# US 2021/0071392 A1 · Construction machine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0071392 A1
- Document ID: US20210071392A1
- Status: Published application
- Kind: A1
- Application number: 16/961,006
- Filed: 2019-01-10
- Published: 2021-03-11
- Earliest claimed: 2018-01-11
- Assignees: Hitachi Construction Machinery Co., Ltd.
- Applicants: Hitachi Construction Machinery Co., Ltd.
- Inventors: Hidekazu MORIKI; Takaaki CHIBA; Shinya IMURA
- Web page: https://patentgrep.com/patent/US20210071392A1

## CPC

- F15B 19/002: {Calibrating}
- E02F 9/2235: {including an electronic controller}
- E02F 9/2242: {including an electronic controller}
- E02F 9/2285: {Pilot-operated systems}
- E02F 9/264: {Sensors and their calibration for indicating the position of the work tool}
- E02F 9/2228: {including an electronic controller}
- E02F 9/2267: {Valves or distributors (position of valves arrangements on upper-structures E02F9/0875)}
- E02F 9/2275: {Hoses and supports therefor and protection therefor}
- F15B 19/007: {Simulation or modelling}
- F15B 2211/20538: constant capacity
- F15B 2211/20576: with multiple pumps
- F15B 2211/30505: Non-return valves, i.e. check valves
- F15B 2211/30575: in a Wheatstone Bridge arrangement (also half bridges)
- F15B 2211/327: electrically or electronically
- F15B 2211/351: Flow control by regulating means in feed line, i.e. meter-in control
- F15B 2211/353: Flow control by regulating means in return line, i.e. meter-out control
- F15B 2211/41518: being connected to multiple pressure sources
- F15B 2211/426: electrically or electronically
- F15B 2211/45: Control of bleed-off flow, e.g. control of bypass flow to the return line
- F15B 2211/455: Control of flow in the feed line, i.e. meter-in control
- F15B 2211/46: Control of flow in the return line, i.e. meter-out control
- F15B 2211/50536: using unloading valves controlling the supply pressure by diverting fluid to the return line
- F15B 2211/526: electrically or electronically
- F15B 2211/6309: the pressure being a pressure source supply pressure
- F15B 2211/6313: the pressure being a load pressure
- F15B 2211/634: representing a state of a valve
- F15B 2211/6355: having valve means
- F15B 2211/665: Methods of control using electronic components
- F15B 2211/7053: Double-acting output members
- F15B 2211/855: Testing of fluid pressure systems
- F15B: SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

An object of the present invention is to provide a construction machine that allows easy and accurate calibration of a pressure sensor and enables accurate control of hydraulic actuators. A controller increases the delivery pressure of a hydraulic pump in a state in which first and second meter-out valves and a second meter-in valve are closed and in which a first meter-in valve is opened, and calibrates a first pressure-calculation map such that a pressure calculated on the basis of the first pressure-calculation map matches a pressure calculated on the basis of a supply-pressure-calculation map, and increases the delivery pressure of the hydraulic pump in a state in which the first and second meter-out valves and the first meter-in valve are closed and in which the second meter-in valve is opened, and calibrates a second pressure-calculation map such that a pressure calculated on the basis of the second pressure-calculation map matches the pressure calculated on the basis of the supply-pressure-calculation map.

