# US 2021/0071380 A1 · Method for building concrete foundations for lattice-type offshore structures, and foundations built using this method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0071380 A1
- Document ID: US20210071380A1
- Status: Published application
- Kind: A1
- Application number: 17/040,571
- Filed: 2019-03-27
- Published: 2021-03-11
- Earliest claimed: 2018-03-27
- Assignees: Ingecid, InvestigacióN Y Desarrollo De Proyectos, S.L.
- Applicants: Ingecid InvestigacióN Y Desarrollo De Proyectos, S.L.
- Inventors: Jokin RICO ARENAL; Jesús DE PAZ SIERRA; Marina LLAMA VÉLEZ; Silvia SUAREZ GÓMEZ; Javier SÁNCHEZ HARO
- Web page: https://patentgrep.com/patent/US20210071380A1

## CPC

- E02B 17/02: placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B 17/027: {steel structures (E02B17/021 takes precedence)}
- E02D 27/52: Submerged foundations {, i.e. submerged in open water (E02D27/12 - E02D27/24 take precedence)}
- E04G 21/10: Devices for levelling, e.g. templates or boards (smoothing tools E04F21/16, E04F21/24)
- F03D 13/25: specially adapted for offshore installation
- E02B 2017/0043: {Placing the offshore structure on a pre-installed foundation structure}
- E02B 2017/0056: {Platforms with supporting legs}
- E02B 2017/0069: {Gravity structures}
- E02B 2017/0082: {Spudcans, skirts or extended feet}
- E02B 2017/0091: {Offshore structures for wind turbines}
- F03D 13/22: {Foundations specially adapted for wind motors}
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/727: Offshore wind turbines
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- F03D: WIND MOTORS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The invention relates to a method for building concrete foundations for lattice-type offshore structures and to foundations built using this method, which has the main aim of replacing the piles used to anchor lattice structures to the seabed (7) with blocks of on-site reinforced concrete (1) which grant the necessary stability to the lattice structure (2), doing away with all pile-driving works but without performing any structural modification of said structure. Said elements (1) are positioned using templates (12). The advantages of this novel invention lie in the possibility of installation on any type of terrain, providing a perfect connection between the seabed and the foundations thanks to on-site concreting, as well as its ease of construction, reduction of noise emissions and of auxiliary means.

## Claims

### Claim 1

A method for building a concrete foundation for lattice-type offshore structures comprising, successively, the following steps:
a) anchoring a recoverable template (12) defining, at the points where the connecting structure (4) of the lattice structure (2) is to be housed, cylindrical holes (13) that allow to house guiding cones (6);
b) positioning of concrete guiding cones (6) introduced into the cylindrical holes (13) of the template (12), defining the exact position on the seabed (7) on which blocks (1) constituting the point supports of the lattice structure (2) are to be concreted;
c) removing the template (12), leaving the cones (6) in the desired position of the seabed (7);
d) positioning a formwork (14) on the seabed (7), in a position such that each of the guiding cones (6) is introduced into the inner hole (5) of each formwork (14);
e) subsea concreting all the formwork (14) in the space between an outer wall (9) and an inner wall (8) thereof to form a concrete block (1) of the size and shape defined by the formwork (14), with a central cylindrical hole (5) in which the connecting structure (4) of the lattice structure (2) will be housed;
f) placing the lattice structure (2), introducing each of its connecting parts (4) into the cylindrical holes (5) made in each of the concrete blocks (1); and
g) sealing the connecting part (4) and the foundation hole (5) by injecting mortar into the space between the two elements.

### Claim 2 (depends on 1)

The method according to claim 1, characterised in that, optionally, the first two steps of anchoring the template (12) and positioning the guiding cones (6) within each of the cylindrical holes (13) of said template (12) are carried out jointly.

### Claim 3

The method according to any one of the preceding claims, characterised in that before placing the lattice structure (2) on the concrete blocks (1), introducing the corresponding connecting element (4) with the structure (2) in the holes (5), a layout of the coordinates of the set of all the holes (5) and, if necessary, the adjustments in any of the connecting parts (4) of the legs of the structure (2) are carried out.

### Claim 4

Concrete foundation for lattice-type offshore structures comprising several independent blocks (1) of reinforced concrete built on-site on the seabed (7) in correspondence with the connections (4) existing at the support points of the lattice structure (2) to be supported, each of which comprising:
a guiding cone (6) that is placed by means of a recoverable template (12) on the seabed (7) marking the precise location point of each of the connecting parts (4) of the lattice structure (2) to be supported;
a lost formwork (14) having an outer wall (9) defining the configuration of the concrete block (1); an inner wall (8) forming the opening in which the connecting part (4) of the lattice structure is housed; and a structure (10) including several structural reinforcements between both walls (8) and (9) that hold them in a concentric position and that reinforce the concrete by being embedded therein; and
a concrete filling taking the space between the walls (8) and (9) of the lost formwork (14), poured in this space once the guiding cone (6) and the formwork (14) have been positioned in their location on the seabed (7).