# US 2021/0064798 A1 · Power system reliability assessment method considering optimized scheduling of cascade hydropower stations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0064798 A1
- Document ID: US20210064798A1
- Status: Published application
- Kind: A1
- Application number: 16/987,258
- Filed: 2020-08-06
- Published: 2021-03-04
- Earliest claimed: 2019-08-26
- Assignees: Chongqing University
- Applicants: Chongqing University
- Inventors: Bo Hu; Kaigui Xie; Ye Li; Tao Niu; Wei Chen; Weixin Zhang
- Web page: https://patentgrep.com/patent/US20210064798A1

## CPC

- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06N 7/01: Probabilistic graphical models, e.g. probabilistic networks
- G06N 20/00: Machine learning
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 10/067: Enterprise or organisation modelling
- G06Q 50/06: Energy or water supply
- G06F 2111/04: Constraint-based CAD
- G06F 2111/08: Probabilistic or stochastic CAD
- G06F 2111/10: Numerical modelling
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The present invention discloses a power system reliability assessment method considering optimized scheduling of cascade hydropower stations, by which the reliability of the power system is improved, comprising following steps: establishing power system optimization models; inputting the sequential wind speed, runoff and load data within 24h; in accordance with reliability parameters of units and by the sequential Monte Carlo method, sampling the state durations of three kinds of units and segmenting the state durations on a 24-hour cycle; calculating the sequential output of wind farms within 24h according to wind speed data and the state of wind power units; calculating the hourly loss-of-load, according to the state of wind power units and thermal power units as well as the optimization models; optimizing for 365 days according to the method described in the step 4, and calculating reliability indices; and determining convergence or not, and if not, continuously repeating the steps S3 to S7 until convergence.

## Claims

### Claim 1

A power system reliability assessment method considering optimized scheduling of cascade hydropower stations, by which the reliability of the power system is improved, comprising following steps:
S1: establishing wind, thermal and hydropower power system optimization models considering short-term optimized scheduling of the cascade hydropower stations, and calculating by a central processing unit:
S1.1: establishing an output model for the cascade hydropower stations:
(a) output function for the hydropower stations:
Pi,t=KiQi,tHi
where, Ki represents an output coefficient from the ith-stage hydropower station; Qi,t represents the power flow of the ith-stage hydropower station at the tth hour; and Hi represents the head of the ith-stage hydropower station, which is measured by a water level meter;
(b) output constraint for the hydropower stations:
Pi,min≤Pi,t≤Pi,max
where, Pi,max and Pi,min represent maximum and minimal outputs of the ith-stage hydropower station;
(c) power flow constraint:
Qi,min≤Qi,t≤Qi,max
where, Qi,max and Qi,mi represent maximum and minimal power flows of the ith-stage hydropower station;
(d) water balance constraint:
Vi,t=Vi,t−1+(Ii,t+Qi−1,t+Si−1,t−Qi,t−Si,t)×Δt
where, Vi,t represents the storage capacity of the ith-stage hydropower station at the tth-stage hour; Ii,t represents the runoff into the reservoir of the ith-stage hydropower station at the tth hour which is measured by a flowmeter; Si,t represents the spillage flow of the ith-stage hydropower station at the tth hour; Δt=3600 seconds;
(e) discharge flow constraint:
Di,min≤Si,t+Qi,t≤Di,max
where, D and Di,min represent maximum and minimal discharge flows allowable by the ith-stage hydropower station;
(f) storage capacity constraint:
Vi,min≤Vi,t≤Vi,max
where, Vi,max and Vi,min represent maximum and minimal storage capacities of the ith-stage hydropower station;
(g) Storage capacity equalization constraint at the beginning and ending of the scheduling cycle:
Vi,0=Vi,T
where, Vi,0 and Vi,T represent storage capacities of the ith-stage hydropower station at the beginning and ending of the scheduling cycle;
S1.2: output model for wind farms:
based on the principle of aerodynamics, the output power of the wind power units is in direct proportion to the third power of wind speed, then:
P