## Claims

### Claim 1

A construction machine comprising:
a hydraulic pump;
a supply hydraulic line connected to the hydraulic pump;
a tank;
a discharge hydraulic line connected to the tank;
a hydraulic actuator having a first oil chamber and a second oil chamber;
a first-actuator hydraulic line connected to the first oil chamber;
a second-actuator hydraulic line connected to the second oil chamber;
a first meter-in valve provided on a first connection hydraulic line connecting the supply hydraulic line and the first-actuator hydraulic line;
a second meter-in valve provided on a second connection hydraulic line connecting the supply hydraulic line and the second-actuator hydraulic line;
a first meter-out valve provided on a third connection hydraulic line connecting the first-actuator hydraulic line and the discharge hydraulic line;
a second meter-out valve provided on a fourth connection hydraulic line connecting the second-actuator hydraulic line and the discharge hydraulic line;
a bleed-off valve provided on a fifth connection hydraulic line connecting the supply hydraulic line and the discharge hydraulic line;
a supply-pressure sensor that senses a delivery pressure of the hydraulic pump;
a first-load-pressure sensor that senses a pressure of the first oil chamber;
a second-load-pressure sensor that senses a pressure of the second oil chamber; and
a controller that controls the first and second meter-in valves, the first and second meter-out valves, and the bleed-off valve in accordance with sensing signals of the first and second-load-pressure sensors, and a sensing signal of the supply-pressure sensor, wherein
the controller is configured to
calculate the delivery pressure of the hydraulic pump from the sensing signal of the supply-pressure sensor on a basis of a supply-pressure-calculation map representing a characteristic of the supply-pressure sensor,
calculate the pressure of the first oil chamber from the sensing signal of the first-load-pressure sensor on a basis of a first pressure-calculation map representing a characteristic of the first-load-pressure sensor,
calculate the pressure of the second oil chamber from the sensing signal of the second-load-pressure sensor on a basis of a second pressure-calculation map representing a characteristic of the second-load-pressure sensor,
increase the delivery pressure of the hydraulic pump in a state in which the first and second meter-out valves and the second meter-in valve are closed and in which the first meter-in valve is opened, and calibrate the first pressure-calculation map such that the pressure calculated on the basis of the first pressure-calculation map matches the pressure calculated on the basis of the supply-pressure-calculation map, and
increase the delivery pressure of the hydraulic pump in a state in which the first and second meter-out valves and the first meter-in valve are closed and in which the second meter-in valve is opened, and calibrate the second pressure-calculation map such that the pressure calculated on the basis of the second pressure-calculation map matches the pressure calculated on the basis of the supply-pressure-calculation map.

### Claim 2 (depends on 1)

The construction machine according to claim 1, further comprising:
a first-valve-position sensor that senses a valve position of the first meter-in valve; and
a second-valve-position sensor that senses a valve position of the second meter-in valve, wherein
the controller is configured to
calculate the valve position of the first meter-in valve from a sensing signal of the first-valve-position sensor on a basis of a first position-calculation map representing a characteristic of the first-valve-position sensor, and
calculate the valve position of the second meter-in valve from a sensing signal of the second-valve-position sensor on a basis of a second position-calculation map representing a characteristic of the second-valve-position sensor, and
the controller is configured to
actuate the first meter-in valve in a state in which the first and second meter-out valves and the second meter-in valve are closed, and calibrate the first position-calculation map such that the valve position calculated on the basis of the first position-calculation map when the first meter-in valve is at a minimum position becomes a minimum position, and the valve position calculated on the basis of the first position-calculation map when the first meter-in valve is at a maximum position becomes a maximum position, or
actuate the second meter-in valve in a state in which the first and second meter-out valves and the first meter-in valve are closed, and calibrate the second position-calculation map such that the valve position calculated on the basis of the second position-calculation map when the second meter-in valve is at a minimum position becomes a minimum position, and the valve position calculated on the basis of the second position-calculation map when the second meter-in valve is at a maximum position becomes a maximum position.

### Claim 3 (depends on 1)

The construction machine according to claim 1, wherein
the controller is configured to
actuate the bleed-off valve in a state in which the first and second meter-out valves and the second meter-in valve are closed and in which the first meter-in valve is opened, and calibrate the first pressure-calculation map such that the pressure calculated on the basis of the first pressure-calculation map matches the pressure calculated on the basis of the supply-pressure-calculation map, or
actuate the bleed-off valve in a state in which the first and second meter-out valves and the first meter-in valve are closed and in which the second meter-in valve is opened, and calibrate the second pressure-calculation map such that the pressure calculated on the basis of the second pressure-calculation map matches the pressure calculated on the basis of the supply-pressure-calculation map.

### Claim 4 (depends on 1)

The construction machine according to claim 1, wherein
the supply-pressure sensor is installed on a hydraulic line portion of a hydraulic line connecting the hydraulic pump and the first or second meter-in valve, the hydraulic line portion excluding a hydraulic line portion connecting the hydraulic pump and the bleed-off valve.
