# US 2021/0079618 A1 · Method for producing a component free of toe pressure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0079618 A1
- Document ID: US20210079618A1
- Status: Published application
- Kind: A1
- Application number: 17/022,074
- Filed: 2020-09-15
- Published: 2021-03-18
- Earliest claimed: 2019-09-17
- Assignees: Keller Holding GmbH
- Applicants: Keller Holding GmbH
- Inventors: Michal Bubenicek
- Web page: https://patentgrep.com/patent/US20210079618A1

## CPC

- E02D 5/44: with enlarged footing or enlargements at the bottom of the pile
- E02D 27/28: Stressing the soil or the foundation structure while forming foundations
- C09K 17/02: containing inorganic compounds only
- E02D 3/12: Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D5/46; soil-conditioning or soil-stabilising materials C09K17/00; consolidation of ground around boreholes or wells E21B43/025)
- E02D 5/46: making in situ by forcing bonding agents into gravel fillings or the soil (consolidating soil in general E02D3/12)
- E02D 33/00: Testing foundations or foundation structures (testing methods and apparatus, see the relevant subclasses of class G01; testing structures or apparatus as regards function, in general, G01M; testing or determining chemical or physical properties, in general G01N)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE

## Abstract

The invention relates to a method for producing a component, such as a structural member, free of toe pressure, including the steps of: introducing a soluble material into soil and introducing a component into the soil on the soluble material.

## Claims

### Claim 1

A method for producing a structural member with reduced, or that is free of, toe pressure, comprising:
introducing a soluble material into a soil; and
introducing the structural member into the soil on the soluble material, wherein one or more of the following:
the soluble material is a frozen liquid; and
the soluble material is introduced in several layers, wherein an intermediate liquid-permeable layer is introduced onto a layer with the soluble material.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the soluble material is a material with a solubility in water of at least 33 g/l water.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the soluble material is a material with a solubility in water of at least 100 g/l water.

### Claim 4 (depends on 1)

The method according to claim 1, wherein after the structural member has been introduced, the structural member is subject to a rest period before undergoing an external load;
wherein the soluble material at least partially dissolves during the rest period, thereby creating a cavity under the component.

### Claim 5 (depends on 4)

The method according to claim 4, wherein the rest period is at least 4 days.

### Claim 6 (depends on 4)

The method according to claim 4, wherein the rest period is at least 10 days.

### Claim 7 (depends on 4)

The method according to claim 4, wherein the rest period is at least 20 days.

### Claim 8 (depends on 1)

The method according to claim 1, further comprising forming a foundation hole in the soil; and
wherein the foundation hole is filled with the soluble material as a soluble positioning element from a bottom of the foundation hole up to a target fill level.

### Claim 9 (depends on 1)

The method according to any one of claim 1, wherein:
before or during the introduction of the component, the soluble material is compacted such that the strength and/or the rigidity of the soluble material corresponds at least to the product of a height of the structural member and a weight of the structural member immediately after the introduction of the component.

### Claim 10 (depends on 9)

The method according to claim 9, wherein the soluble material is compacted such that a width of the soluble material is equal to or greater than a width of the structural member to be created thereon and that a height of the soluble material corresponds to a maximum of the single width of the component.

### Claim 11 (depends on 10)

The method according to claim 10, the height of the soluble material corresponds to a maximum of half the width of the component.

### Claim 12 (depends on 1)

The method according to claim 1, wherein one or more of the following:
the soluble material is selected from the group consisting of: salts, sugars, and acids; and
the soluble material contains at least one liquid made of cellulose and one frozen liquid.

### Claim 13 (depends on 1)

The method according to any one of claim 1, wherein a micro-element is added to the soluble material, the micro-element being selected from the group consisting of: zinc, manganese, iron, selenium, and copper.

### Claim 14 (depends on 1)

The method according to claim 1, wherein the soluble material is selected from a material that, when completely dissolved in water, has a pH of at least 6.0 and a maximum pH of 8.0.

### Claim 15 (depends on 1)

The method according to claim 1, wherein the soluble material is selected from a material that, when completely dissolved in water, has a pH of at least at least 6.8 and a maximum pH of 7.2.

### Claim 16 (depends on 1)

The method according to claim 1, wherein a liquid is added to the soluble material before or after the introduction of the structural member such that cavities in the soluble material are filled with the liquid.

### Claim 17 (depends on 1)

The method according to claim 1, wherein the soluble material is introduced into the soil, and the introduction of the structural member on the soluble material is performed by one of the following: immersion vibration, vibratory hammer, pipe jacking, and drilling a borehole.

### Claim 18 (depends on 1)

The method according to any one of claim 1, wherein surface friction of the structural member is determined after the structural member has been introduced.

### Claim 19 (depends on 18)

The method according to claim 18, wherein an additional structural member is introduced into the soil, wherein the additional structural member has same dimensions as the component, the additional structural member being introduced into the ground such that a toe pressure acts on the additional structural member from the ground; and
wherein after the introduction of the further structural member a total resistance of the further structural member is determined; and
wherein from the total resistance of the further structural member and the surface friction of the structural member the toe pressure resistance of the further structural member is determined.

### Claim 20 (depends on 1)

The method according to claim 1, wherein the structural member is a component of a foundation.