting a length of the strip to accommodate a size of the portion of the roof intended to be covered;
c) draping an end of the strip over a fascia of eaves of the roof;
d) placing first elongated construction material on the end of the strip contacting the fascia of eaves of the roof;
e) attaching the first elongated construction material to the fascia of eaves of the roof using a plurality of fasteners;
f) placing second elongated construction material on the impermeable membrane contacting a valley of the roof;
g) attaching the second elongated construction material to the valley of the roof using a plurality of fasteners; and
h) repeating steps a) through g) until the portion of the roof is covered in the impermeable membrane.

### Claim 16 (depends on 15)

The method of claim 15, further comprising:
i) overlapping at least three inches of a first strip of the impermeable membrane that has been placed over the roof with a second strip of the impermeable membrane that has been placed over the roof.

### Claim 17 (depends on 16)

The method of claim 16, further comprising:
j) applying heat using a heat source to a portion of the first strip that overlaps the second strip, so as to meld the portion of the first strip with the second strip, and applying heat using said heat source to shrink the first strip and the second strip.

### Claim 18 (depends on 17)

The method of claim 17, further comprising:
k) placing sandbags on top of the impermeable membrane that has been placed over the roof, in order to hold the impermeable membrane on top of the roof.

### Claim 19 (depends on 15)

The method of claim 15, further comprising:
i) placing third elongated construction material on the impermeable membrane contacting a boundary between floors of the structure;
j) attaching the third elongated construction material to the boundary of the structure using a plurality of fasteners.

### Claim 20 (depends on 19)

The method of claim 19, further comprising:
k) placing fourth elongated construction material on the impermeable membrane contacting a bottom of the structure;
l) attaching the fourth elongated construction material to the bottom of the structure using a plurality of fasteners.