# US 2021/0078679 A1 · On-board fabrication of pipe-in-pipe assemblies

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0078679 A1
- Document ID: US20210078679A1
- Status: Published application
- Kind: A1
- Application number: 16/772,411
- Filed: 2018-12-10
- Published: 2021-03-18
- Earliest claimed: 2017-12-12
- Assignees: Shanghai Zhenhua Heavy Industries Co., Ltd.
- Applicants: Shanghai Zhenhua Heavy Industries Co., Ltd.
- Inventors: Alessandro Fenini; Laurent Daney
- Web page: https://patentgrep.com/patent/US20210078679A1

## CPC

- B63B 35/03: Pipe-laying vessels (laying pipes under water F16L1/12)
- F16L 1/19: the pipes being J-shaped
- B63B 2003/147: {Moon-pools, e.g. for offshore drilling vessels}
- F16L 1/18: the pipes being S- or J-shaped and under tension during laying
- F16L 1/225: Stingers
- F16L 1/23: Pipe tensioning apparatus
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL

## Abstract

A pipelay vessel having two pipe string manufacturing lines and a firing line, wherein the pipe string manufacturing lines are designed for simultaneously handling two different pipe outer diameters for use as an inner pipe and an outer pipe respectively. Further, the vessel has a pipe-in-pipe assembly workstation for assembling the inner pipe and the outer pipe in a pipe-in-pipe configuration. The vessel is designed with a lay-out which allows for producing offshore pipe-in-pipe strings from single joints, wherein available space is optimally used and pipe-in-pipe strings can be produced safely offshore.

## Claims

### Claim 1

A pipelay vessel, comprising two pipe string manufacturing lines and a firing line, wherein the pipe string manufacturing lines are designed for simultaneously handling two different pipe outer diameters for use as an inner pipe and an outer pipe respectively and wherein the vessel further comprises a pipe-in-pipe assembly workstation for assembling the inner pipe and the outer pipe in a pipe-in-pipe configuration.

### Claim 2 (depends on 1)

The vessel according to claim 1, wherein the pipe string manufacturing lines comprises one or more workstations for the fabrication of multi-length strings from single joints.

### Claim 3 (depends on 1)

The vessel according to claim 1, wherein the pipe-in-pipe assembly station is configured for the assembly of pipe-in-pipe lengths with a string length ranging between one and up to four standard joint lengths.

### Claim 4 (depends on 1)

The vessel according to claim 1, the vessel further comprising storage space for single pipe joints.

### Claim 5 (depends on 1)

The vessel according to claim 1, the vessel further comprising:
a) a weather deck;
b) a J-lay pipe deployment facility comprising a tower arranged above the weather deck, for deployment of pipe in J-lay mode, received from the firing line;
c) pipe handling equipment for delivering the pipe or pipe-in-pipe strings from the firing line to the tower.

### Claim 6 (depends on 5)

The vessel according to claim 5, the vessel further comprising a moonpool, passing through the weather deck, and wherein the J-lay tower is located above the moonpool.

### Claim 7 (depends on 1)

The vessel according to claim 1, the vessel further comprising on-board storage for the fabricated pipe-in-pipe strings.

### Claim 8 (depends on 1)

The vessel according to claim 1, the vessel being arranged with the pipe string manufacturing lines below the weather deck.

### Claim 9 (depends on 5)

The vessel according to claim 5, the vessel further comprising an S-lay pipe deployment facility located below the weather deck, comprising the firing line.

### Claim 10 (depends on 9)

The vessel according to claim 9, wherein the J-lay tower is arranged for performing operations through the moonpool simultaneously with operation of the S-lay pipe deployment facility to manufacture the pipeline.

### Claim 11 (depends on 9)

The vessel according to claim 9, wherein the firing line extends along a centreline of the vessel and wherein the moonpool is located to one side of the firing line.

### Claim 12 (depends on 9)

The vessel according to claim 9, wherein the moonpool is separated from the firing line by a cofferdam extending to the weather deck.

### Claim 13 (depends on 5)

The vessel according to claim 5, wherein the firing line comprises one of the workstations.

### Claim 14 (depends on 5)

The vessel according to claim 5, wherein the pipe-in-pipe assembly station is arranged to assemble inner and outer pipe strings on the firing line.

### Claim 15 (depends on 5)

The vessel according to claim 5, wherein the pipe-in-pipe assembly station is arranged parallel and adjacent to the firing line, such that a distance between the firing line and the pipe-in-pipe assembly station is less than 5 meters.

### Claim 16 (depends on 9)

The vessel according to claim 9, wherein the pipe handling equipment comprises an elevator arranged to elevate pipe-in-pipe strings between the firing line to the weather deck.

### Claim 17

A method of laying a pipe-in-pipe pipeline from a pipe-laying vessel having two independent and separate pipe string manufacturing lines, a firing line and a J-lay tower, the method comprising deploying pipe from the vessel in J-lay mode by:
a) introducing single pipe in a first workstation of each of the two pipe string manufacturing lines, whereby the first pipe string manufacturing line receives inner pipes and the second pipe string manufacturing line receives outer pipes, the inner pipes having a smaller outer diameter than the inner diameter of the outer pipes;
b) fabricating double-joints in a first type workstation of each pipe string manufacturing line;
c) introducing the double-joints into the firing line;
d) joining the doubles to form quad- or triple-joint pipe strings on the firing line;
e) assembling the inner pipe and the outer pipe strings in a pipe-in-pipe configuration;
f) presenting the pipe-in-pipe configuration to the J-lay tower; and
g) connecting the pipe-in-pipe configuration to the pipeline and lowering the pipeline into the sea.