(
v
)
=
{
0
(
v
≤
v
ci
)
⋃
(
v
≥
v
co
)
P
R
v
R
3
-
v
ci
3

(
v
3
-
v
ci
3
)
v
ci
≤
v
≤
v
R
P
R
v
R
≤
v
≤
v
co
where, P (v) represents the output power of the wind power units; PR represents the rated power of the wind power units; vci represents the cut-in wind speed; vR represents the rated wind speed; vco represents the cut-out wind speed; and v represents the wind speed at high points on hubs of the wind power units, which is measured by a wind meter;
without considering the wake effect and the wind speed correlation in the wind farms, the output of the wind farms is the sum of output power of the wind power units:
W

P

(
v
)
=
∑
i
=
1
N
w

g

α
i

P
i

(
v
)
where, WP (v) represents the output of the wind farms; Nwg represents the number of wind power units; and αi represents the state of the wind power units, indicating the normal operation of the wind power units at αi=1 and the fault of the wind power units at αi=0;
S1.3: output model for the thermal power units:
TPj,min≤TPj,t≤TPj,max
where, TPj,max and TPj,min represent maximum and minimal outputs of the thermal power unit j;
−rjd≤TPj,t−TPj,t−1≤rju
where, rju and rjd represent maximum ramp-ups and ramp-downs rates of the thermal power unit j;
S1.4: Optimized operation models for wind, thermal and hydropower power systems:
establishing an objective function to minimize the amount of load shed:
min


f
=
∑
t
=
1
T

LoL
t
where, represents the amount of load shed at the tth hour; and T represents the scheduling cycle, T=24 h;
(h) loss-of-load constraint:
0≤LoLt≤Lt
where, Lt represents load at the tth hour, which is obtained by a load monitoring system;
(i) power balance constraint:
∑
i
=
1
N
H

P
i
,
t
+
∑
j
=
1
N
T

T

P
j
,
t
+
∑
k
=
1
N
W

W

P
k
,
t
=
L
t
+
L

o

L
t
where, NH, NT and NW represent the number of stages of cascade hydropower stations, the number of thermal power units and the number of wind farms, respectively; TPj,t represents the output of the thermal power unit j at the tth hour; and WPk,t represents the output of the wind farm k at the tth hour;
S2: monitoring the annual wind speed, runoff and load data by the wind meter, the flowmeter and the load monitoring system, and inputting the sequential wind speed, runoff and load data within 24 h;
S3: in accordance with reliability parameters of the wind power units, thermal power units and hydropower units and by the sequential Monte Carlo method, sampling the state durations of the three kinds of units and segmenting the state durations on a 24-hour cycle;
S4: calculating the sequential output of the wind farms within 24 h according to the wind speed data and the state of the wind power units;
S5: calculating, by the central processing unit, the sequential output of the cascade hydropower stations and the thermal power units with 24 h and the hourly loss-of-load, according to the state of the wind power units and the thermal power units as well as the wind, thermal and hydropower power system optimization models considering short-term optimized scheduling of the cascade hydropower stations;
S6: optimizing for 365 days according to the method described in the step S5, and calculating yearly reliability indices: loss-of-load expectation LOLE, loss-of-energy expectation LOEE and loss-of-load frequency LOLF; and
S7: determining convergence or not according to the equation in 3, and if not, returning to the step S3 and repeating the steps S3 to S7 until convergence.

### Claim 2 (depends on 1)

The power system reliability assessment method considering optimized scheduling of cascade hydropower stations according to claim 1, wherein, in the step S1.2, when the wind speed v is between Vci and VR, the output power of the wind power units can be approximately linear to the wind speed:
P

(
v
)
=
{
0
(
v
≤
v
ci
)
⋃
(
v
≥
v
co
)
P
R

v
-
v
co
v
R
-
v
ci
v
ci
≤
v
≤
v
R
P
R
v
R
≤
v
≤
v
co
.

### Claim 3 (depends on 1)

The power system reliability assessment method considering optimized scheduling of cascade hydropower stations according to claim 1, wherein, in the step S7, the determination of convergence or not is performed by determining whether a coefficient of variance 67 is less than or equal to a set value, the coefficient of variance being expressed by:
δ
=
S

t

d

(
L

O

E

E
)
N
s
×
mean

(
LOE