### Claim 18 (depends on 17)

The method according to claim 17, wherein step e) at least in part is performed on the firing line.

### Claim 19 (depends on 17)

The method according to claim 17, wherein the J-lay tower is located adjacent to a moonpool and wherein the pipe-in-pipe pipeline is lowered through the moonpool.

### Claim 20 (depends on 17)

The method according to claim 17, wherein the steps a) to e) are performed below a weather deck and wherein the J-lay tower is located above the weather deck, the step f) further comprising elevating the pipe-in-pipe configuration to the weather deck.

### Claim 21 (depends on 17)

The method of claim 17,
wherein the vessel comprises two pipe string manufacturing lines and a firing line,
wherein the pipe string manufacturing lines are designed for simultaneously handling two different pipe outer diameters for use as an inner pipe and an outer pipe respectively,
wherein the vessel further comprises a pipe-in-pipe assembly workstation for assembling the inner pipe and the outer pipe in a pipe-in-pipe configuration,
wherein the vessel further comprises:
a) a weather deck;
b) a J-lay pipe deployment facility comprising a tower arranged above the weather deck, for deployment of pipe in J-lay mode, received from the firing line;
c) pipe handling equipment for delivering the pipe or pipe-in-pipe strings from the firing line to the tower.

### Claim 22 (depends on 17)

The method according to claim 17, the method further comprising subsequent or prior to deploying pipe in J-lay mode, abandoning and recovering the pipeline and performing S-lay deployment of pipe over a stern of the vessel,
wherein the vessel comprises two pipe string manufacturing lines and a firing line,
wherein the pipe string manufacturing lines are designed for simultaneously handling two different pipe outer diameters for use as an inner pipe and an outer pipe respectively,
wherein the vessel further comprises a pipe-in-pipe assembly workstation for assembling the inner pipe and the outer pipe in a pipe-in-pipe configuration,
wherein the vessel further comprises:
a) a weather deck;
b) a J-lay pipe deployment facility comprising a tower arranged above the weather deck, for deployment of pipe in J-lay mode, received from the firing line;
c) pipe handling equipment for delivering the pipe or pipe-in-pipe strings from the firing line to the tower, and
wherein the vessel further comprises an S-lay pipe deployment facility located below the weather deck, comprising the firing line.

### Claim 23

A pipe-in-pipe assembly workstation for assembling inner and outer pipe strings in a pipe-in-pipe configuration, comprising multiple pipe line-up conveyor modules positioned for supporting an inner pipe string and an outer pipe string such that their centrelines form one continuous line, and a pipe push-pull system arranged to move the outer pipe string with respect to the inner pipe string.

### Claim 24 (depends on 23)

The pipe-in-pipe assembly workstation according to claim 23, wherein one or more pipe line-up conveyor modules comprises a set of support rollers placed in a V-configuration, for supporting the outer pipe string and allowing a translational movement of the pipe along the centreline.

### Claim 25 (depends on 22)

The pipe-in-pipe assembly workstation according to claim 22, wherein one or more pipe line-up conveyor modules comprises a set of motorized rollers, for transporting the outer pipe over the inner pipe to assemble the pipes to the pipe-in-pipe configuration.

### Claim 26 (depends on 22)

The pipe-in-pipe assembly workstation according to claim 22, wherein one or more pipe line-up conveyor modules further comprises at least one spinning roller for supporting and rotating the inner pipe during insertion into the outer pipe.

### Claim 27 (depends on 23)

The pipe-in-pipe assembly workstation according to claim 23, wherein the pipe push-pull system comprises a pipe end pusher, located at one end of the pipe-in-pipe assembly workstation, for pushing of the inner pipe string during pipe-in-pipe assembly.

### Claim 28 (depends on 23)

The pipe-in-pipe assembly workstation according to claim 23, wherein the pipe push-pull system further comprises a double plug system for pulling an inner pipe string in both directions, comprising an inner pipe end cap, located on a first end of the workstation for connecting to a far end of the inner pipe string, and an outer pipe end cap, located at an opposite side of the workstation, for connecting to a far end of the outer pipe string.

### Claim 29 (depends on 28)

The pipe-in-pipe assembly workstation according to claim 28, wherein the double plug system further comprises an inner interconnection cable, connectable to the inward facing sides of the inner pipe end cap and the outer pipe end cap, through the pipe strings.

### Claim 30 (depends on 28)

The pipe-in-pipe assembly workstation according to claim 28, wherein the pipe push-pull system further comprises an inner pipe winch, located on the pipe pusher and connectable to the outward facing side of the inner pipe end cap.

### Claim 31 (depends on 28)

The pipe-in-pipe assembly workstation according to claim 28, wherein the pipe push-pull system further comprises an outer pipe winch, located on the opposite end of the workstation from the pipe pusher, connectable to the outward facing side of the outer pipe end cap.

### Claim 32 (depends on 31)

The pipe-in-pipe assembly workstation according to claim 31, wherein the height and the distance from the outer pipe winch of the pipe end pusher is adjustable.

### Claim 33 (depends on 23)

The pipe-in-pipe assembly workstation according to claim 23, wherein the workstation is no longer than 110 m.

### Claim 34 (depends on 23)